Document DDeeVQb92xrz62RLoRbGL57R5
.Federal Register / Vol. 51, No. 119 / Friday, June 20. 1986 /.Notices
22S59
Decommissioning. Approval, Humboldt County. Due: August 15. 1986. Published FR 5-2-86--Review Period extended.
Daled: June 17,1906.
Willinn D. Dickerson.
Acting Director. Office ofFederal Activities
(FR Doc. 86-14019 Filed 6-19-80: 8:45 um|
BILL1HO CODE 6SCO-SO-M
IER-FRL-3031-11
Environmental Impact Statements and Regulations; Availability of EPA Comments
Availability of EPA comments prepared May 27,1986 through May 30. 1986 pursuant to the Environmenlal Review Process (F.RP). under Section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmenlal Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at (202) 362-5076/73. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in FR daled February 7,1986 (51 FR 4804).
Draft EISs
ERP No. D-BLM-C70002-NM, Rating 1.0, Carlsbad Resource Area, Resource Mgmt. Plan. NM. SUMMARY: EPA expressed no objection to the proposed action as described in the draft EIS.
ERP No. DS-COE-A36034-CA. Rating EC2, Corte Madera Creek Flood Control Project, Unit No. 4, Update Modifications. CA. SUMMARY; EPA expressed concerns that .the project could have significant adverse impacts . on Corte Madera Creek's water quality and beneficial u9es. especially fisheries. The final EIS also should more clearly discuss the design, impacts and proposed mitigation of two other alternatives discussed in the draft supplemental EIS.
ERP No. D-FHW--E40692-CA. Rating EC2.1--20 Widening, Hill Street to Columbia Drive. Right-of-Way Acquisition. CA. SUMMARY: EPA's primary concerns were with the inadequate alternative, air quality, noise, and water quality analysis. EPA. therefore, requested considera lion of mass transit alternatives, an inlerscctional air quality analysis, total project hydrocarbon emissions data, a non-build air quality analysis, more definitive noise abatement information, and mitigation for a proposed channel relocation. .
Final EISs .
Draft EIS9
ERP No. F-FHW-K40105-CA. CA-1 Improvement. Devil's Slide, Half Moon Bay Airport to I.inda Mar Boulevard, 404 Permit, CA. SUMMARY: EPA had serious concerns with proposed wetland impacts and the lack of adequate mitigation. Additional air data was also requested.
ERP No. F-FHW-K40152-AZ. Arizona Forest Hwy. l/AZ-67 Reconstruction, |ucob Lake to Grand Canyon Nat'l Park, AZ. SUMMARY: EPA indicated that the final EIS adequately assessed the environmental impact of the proposed action.
ERP No. F-SCS-C3B131-IJV, Mill Haven Watershed Flood Prevention and Drainage Plan, LA. SUMMARY: EPA expressed no objection to the proposed action with proper implementation of mitigation measures as described.
Amended Notice
The following review should have appeared in the FR Notice published on May 23,1986.
ERP No. F-AKS-J65101-MT. Beaverhead Nat'l Forest. Land and Resource Mgmt. Plan. MT. SUMMARY: EPA is pleased that (lie Forest had committed.to redesign or drop projects that cannot meet Stale of Montana water quality standards. Since the application of Best Management Practices (BMPs) does not necessarily protect water quality and stream use. the effectiveness of BMPs must be continuously evaluated with water quality, watershed; and fisheries monitoring programs. If necessary, corrective actions must be implemented.
Dated: June 17,1966.
William D. Dickerson. Acting Director. Office ofFederal Activities.
(FR Doc. 88-14021 Filed 6-19-86: 8:45 am)
8IU.IN0 CODE 6560-S0-M
IER-FRL-3034-6]
Environmental Impact Statements end Regulations; Availability of EPA Comments
Availability of EPA comments prepared June 2,1988 through June 6. 1988 pursuant to the Environmental Review Process (ERP). under Section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at (202) 382-5076/73. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in FR dated February 7,1988 (51 FR 4804).
ERP No. D-AFS-J65145-MT, Rating
EC1. Dcerlodge Nat'l Forest. Noxious
Weed and Poisonous Plant Control
Program, MT. SUMMARY: EPA
endorses control of noxious weeds and
supports the integrated pest
management alternative described in
this draft EIS. EPA stresses that
technical comments and
j
recommendations provided by the
Montana Department of Agriculture,
Environmental Management Division,
should be. carefully followed and
pesticide applications must be made
only by certified applicators or
operators,
1
ERP No. D-BLM-K70001-CA, Ra ling
EC2. California Desert Conservation
Area Plan. Amendments. CA.
SUMMARY: EPA expressed concerns
that two amendments to the Plan did not
discuss impacts to 9oil, air and water,
and recommended that the Bureau of
Land Management discuss them in the
final EIS.
ERP No. DS-CDB-KB90558-CA. Rating
1.0. Oakland Chinatown Redevelopment
Project. Construction. Additional
Information, Grants. CA. SUMMARY:.
EPA has no objections to the project, but
commented on air quality aspects of the
draft supplemental EIS.
ERP No. D-COE-F32136-1N. Rating
E02. Indiana Harbor Confined Disposal
Facility (CDF), and Maintenance
Dredging. Construction. IN. SUMMARY:
EPA expressed objections to the
proposed activity because of unresolved
concerns related to seepage, upstream
contaminants, monitoring, and
maintenance. More information was
requested regarding the extent and
location of the contamination within
proposed dredge areas, dredging
operations, the relationship between
sediment characteristics and water
quality, design and operation, and .
wildlife impacts. In addition. EPA felt
that it could hot support the
recommended CDF location until a
suitable ujiland site is located and
assessed as a potential alternative...
ERP No. D-COE-F40266-IL. Rating
E02, North-South Tollway Construction.
Fill Material Discharge. Lily Cache
Creek and DuPage River, Sect. 404
Permit, 1L. SUMMARY: EPA's review
resulted in objections because of
unacceptable impacts to water quality
and wetlands.
Additionally, the Morten Arboretum,
a unique collection of woody species
from temperate regions, would be
adversely affected by the proposed
tollway. More information, regarding air
quality, noise, salt spray, water quality,
1
r
f
GLEASON-000824