Document DDa2ordrdZ6jYDjZgx5qRrw94

/ P. O. BOX 4858 CORPUS CHRIST), TEXAS 78408 BERRY CONTRACTING, INC Industrial Contractors PLAINTIFF'S EXHIBIT 14)4 CORN PRODUCTS ROAD AC 512 884-0373 TELEX 778446 October 24, 1979 Mr. T. C. Covert Coastal States Petrochemical Co. P.0. Drawer 521 Corpus Christi, Texas 78403 Dear Mr. Covert: Enclosed please find revised labor rate sheets for the Operating Engineers. These revised rates are the result of a negotiated wage increase and are effective as of October 1, 1979. We would also like to take this opportunity to update our equipment rental rates with the following items which have recently been added to our rental equipment fleet. 140G Maintainer John Deer 450 Crawler Loader Backhoe -225 Cat Crawler Backhoe, 1 C.Y. Cap. 245 Cat Crawler Backhoe, 3 C.Y. Cap. 20 Ton Hydraulic Cherry Picker 50 Ton Hydraulic Crane 50 Ton Crawler Crane $ 51.50/Hr. $ 35.00/Hr. $ 62.50/Hr. $115.00/Hr. $ 40.00/Hr. $ 90.00/Hr. $ 70.00/Hr. We would appreciate your incorporating these revised rates into our rate sheets currently on file at the refinery, and thank you for the opportunity of submitting this additional rate information. Sincerely, BERRY CONTRACTING, INC. jw Enclosure Vice President CED0006117