J. H. Davidson B2S J January 7, 1972 NC ESTER REQUIREMENTS E.M. POTTER B2N K C. F. Taylor B2N K
C. L. Bradford
B2S G
L.R. Stark/P. D. Fowlkes W4A
J.F. Herber
T3G
J. R. Savage
B2S L
E. D. Malone
1760
R.L. Wagner
1760
J.L. Solari
1760
R.M. Kounta
F4W A
D.H. BoUlger
F4WC
At the Pydraul reformulation meeting I agreed to forward what we feel will be the maximum amount of NC phosphate and N,C phosphate that jmight be required between now and June 30. Our best estimate is 2.4 M pounds of tha straight esters (NCP 4 NgCP). This is based on losing no business in the transition and having several General Motors plants drain their present fluid and refill with new Quid. As I recall, withjplans proceeding as they now stand, we could produce approximately 1. 6 M pounds of straight ester before June 30 and this will meet (barely) our projected sales forecast (total of 40% loss of business). If we are going to operate with more than aero inventory and if we are going to be prepared for the possibility of keeping more business than projected in the forecast, action will have to be taken to get a second reactor line on stream in EE Building. We can discuss this at the next scheduled meeting (1/25) or sooner if yon or copyees feel we should.
Concerning initial blending of the Pydraul E series fluids, the following quantities should be made up by Central Blending as soon as possible. We will have a number of customers requiring a few drums for testing purposes with the heaviest and earliest demand for Pydraul 50 E and Pydraul 65 E.
Pydraul 30 E Pydraul 50 E Pydraul 65 E Pydraul 90 E Pydraul 115 E
10 drums 100 drums 100 drums 10 drums 10 drums (on hand)