Attached is a copy of dust counts and temperatures
recorded underground working places at your Colonial and
Wittonoom mines
Also the results of dust counts taken in
the treatment plent
;
You will observe that the dust counts
ere
underground very high
through working places { air made flow - volume of
These could be lowered by ensuring that's grester v^
is
to
the
|
:
i.
fb.
wy
os
00
a
5
OF,
ETxohtaaulstmessured fan 28,750cfm - ot
Intake
before befor|e
Hain Adit
28,750cfm
No.1 No.1 South Drive Fluctustes
may even reverse
No.2 South Drive 4,950cfm
No.3 South Drive 27,000cfm
. 60,700cfm
Wittenoom Mine
`
Exhaust messured post fan
Intake through new portsl
50,625cfm
32,650cfm
Air
is lost through the doors in the following
Through
"
door to 1181
"
1200
" * 1600
"
* 2000
*
2400
Crosscut 3,120cfm 3,120cfm
Crosscut 6,430 * Cros--out 9,100 * Crosscut 5.200 "
Crossout 6,600 *
-
quantities
Yours feithfully
7
DISTRICT INSPECTOR OF MINES
J.
N. PLAINTIFF'S
Bayonne
Bayon e
EXHIBIT
Bayonne
Bayonne
PENGAD
PENGAD
PENGAD
.
/ State Mining Engineer Mines Deportment PERTH
3
KALGOORLIE 23rd August 19
the mejor airflows I visited Wittenoom during the period 13th to 17th
August and inspected inspected underground working places both Colonie .
and Wittenoom mines made messurements of
and
inspected and secured duet counts in the treatment plant A copy
of the temperatures and dust counts recorded at places is
The majority of the ore is now being won from the Col-
oniel mine where about 20 machines are engaged on stoping opera-
tions
These machines break the ore on one shift and on the
shift opposite to the machines scrapers are used to clean the face
is and move the broken ore into the passes
The ratio approximate
one scraper party to two machines
Development is carried out by
three parties and appears to be legging behind
At the Witten-
com mine the operations are now purely on a selvage basis
81x
scraper parties are engaged closning the broken ore from stopes and this is expected to be completed by the end of the current month
were Air measurementa These
neter and resulted
made using a vane anemo-
Colonial Mine : Exhaust
.
68,500cfm 68,500cfm
.
Intake through Mein Adit 28,750cfm 10
through No.1 South Drive Plustustes
.
may even revurse
It
bad
No.2 South Drive 4,950cfm 4,950cfm
ve
Fluctuates
. % No.3.South No.3.South Drive 27,000af^
Total Inteka
~~ 700cfm .
N.B. In previous reports No.1 South Drive and No.2 South Drive | have been referred to a No.1 Cliff Opening and No.2 Cliff Opening respectively but the new titles are those now adopted at the mine
to The shove figures for sirflow indicate that a large vol-
ume of oir is passing through the mine which is correct but the
path the sir takes is variable
At one time the velocity of the
sir entering through the main adit is very strong whilst short
time later the velocity is practically negligible and the air must
be entering the mine through another opening
The airflow through
the No.1 South Drive is very smell as an intake and at times has
been messured as reversing In fact there is no positive sirflow
through the intake openings and no constant peth that the sir adopt
The cause is attributable to the air currents in the gorges and slo
the walls of the gorge
In order improve the airflow it will b
necessary to instal doors regulators and fans to induce the re-
quired sirflow
The ausention of the mine management was drawn to
this matter as well as the need for the air to be prevented from
short circuiting directly to the mein fan without passing through
working places
The fan inducing the airflow is a 60 Axial Flow fan 10stalled at an opening to the mine workings on the mastern cliff fue
500 rect north of the main sdit
Wittenoom Mine Exhaust . Intake through New Portsl
50,625cf 50,625cf
32,650cr
The discrepancy between Intake and Exhousted air is 17,975cfm
which is probably being short circuited to the fen through the
effective sealing of old edit o onings and
poor stopping at
fen itself
see
.
inthe
nye
.
a
132
132
For the smount of work proceeding in this mine the
32,650 cubic feet per minute entering the mine is adequate although
more air could be made to extend to the bottom of the mine to vent-
ilate the 2700 stopes
The loukages through the doors does im-
prove conditions in some stopes
The losses through the doors are
tabulated below
Intake through now portal Lost through door in 1181 Crosscut . Lost through door in 1200 Crosscut
Flow along 1180 Drive Lost through door in 1600 Crosscut
Flow along 1180 Drive Lost through door in 2000 Crosscut
Flow #long 1180 Drive Lost through door in 2400 Crosscut
Flow along 1180 Drive
32,650cfm
"
3,120
*
6,430
"
23,100
"
9,100
"
14,000
"
5,200
"
8.800 *
600
"
2,200
This 2,200cfm flows to sir eventually resches atopes etc.
the the
2700 stopes
exhaust fan
and joining with the by way of old worked
other out
Dust Counts The attached figures sppear to me to be
i very high for the underground workings
Whilst I do consider
that attention could be given to improve the air circuit through
the mine conditions underground were satisfactory and is evidenced
by the wet and bulb temperstures
Compressed water jete
Hre supplied at the ore passes into which the ore is scraped
During seventy five percent of the time I spent at the Colonial
mine water was not available due to the main water pipe to the mine
being broken
This caused boring operations to be suspended but
did not effect the scraping which continued irrespective of water
being available or not
With the instrument used for taking the
sample of dust there is ' tendency particularly in a dusty atmos-
phero for future sections of the glass slide to be poluted
I
feel then that the results obtained under these conditions for the
dust samples are not a true indication of the dust content of the
air
Trestmont Plant Little visible improvement was evident
to the external appearance of the treatment plent
However much
is being attempted in an endeavour to improve the dust collection
That suction of the pl^,ntwhich includes the Rolla Kubit brosker
and screena has been totally enclosed and fitted with exhaust ducts
which connect to ducting leading to a Rotoclone dust collector
This dust collection appeara satisfactory
Another Rotoclone unit
is installed but sa yet has not been permamently connected to the
roof discharge from the fibre collecting cyclones
An inadequate
supply of power was given a one reason
When connected @ greet
improvement is expected
Foundations for a third Rotoclone dust
collector have been commenced
It is anticipated this will exhaus
dust crested at the crushing units inside the plant building
Plens h^,ve been prepared for the construction of a new
treatment plant st the Colonial mine
Bulldozers were in operatio
levelling out fill for the foundation for the site
The high cle-
vation of the entrance to the mine on the gorge fuce and the f^,ll
into the velley of the gorge should assist in the plant layout Th
first construction anticipated is the instelletion of a conveyor
belt in the lower tunnel to convey the ore from the mine bin to a
jew crusher thence to a Symmons crusher and to a storage bin
The
ore will be carted by trucks from this bin to the treatment plant i
Wittenoom gorge whilst the remeinder of the plant is constructed
General At present the fibre being recovered is in the
vicinity of 1000 tons per four weekly period and tala from the
treatment of 17,000 tons of ore
It is envisaged that a tonnage
of 40,000 tons of ore per four weekly period will be si^
...
oe
wet
3
c
i4
i4 i4
and This will call for incressed working stopes
development will
have to be stepped up
All this will require improved ventilation
\ and possibly the sinking of a ventilation shoft from the top of
eam the hill will be necessary sooner then is anticipated at the
moment
DISTRICT INSPECTOR OF MINSS
TAPILATION TAPILATION OF DUST COUNTS
me an
Ry 439888-
MIKE
DATE
TEMPERATURE
PLACE
,
COUNT DRY WIT
REMARKS
PATTERMeR Feel aee ftLL en em
Dis Be 57
Olonial lling_
650 75 section Culling Culling
6.
f1040 stope Cutting 6040_ 6040_ "
Pee
Li
_600_
-76- -76-76-
:
.
GL_Horing GL_Horing GL_Horing20 Coal fea_enuisting
5 - dosing Through air
5
Stopa drive Dono
5010 3, Ssation
innstiller
:
...77
...
1000 75
icraping.ist installed icraping.ist opponite_shift 119 icraping.ist Semping FonFon
64 icraping.ist
icraping.ist :
instaled
mid-
Bicos
during
sofeping apore-
Ptasofd epinga aporei - a eS t
5020
N
6010 yoy,
2,
ae
6020 st : 1020 chu
10s 20 tops Sootion 4020 stops drive
_
1000
16 usiRintoped_nowats grroouguhgh 110000+ 00 nKo.Pt. Ritoped_no_watous sing -1000-
76Se -H]Ssose Langs.
*
7h 67-
Lil
w
*
79 -70
-74-74-
39berma3i9bnermain39be3r9bmeramaiin3n9bermain
not
Be 72- springair
67 spring air Ritopped_no_watos
Chrough te.) a
CJ
oir
by
Ritopped_no_watos
spray
spray
Vent -by
mschino iulo no vster Through air
>
Sel
rs
eee nee 1010__ 1010-
1050
"
R.K Scotion
" oe
Ed
a
-N.M.
C2
4050
a, LJ
20250050 " rate,
:
2050
2050
Chut^'
79 62-
Muchine idle no water
Through .
-74- -59-
1
Ld
M
*
70.5
M
*
77- at
65phine Kired neles Doid -7-979
65phine
jule
60
71
and Secondary-
operations required s
60
Ventilation Ventilation
-60-
-60- ELIGII Korppingoperations
operations un--
tet
.65
51
intake
15 BB?
_
0.3 0.3 Strimpinge
9020 chute
110.5 unika Couth
-9050_11 u0
g^rgefrom through5, joicing
clms
mech 250
59
Pet
59
'
ye
clean up by bogging thebroken ors fromrise
sog ing sog ing soon and Stripsing
.490
62
so n
trucku
thegrippings gripingsVent
_ DrivHare th
by iling
pra_hung pra_hung up
Ho.1 2050_thuse
900
ceca 1110.2011.0.22 "
2
ony
-2050- -2050-
10001
[aan
Seen trucku Tre berred down
ST, 3464756 2
DATE
MTHE
BLUE ASBESTOS LTD
57 1557 Mine
TARULATION OF DUST COUNTS
TARULATION
)
TEMPERATURE
PLACE
COUNT DRY I WEY
ALB
REMARKS
No.4 DrDrive ivNorteh
270 74
Boring machine :
6364
Kinara
shift be cleancedleaned up
-
-
-
BrokenNo.3 contri-
No.3 convyBk8t convyBk8tt Transfer
onto 1000+
540
Transfer fromConveyor
Main In_botom_adit
In_bottom_adit
380
In_bottom_adit 2080 driva Neat -750 Stope 2010 Lonar Beam Stope
GNAR
8. Section_400 Section_400
72
2010
Atopa
73
# _16 -8-57 | -8-57 -8-57 Wittencom 2702 Scraping
270 78
maRitggineg rial 76 Boraping RigginRgboltoorrinBguggRiinng Charging holes
_5_685N8i_g3hNtisgihontstion_58_Nightsstione_58Nightsionarleequ18<X7ir2-98Fe8 dfon
2004 Scraping
#
2404
N
--
2004
150. 79
-390-540
through 70
ain: rp atoper
att
in
ChangiCne hangine
Horipingt 2001 Lower Horipingt
400
2001 Middle StopeLongneHoripwngt Portel -530 Dust plent InInttaakkeeo of f airthroughthrougth hrough
Horipingt -530 Portel 270
58 through stope
Through_air__open_stope Through_air_open_stope Through_air__open_stope
66
from treatment
polluting-
_
.
.
Cee
eee et
DISTRICT INSPECTOR
:
, ieebiewes
vee ymin etee
wa
16 ~ 8-57 8-57 8-57
TABULATION OF DUST COUNTS
:
)
TEMPERATURE
| PLACE
.
COUNT DAY WET
.
Trustment Plent
No.1 No.1 & Roso Ohmin Feeder from
No.2A Conveyor belt
Feed to Blake Jaw Crusner
Jacques Crusher Vicinity Praylor orusher
Vicinity Vicnity Nymons fro to bolt
Vicinity of Cobra M111
Nolls
for Nolls and
Operating platform
420
250
360 540
730 1000+ 1000+
. 480
Operatore platform vicinityfibre-
420
fordons fibre-
^^lisation^^lisation
- Vicinity of Mos.3 & 4 Trommels
440
| nagging section -
Ragging section
Centro of fibre storage room
Outside plant Vicinity of
.
Plant office
a
360
2000+
210
100
K.S. 299
ee REMARKS
Oparatora plytHigrh co untfddm unt due grobably to diet discharged from
.
At the plakora positions
Operators platform
.
Crushor stopedplatform Somple teken at op
Men employed cleaning up around here Seaphinpaauiaarecemeg ainsi tales
:
_.*
:
enclosed
enclosed P
totaly
totaly
his scotion totally lesding
enclosed and
to Roto-
neated
to
;
dust
collection es
unit i
:
:
Weighing bog .
:
.
Two men working here filling bega
~
Bags being loaded onto truck outside
.
:
i
:
eee
nl Farchney
HOT
INSPECTOR
NIMES