Document DDobpL37ybOBrDG9vEJjxV6NB

SIX MONTHS REVIEW ORGANIC PRODUCTION AND MATERIAL HANDLING DEPARTMENTS LONG TERM OBJECTIVES AND 1966 GOALS AND ACTION September 7, 1966 LONG TERM OBJECTIVES A. Establish, maintain, and supervise procedures and policies to insure the safety of personnel and property. B. Maintain and improve the production, and on-time delivery of uniform quality products within competitive specification. C. To achieve by direct supervision, planning, and process control, the minimum short range costs. D. To generate, assist in development, and implementation of process improvements to achieve long term minimum costs. E. Effectively train and utilize all personnel to effect long term minimum costs, and provide for growth of facilities. 1966 GOALS AND ACTION A. Establish, maintain, and supervise procedures and policies to insure the safety of personnel and property. 1. Operate with no lost time accidents, no near-miss accidents, and achieve a serious injury index of less than 9.0. 1 lost time accident - Martin 2 serious (Jackson, Beard) Index - 20.6 2. Complete a minimum of 20 significant safety improvements during the year. 3. Conduct Bi-annual safety audit on all operations and facilities. 4. Safety awareness, and training to be constantly improved by monthly departmental meetings and day-by-day contacts. 5. Safety and Housekeeping inspection to be conducted by superintendent with responsible foreman and/or supervisor. Housekeeping level to be to satisfaction of Plant Manager. Responsibility - Superintendent B. Maintain and improve the production, and on-time delivery of uniform quality products within competitive specification. 1. Achieve average quality score of 97.0 and R.F.T. Index of 98.0. Quality Score - 98.1 R.F.T. Index - 98.5 DSW 551794 STLCOPCB4090211 Six Months Review 1966 Goals end Action 2. 2. Achieve a quality complaint index of 2.5 per 100M pounds production, or no more than 4 justifiable complaints. Complaint Index - 3.0 Complaints TD - 4 3. Achieve a service complaint index of 4.0 per 100 M pounds of production, or no more than 8 justifiable complaints. Index - 9.0 Complaints TD - 12 4. Attain a minimum of 4 significant product quality improvements, and 2 service improvements. 5. Achieve 98% on-time shipments. 96% C. To achieve by direct supervision, planning, and process control, the minimum short range costs. 1. Generate raw material savings of $133,400 from 1965 practices by obtaining the following yield improvements: 1965 Material Actual Biphenyl Group 1966 Target 1st 6 Mos. Actual Targeted Savings Dollar Savings or Loss* Benzene (% of 99.76 theory) Isopropanol 0.727 99.00 0 100.6 0 $12,600* 17,600 $19,700 10,400 Acetone 0.189 0.650 1.004 7,200* 7,500* Santowax C (S.R.) Raney Nickel 119.0 0.057 116.5 0.05 114.767 0.062 7,400 1,000 7,900 500* Santowax R 102.5 101.5 101.500 2.800 2.000 Aroclor Group $ 9,000 $32,000 Biphenyl (% of 95.5 theory) HC1 Credit 37.2 (L.A.) Santowax R 85.5 (% of theory) HCl Credit 70.4 (S.A.) Limestone 64.6 97.0 49.0 87.0 75.5 40.0 96.77 41.245 73.2 62.267 45.047 $14,200 59,000 2,300 5 ,400 4,600 $10,900 13,000 16,500* 6,100* 2,000 Anhydrous HCl 117.65 116.0 117.650 . UP0 0 Targeted Losses $90,200 $ 3,300 --------- DSW 551795 STLCOPCB4090212 Six Months Review 1966 Goals and Action Material 1965 Actual PNP Group KC1 142.44 PNCB 117.37 NaOH 74.97 1966 Target 140.00 116.5 73.0 1st 6 Mos. Actual 3. Targeted Savings Dollar Savings or Loss* 143.377 116.969 73.058 $11,100 15,500 7.600 $34,200 $ 2,100* 3,500 3.600 $ 5,000 $133,400 $40,300 Total raw material usages for Organic Division products represents a loss of $84,200 from 1965*s practice versus targeted savings of $89,700 for the period. Principal over usage is in mercury which accounts for a loss of $102,900. 2. Labor utilization (hrs/cwt.) to be improved to achieve the following: Product 1965 Actual 1966 Target Usage TD Equiv. Manhours Biphenyl Santowax R HB-40 Liquid Aroclors Solid Aroclors Muriatic Acid C12 - NaOH KOH PNP 0.067 0.09 0.151 0.062 0.202 0.034 0.046 0.062 0.164 0.063 0.085 0.140 0.058 0.170 0.031 0.044 0.060 0.130 0.054 0.070 0.117 0.052 0.174 0.023 0.045 0.061 0.134 Total 2,939 1,282 1,354 1,982 1,667 1,031 187 91 2.445 12,978 Total production manhours in 1966 through June was 67 ,340 versus 58,954 in same period of 1965, or a gain of 8,386 hours. The gain is principally attributable to the additional labor (7,356 hours) for PNP operations not required in first four months of 1965, and 1,623 manhours required to man the expanded Solid Aroclor operations. The 1,623 hours is equivalent to 9.4 man months, or the estimated 1.5 men added to the work force to man the utility operator's job around the clock. 1965 1966 Pounds per produced/labor hours 91.157 M Lbs. . 113.209 M Lbs. . . 58,954 = 1545 Lbs. 67,340 e 1680 Lbs. .............. 0SW55AT STLCOPCB4090213 Six Months Review 1966 Goals and Action 4. 3. Improve variable direct manufacturing costs other than labor at a rate at least equal to volume increases. Product 1966 D.C. 1965 D.C. Savings Direct $/Cwt. Gain or Loss* Biphenyl 0.838 1.029 0.191 $43,200 Santowax R HB-40 0.343 0.408 0.494 0.404 0.151 0.004* 9,700 200* Liquid Aroclors 0.648 0.548 0.100* 23,200* Solid Aroclors 1.556 2.101 0.545 23,900 Muriatic Acid 0.465 0.537 0.072 7,800 CI2 - NaOH 0.631 0.670 0.039 8,400 KOH 1.960 1.841 0.119* 10,900* PNP 1.313 1.741 0.428 34.900 $93,600 Dollar Improvement 93,600 Total Dollar Directs 903,500 __ 1U*^% Volume Increase = 1,132 912 = /o 4. Reduce process downtime to less than 1.57. and other downtime to less than 2.0%. Process downtime to be improved by elimination of pluggage, and bottlenecking problems; other downtime to be improved by better scheduling, and development of surge capacity between departments. Repair Process Other 3.6 3.3 3.2 On-Stream 89.9 5. Actively generate, and assist in the development of specific cost reduction items to achieve savings of $420 M in 1966. . $221 M through 1st six months 6. Improve material handling costs at least equal to rate of volume increases. 55V91 STLCOPCB4090214 Six Months Review 1966 Goals and Action 5. D. To generate, assist in development, and implementation of process improvements to achieve long term minimum costs. . 1. Assist in development of scope, and provide liaison for Warehousing Facilities. Assisted as needed 2. Assist in development of scope, and provide liaison for modernization of Aroclor-Biphenyl-HB-40 finished goods handling. Little or no achievement 3. Provide production liaison for Biphenyl Still Project, and have start-up plans completed by 11/1/66. Achieve design premises by 1/1/67. Continuing 4. Complete start-up of silicon diodes rectifiers in Chlorine Plant, and achieve design premises 45 days of completion of construction. Continuing 5. Establish and supervise effective process control of Chlorine facilities by 6/1/66. Program and weekly liaison meetings achieving control 6. Evaluate and implement improvements to Aroclor treatment, and filtration facilities. Scope developed by 6/1/66. Assisting in evaluation 7. Audit all reports and records for possible simplification, or elimination by 10/1/66. 8. Develop measurements and controls for "Work to Assist" and "Plant Improve ment" costs by 5/1/66. ' 9. Generate a minimum of 3 significant increases in production capabilities. 10. Actively assist, and provide process control and information on terphenyl recycle research program. In process 11. Develop program for upgrading of HB-40 facility - Project for dismantling by 2/1/66. Autoclave Project by 4/1/66. Dismantling Project completed DSW 551798 STLCOPCB4090215 Six Months Review 1966 Goals and Action 6. E. Effectively train and utilize all personnel to effect long term minimum costs, and provide for growth of facilities. 1. Complete F.L.I.T. training all personnel by 6/1/66. 2. Continue development of Process Function Outlines. All department PFO's, and operator training to be completed by 1/1/67. 3. Devise next phase in Operator Training Program by 10/1/66. A, All Operating Instructions, and Standard Manufacturing Processes to be current by 10/1/66. 5. Develop more objective Position Guides for all personnel. Guides to be keyed to objectives, and Position Specification by 3/1/66. 6. Conduct at least 2 Supervisory Training Meetings during the year. DSW 551799 STLCOPCB4090216