Document DDozzGb0RLLRaEgO8qBYM2Qro

AIRBORNE DUST COUNTS for Uvalde Rock Asphalt Co. Houston, TX. PLAINTIFF'S EXHIBIT UC-2899 December 28, 1972 Personnel Present: D. Dewan Uvalde G. L. Dickson Union Carbide Corporation E. J. Kleber Union Carbide Corporation UNION CARBIDE CORPORATION Mining and Metals Division Niagara Falls, New York *238 88 UCC 015965 1 DESCRIPTION OF PLANT AND TESTS Tests were conducted November 16, 1972 at Uvalde Rock Asphalt Co., a manufacturer of floor tile. Samples were collected at tile base blenders. Line "D" and Line "A." Line "D" samples were "Calidria" Asbestos SG-100, and Line "A" was 7RC. APPARATUS AND PROCEDURE Sampling and dust counting were carried out in accordance with OSHA Regulation 1910.93a, using the Bayer, Zummalde and Brown method for counting asbestos fibers by phase contrast microscopy (Bureau of Occupational Safety and Health, Feb. 1969). Battery powered air oumps (M.S.A. type) calibrated to 2 liters per minute were used' to collect personal breathing zone and environmental samples on Millipore membrane filters of 0.8 micron porosity. Fiber counting was performed on a Leitz microscope utilizing phase contrast illumina tion at 400X and a Patterson Globe and Circle reticle. Total dust was determined by light field microscopy at 100X. TEST RESULTS Two figures have been reported for each samole. They are: 1) Total Fiber - Any material 5 microns or longer having an aspect ratio of 3 or greater. Reported as fibers per milliliter. 2) Total Dust - Any fiber or particle present. Reported as million particles per cubic foot. UCC 015966 A23869 N.B. No. 1929-62-1 Field No. 128 1929-62-2 1929-62-3 47 42 SUMMARY OF DUST COUNTS Description Personal - Tile base blender "D" line operator (1S.0 min.) adding 500 lb. SG-100. Monitored throughout entire cycle. Personal - Same as above, during dumping only. (2.S min.) Personal - Tile base blender "A" line operator [4.5 min.) adding 600 lb. 7RC. Asbestos Count Fibers/ml _> 5.7 12.8 12.7 Total Dust mppcf 5.0 18.2 20.3 UCC 015967 A2387C