Document DE8ZVZ72JxGozB9M0NJj4KJ5

FRAZER FAINT COMFANY 2475 Hubbard Avenue Detroit, Michigan SCHEDULE I TRADE NAME: CATEGORY: COLOR: QUALITY: Cincrete Cement, Brick & Stucco Paint White First Pigment: 66# Cryptone M.S. Leaded Zinc Lithopone Vehicle: 3k% Raw Linseed Oil Varnish Drier^ Anti-Skin Solution Turpentine Mineral Snirits Lbs. 676 400 165 379 .. 100 25` 4 54 ez Yield in Gallons Unit Cost Total Cost Weight per gallon finished product. .06 40.56 .07 28.00 .045 _ZiM Storage & handling 00s t through loss - 1# laboratory record 15.6 lbs. .13 .18 49.27 18.00 .07 1.75 .05 .20 .10 5.4o .015 1 1.23 Storage 4 handling cost through loss - 75.99 .76 75.85 2.28 Calculated Yield Ifenufacturing Loss - z}% Actual Yield 18?5 R.120.8 117.8 Cost Analysis: Material cost per gallon Direct labor cost per gallon Factory overhead per gallon Bulk cost per-gallon ' Complete package cost per gallon, including filling charge Factory cost in package per gallon FRICES (a) To a company owned or controlled outlet (b) To an independent wholesaler (c) By company owned or controlled outlet to retail customer (d) To an independent retailer (Dealer) (e) To other (Industrial) (Contractor) 154.88 1.31 .12 .05 1,48 .19 1.67 None None 325 2.44 2.76 2.55 N 5142