Document DDVz87gmDNpdVbpJ8DK0KkL9d

FIRE AND EXPLOSION INDEX MANUFACTURING UNIT LIGHT HYDROCARBON H PROCESS UNIT STORAGE AREA 2D-30A/B AND 2D-220 A/B/C/D BACKGROUND INFORMATION FOR STORAGE AREA: Tlie 2D-30's are the storage drams for product propylene. The 2D-220's are the product ethylene storage drains. The 2D-30's are 69 feet 8 inches in lenght and 10 feet in diameter. The 2D-220's are 69 feet 8 inches in lenght and 10 feet in diameter. The normal operating conditions are for two of the ethylene storage drams to be empty and for one of the propylene storage drums to be empty. The levels are ran to where we have approimately 1 product drum of propylene and ethylene. Volume for the dram is calculated below: V=tit*H V=Jt(5)2 (69.75) 5,478 cf V= 2 (ethylene drum 50 % level) + 2 (ethylene dram empty) V = 1 (propylene drum 30 % level) + l(propylene drum 60 % level) THIS IS NORMAL OPERATING CONDITIONS!! V = 2 (5,478( 50)) + 2 ( 5,478 (0)) = 5478cf (30 Ib/cf>=164,340 Ethylene volume V = 1 (5,478 (.30)) + 1 (5,478 (.6) = 4930.2cf (30 Ib/cf) = 147,906 Propylene volume The volume of flammable product was calculated to be 164,340 lbs. of ethylene. No propylene was taken in the consideration. The dram operate with no cross ties. Material Factor (from Appendix A of Fire & Explosion Index Hazard Classification Guide) He Flash Boiling v Compound /; MF BTU/LB nH Nr Nr ; Point;'- Point xlO3 <F) (F> Ethylene 24 20.8 142 Gas -155 Propylene 21 19.7 141 -162 -54 General Process Hazards: (Information) No penalties were taken for exothermic chemical reactions, endothermic processes, enclosed or indoor process units, and access. Penalties were taken for materia] handling and transfer of 0.85 and 0.5 for drainage and spill control. The penalty for material handling and transfer because of the Np, The penalty for drainage due to the poor drainage in the area and lack of solid surfacing under vessels. 7/10/95 FEI.doc DOW CONFIDENTIAL Special Process Hazards:(Information) A penalty of 0.2 was taken for toxic material. The penalty was calculated by multiplying Nh by 0.2. No penalty was taken for sub-atmospheric pressure due to the pressure the drums run. No penalty was taken for operation in or near flammable range. No penalty was taken for dust explosion. The pressure penalty was 0.73993. No low temperature penalty was taken. The quanitity of flammable/unstable materail was calculated by multiplying the quantity of ethylene in the storage drums by it's heat of combustion. The penalty was found to be. The corrosion and erosion penalty was 0.1. The leakage penalty was 0.1. No penalties were taken for use of fired equipment, hot oil heat exchange system, and rotating equipment Loss Control Credit Factors Process Control Credit Factor (Ci) Emergency Power -0.98 A credit was taken for Emergency Power due to the UPS system. Cooling -1.0 Explosion Control-1.0 Emergency Shutdown-1,0 Computer Control-1.0 Inert Gas-1.0 Operating Instructions/Procedure-1.0 Reactive Chemical Review-0.91 A credit was taken for reactive chemical review. Reactive chemical concerns are listed on MOC sheet and plant personal are trained and tested on reactive chemical concerns at LHC II. Other Process Hazard Analysis- 0.98 for Management of Change Review Material Osolation Credit Factor (C2) Remote Control Valves-1 Dump/Blowdown-1 Drainage-1 Interlock-1 Fire Protection Credit Factor (C3) Leak Detection -.94 LHC n is protected by Bacharach gas detectors. A project is being worked on the elevalate the gas detector system and replace with a more relible system. Structural Steel-1 Fire Water Supply- 0.94 (supply pressure will be approximately 100 psig without pump and 150 psig with pump.) Sprinkler Systems-. 97 A credit was taken for the deluge systems at LHC Q. Water Curtains-1 No credit was taken for the furnace water curtain due to its height and that furnace 1-6 and 19-25 are unprotected are the lower level. Foam-1 Hand Extinguishcrs/Monitors-.97 Cable Protection-1 (This credit would change after completion of the Instrument Upgrade Project) 7/10/95 FEI.doc HWR DOW CONFIDENTIAL DO A 031287 CONFIDFNITIAl FORM IMA MANUFACTURERS' DATA REPORT FOR UNFIRED PRESSURE \ESSELS Allwaste Fora for $ii|lt Cheeber Completely Skop-Fihricittd \eela 0"l) ________ _ AHF BEAIRD. INC.. SHREVEPORT. LOUISIANA l. Ua*I. , 1 b ------------------------------------------!--------------Nfe=-5X3JS^HK5iCT=r I. th craic-U. ocrgAHT, - '"'-i&PfteT- .......... .. Sii'iJuj* >1 (nw _ himh f pwti>*#>) ........ . " ----------------- Ye. Bailt 1969 ........... .... A-i-70-n ti eo.ooo*n!:tmt(i ^.1A*u. Di,,.w. ,,.o_u. * 5MfcU are* ini **.< v*.) )heedn/li -- -- 5 SEAMS: lo"f , mi. La BuHi).T. (v*R*oH*> > .fTlo.aCt O ^c>lpltulSit)rtiiMnj (_VWam n*) Fffiricactr 100--% Gink Rltt H.T.______*0______ No. of Coot-- M --------------------- If rtata4 or hraa*0 fwifbi m tally aaOar .. HEADS. fc)6!:.i.lJWlr0^w TJ. (To. MHO. aa4a> TUcOtu IMIO MO! (>. <fc>. If iMMtUt, Soli* Mtf --qKg7m.ifw:irt..T.r.iu*.imA**i Ml* At'1 Aajla Odot faateaiaf, I, CNitncod bt *m. . llwtWi ootfci** 0t*. 300 p*i Atai.no*. ... . Mia. teap. (whea 250 F. Iea Am -20) _ ItlM . __ll-------------IM I* PWHIFB----ODlIasnwa m (Caavaa aa Ctstml -8od1*1/6"lilCoacev BNlcrKrVUIMal Hfcll Hpdioitatic I _ Paeiaaatic or) Teal F. Coabiaotioo ( Pmi """ '-- . .. 486 pai. SAFETY OR RELIEF VALVE OUTLETS: Naahat 1Sue __ 9. NOFZyZpLpEHS* :(Mt, OvltM. DuIr) NM^tf Dl**. m IU T|f* ftHtiril (2) 1-1/2" 300# Loot Veld Rack Plga. ------------------ m~TrT0 TrT50#WITTI5ci-fTgif-------- ..................... car*" tz) tm~3Qu# Vamrack-Figa;---------- v____ _ Location To of tank 1b ehell Thjahaaaa IA-105-I Bala/ate aaaa< Matartol Ha-- AttaahaB Welded SA-10i-I Welded "'1A-103-I ' Welded INSPECTION OPENINGS: 2Maakole*. No. SUo Haadholea. No. nmM. No. - 18"Locatioa Mm Siaa Locaiioo Locaiioo <11 tech end ef tBBk la h-- <! -- 11. SUPPORTS: Skin Laaa Laaa Oikct /2) SaddlCR ITaa at Ra) UToaocrj OnoM*) (MKtaf Attached Wolfed tp tJnk hell (VM-nSi) 12. REMARKS: Oao 120" X.P. X 77* 3-11/16** O.A. Length 43.084 tf.O. Itorego Teakr .per Beelrd Pun. Order 161910_________________________________________________________________________________________ ISU(liKtltllt iltwtMia ia* ! aa At Yaaa, la* Taaa, i.p.b.. u.-ks latsas. * Usl mMi totataal at samal prtnats *Hh itloMta ttaparatart whaa EttlkOI). V* can It* that Its atataiaaata Asti to tMa W* Hf/jPViW'/SJ all etilli af Oaalia. Malarial, aaaatfwctlaa, *mt atlatoaahlp at tkli mimI aaa#<'mm la tha AMI Cat* fat IWIMf frt'lC Vaaaala. IVOO IdltlOB Dm* 1*10 19 89 Si|*H, AMF BEAIRD. INC. ------------ " (aWUlwsT) * Certificate of Authotiiaiion Eapitea December 31. 1970 CERTIFICATE SHOP INSPECTION VIMtl. mci ev. I ha oMiiltM* AMF BEAIRD. INC. SHREVEPORT. LOUISIANA haI4la* a aaM4 eaaoliAlaa tota4 ha tha Natlaaal eaa4 4 Ballar aa4 Nnvr Vaaaal hattatM aa4/ar N. B. j Mtoit h THE COMMERCIAL UNION INSURANCE COMPANY * NEW YORKhaat toapattah tha praaaara vaaaal AaKiIMt In |HJ amAtiair't <|[| mpml *- 1*10 ha4atata that la tha haat af mr haa*la4f4 aa4 haliaf. tha aaaafac- )^|J ^. inttMtttf ihta pattat vaaaal la aaaaa4aaaa *Mh tha aphUcahla aaattaaaaf tha MU Ballar aa4 praaaara Vaaaal CaOa. a iljDlio ihia cartlflaata aUha> tha feapaetar aar hla aaolar-r oakaa tap narrator, aaraaaa4 a Ipa4. (MCCA| tha proa<wa nMal 4aaarlha4 to thla atmfMtiaar'a Bata aapart. ftothnoait. aalthar tha Inapactar aar hla aopiapar ahall ha llahla to aap ... paraaaal >a|ary at prapartp A--a aa a laaa af aap hto4 arlato hmm at acta4 aaA ihIA toapactlaa. !>>/ pna ____________ __ C--laalaaa hat i Uahrl at Kali aa4V< D0 A CONFTnENTlAl. WR i *U* V / / W"ijJW7 FORM II-1A MANUFACTURERS* DATA REPORT FOR UNFIRED PRESSURE NESSELS Alternate Forte for Single CWeber Completely Shop-Fabricated Vessels Only I ............<f AMF BEAIRD. INC.. SHREVEPORT. LOUI.-L.ufA_______________ ( and addrvir W Ifeatdaciwar) 2. Manufactured far THE DOW CHEMICAL COMPANY. HOUSTON. TEXAS_____________ ptana and addirni w rifimn) 'rnm -v--1 SjfllSfei-1V-*., ) Natl. Bd. No*_ SA-516-70-Fbx no.1-3/4 Cow. 11/,1-6- A cmELL: Marl. A-300-1 . T.S. 70.000# Tfcfc.In. Allow In. Draw. 10 Ft. 0 (iu an* *>. m.) trig, nr r.a, hip.*. Mfa. T..)hea dsT7l6 Yr. Built. 1969 _ lit. Lencd>69 Ft. _ln. ------------------- y SEAMS: Lone Dbl. Butt H.T. Yes (WaMad, Lap. IUI) (Yaa U)I Gittli Dbl. Butt H.T. Yes R.TComplete Sectioned No Eificinarv 100 * (Spat ar Cm|I)I CYi ar Ms) ILTgomplete Sectioned So No. o! Cooties. 10 II rlrrirt or braird tticikr ihm fully wtw SA-516-70-Fbx 4.,,E*DS:aiMfi.m1_ftz300il--------- ^ TJ. (Tie. batten. aada) !) Ends TUehMH 1-3/411 Sadia* Iktbi ____________ at* 2:1 ^ Ayri Angle ________ IttM . T&, Dianatar --Ml T WIIIH-- (Caavaa ar Concave) Concave <b> H refaov.ble, bolt. ..ed ~ (pair.ai M'xnreb iketan----------------- 7. Coo atmetad far was. allowable working been. 475 pal at att.ttap.j Mia. itap. (when F. leaa tkaa -20) . -50 Hydroatatic I _ Pneumatic oil Teat F. Coabiaatioa j Preaa, 752 _ pgj. S. SAFETY OR RELIEF VALVE OUTLETS: Number. Sice 9. NOZZLES: Furpeat (Inlet, OWlat, Drain) Number Dfan. ar Cue Type Mataria I (2) 1-1/2" 300# Lone Weld Neck Figs. (8) 2" (1) 3" 300# Weld Neck Figs. (31 4" (1) 6" (3) 8" 300# Weld Neck Figs. 4" Location Top of Thlekaeee Re in!oriental Malarial SA-350-LF1 SA-350-LF1 SA-350-LFl' tank in shell Attache* Welded Welded Welded m. INSPECTION OPENINGS: Maaholea. No_ Haadbolca, No,_ Threaded, No. . . Sice. .Sice. Sice. 18*' ij>,a.iM Location Locat too (1) Each end of tank In heads -................ .. n. supports: a...(fcg-.S-a--a--.-d>---d---l-e---s----- a,,.^i..A Welded to tank shell AttacBco---------fc Ha.)------------------------------------ 12. REMARKS: One 120M I.D. x 77* 3-11/16" O.A. Length 43.084 W.G. Storage Tank, per Bealrd Dwg. Order 161908 nklrl drxrlpllon of purport a( tha rvaaal as Air Tank. Vatar Tank, L.P.O.. etc --atntr ContaMa. !tf poalareld haal-traatad. 1 Llat atIwr UUamal aa eateaaal proaawaa atltk aalacldafa tv itw* fcaa appllaablo. caalam vWao canliftyy. thnati tnba aetiaiamateantia anardt*v in Ithkilni riwapp.art la tba ASMS Coda lay Unllred Prvatwa Vaaaala. ^^reg^d ^nt^all Lon dataUa al da alga, notarial, caaataiwllan, and Data 2-14 19 69 signed aaKIp ml Hila raaaal Certificate of Authorisation E spires December 31. 197Q CERTIFICATE OF SHOP INSPECTION VtaaiLMADB IV, AMF BEAIRD. INC. at SHREVEPORT, LOUISIANA I IM wtdaralgnrd, balding a valid--------laauod bp lb* Natlanal land ml Boiiar and Praaawa Vaaaal fanpaelare and/ar lb. Mat. ar N. B. m* .-!*< bp COMMERCIAL UNION INSURANCE COMPANY AMERICA __________ bava Inapactad tha praaawa vaaaal daacrlbad In ibla nanufactwir'e dnia tapart aa. ______ 2-14 t_69 andalata Ibat ta IM bvai ml ny knowladfV and ball*I, tba nantdae- tlrst Ml canalraatad Ibla praaawa vaaaal la nee aidant# with iba appUaabla aecliana ml Iba AtMC Sellar and Pioeew# Vaaaal Cada. Bp algnlng tbit can IfMata neither iba Inapecter naa hla anplayar an baa nap warrnMp. aapaaaaad aa lawlled, concerning Iba pree- awa vaaaal deaerlbnd fa Ibla narufaclwer'a data rvpart. Pwtbemera. aaltbar tha faapacta, nar bit anplayar ahall be liabla la any ___ --- (M My paraanal injury or prepany image aa a Ion a al any bind aaiafag Iron ea aanaaetad wch Ibla faapacilan. Daia --- -- , ** fe? DO A 0312S9 C0NFIDFNTIA1 FORM U-1A MANUFACTURERS' DATA REPORT FOR UNFIKED PKESSOKE Alternate Form For Single Outfit b>'r Completely Shop Fabricated Vessels Only As required by the Provisions of the ASME Code Pules and the National Board l. Manufactured hvWilson Engineering i Mftrj - jt, Divl.sinn of-Wilson -S'jpplyKnustan, Jaxa.3 (Nun* and address ot Manufacturer) T. Manufactured for. Thft Dnv CHn-nioal CnTinfLny,----------- Frsgporl, .Igras- (Nam* and address o( Purchaser) s. Type--Horiz- (Horlz. or Vessel No. (_ PVJJ .) (_ SWUO J Nat'l Bd. No._ am. *'V.I JTr. Built. -49#- y 4. SHELL: arat'iA-'^nfi-CLlr.af 70,000 T#k.' Aimv 1/l^Diam-l 0ft.J3___ CL Da.In. Lengthj69_ftB___ SM_toJSM (Kind and Spec. No.) (Fig. or F. B. A Spec. Min. T.S.) 5. SEAMS: T^ng t)nW y BT .Tas J XR Full. (Welded, Dbl,, Single, Lip. Butt) (Yes or No)t (Spot or Complete) (Yes or No) Girth__ DBW . HEADS: (a) Material. y JIT- YffS ^ -X.R- HnneA Mo Nn of Courses. $i-$hZe.gi9. ts. 70 f aoo J (b) >Uterial_SamLdfL y % / U riveted or brazed describe scams fully under remarks. ts. 7n1nnr/' Location (Top, bo'*..- er.is) Thickness Crown Radius Knuckle Radius ElllpUetl Conical .Hemispherical Flat Ratio ^ Apes angle Radius Diameter Side to Presisure OSGOOCT Conicave) (a*.. -iad. J *-30J Mlny- J&L Jlnnoavgr (b)_ If removable, bolts used. (Material. Spec. No.. T.S., Size. Number) .Other fastening. Constructed for mis. 7. tllowiblt wockifig presi.3. -pu. tt mix. tcmp_ Min. temp, (when *F leu dua --20*)_ j=l50_ 8. SAFETY OR RELIEF VALVE OUTLETS: Number. size4w 300 Location (Describe or Attach Sketch) Hrdrofutic t J p. m$eK te_____mi. Shelil / 9. NOZZLES: Purpose. (Inlet Outlet. Drain) Number 1 1 Diam. or Size Type 300# VJ.N. FLG. ?" 300^ W.N.FLG / Reinforcement " * Sch. Rq/, ' ? R" *OQi/W.II.FLG. / . " ^Seb. 80-/ .10 INSPECTION Manholes, No._ 7 .Size 18" 3004 / Location Had_ .... " / How Attached '/>'=!1 d pd Wei d Ad 'Lid Pd OPENINGS Handholes, No.___________ _Size_ ______ Location. Threaded, No.___________ .11 SUPPORTS: SkirtLugs _Size_ -Legs. ______ Location. Other S-'idt' (Yes or No) (Number) (Number) (Describe) Attached VL1 rifid in Shall (Where & How) 12. REMARKS: -Contents of Ves/gl unknown? not to be used in Nuclear or Lethhl Serving. r T A|, cm. QA-, tyj-L,'j: .h- * * ^ l r>y ____ .... ? 4"' 300* V31. FI.G. SA-^50-I.?VA-333-U Sch. 80 7 1 Alteon it T*v>! FLO. SA-ifO-LF* '.-LI d ad -- P.0.47n3qd_T,Fb>t It era 7ft. 220 A_____________ (Brief description of purpose of the vessel, as Air Tank. After Cooler, Jacketed Cooker, etc. State contents of each part.) Z If Postweld Heit.Trested 3 List other internil or extern! pressures with coincident tesspersture when applicable. We certify that the statements made in this report are correct and that all details of design, material, construction, and workmanship of this vessel conform to the ASME Code for Unfired Pressure Vessels. B,--2SLL ' Date. -3*1 -19- g|fried Wi 1 enn Snt*. & ?'fp. Co. (Manufacturer) Certificate of Authorization Expires. December 31. 1957 VESSEL MADE BY CERTIFICATE OF SHOP INSPECTION -.Wfir-c.Q;at.Houstoa^.-lcxas... I, the undersigned, holding a valid commission Issued by the National Board of Boiler and pressure Vessel Inspectors and/or the State of_____and employed by .__________________________________________ jLf---& I Co.___ ______ ___________________ Conn. of--------------- - -- ,,,,--y---------------------------------- have Inspected the pressure vessel described in this manufacturer's data report J. 'i-3-on .-- ---- -- ----- - 19--and state that to the best of my knowledge and beltet, the manufacturer has con structed this pressure vessel In accordance with the applicable sections of the ASME Boiler and Pressure Vessel Code. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the pressure vessel described In this rvmuficturer'i data report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Irlury or property damage or a loss of any kind arising from or connected with this inspection. Date........ i Inspectors Signature _, Texas # 14 Commissions______________ Nat'i Board or State and No. CPCo 10-64--SOM ------ DO A 03.1090 confidfnttai. 103 COMMAND *=> INQUIRE FIXED EQUIPMENT 05/30/95 10:44 Equip ID Cost Center Serial # 'ssoc Ser # Parent ID PSV 2D-220 A* Eq Desc: SAFETY VALVE #802820 Unit: 0000063 criticality: 01 Area: STORGE Project: 49-409 M3 Equip Code: Type: Equip Cond: Spec: 2D-220 A Grid: Fleet MGMT?: Install Dt MFR Abbrev CROSBY Model #: Model Type JO-34A Model Size: 4" X L X 6" GEMTS-> Prod / Process: PRODUCT DISTRIBUTION 2D-220 SYST Eqp Group / Type : PRESSURE VESSEL/VALVE PRESSURE R * * * SPECIFICATION TEXT * * * INSPECTION SCHEDULE: 60 MONTHS VALVE SET PRESSURE: 500 PSXG OPERATING TEMP: -25 DEG. F OPERATING PRESSURE: 450 PSIG BACK PRESSURE: 0 PRODUCT: ETHYLENE VAPORS MTD Cost: Last PM: # Sel: 0 YTD Cost: Last Updated By: U432414 0 LTD Cost: Date Installed: Date: 10/30/89 00048 17 434 222 PF1 = VIEW SPEC PF2 -- PF3 = BROWSE PF4 = PF5 = PF6 = MENU PF7 * PREV RECORD PF8 = NEXT RECORD PF9 = PF10 PF11 = PF12 s MAIN MENU 00 A 031?91 CONFIDENT! Al. 103 COMMAND ==> INQUIRE FIXED EQUIPMENT 05/30/95 10:44 Equip ID PSV Pn-220 AB Eq Desc: SAFETY VALVE #807951 Unit: Cost Center OOOt.-3 Criticality: 01 Area: 8TORGE Project: Serial # 2824-X Equip Code: _______________ Type: ssoc Ser # Equip Cond: ______________________________ Parent ID 2D-220 A Grid: ______ Fleet MGMT?: Install Dt MFR Abbrev: ANDRSN Model #: Model Type: 33410L46-S Model Size: 4" X L X 6" GEMTS-> Prod / Process: PRODUCT DISTRIBUTION 2D-220 SYST Eqp Group / Type : PRESSURE VESSEL/VALVE PRESSURE R * * * SPECIFICATION TEXT * * * INSPECTION SCHEDULE: 60 MONTHS VALVE SET PRESSURE: 500 P8IG OPERATING TEMP: -25 DEG. F OPERATING PRESSURE: 450 PSIG BACK PRESSURE: 0 PRODUCT: ETHYLENE VAPORS MTD Cost: 0 YTD Cost: 0 LTD Cost: Last PM: __________ Date Installed: # Sel: 0 Last Updated By: NPL0467 GN-10 < RESET COMPLETE > Date: 06/06/94 00048 . . 17 434 245 PF1 = VIEW SPEC PF2 = PF3 = BROWSE PF4 = PF5 = PF6 = MENU PF7 = PREV RECORD PF8 = NEXT RECORD PF9 = PF10 = PF11 = PF12 s MAIN MENU DO A 031 CONFTDFNTIAL 103 COMMAND ==> INQUIRE FIXED EQUIPMENT 05/30/95 10:44 Equip TD PSV 2D-220 BA Eg Desc: SAFETY VALVE #807941 Unit: Cost Cen'. i Serial # ssoc Ser # Parent ID 0000063 2825-K 2D-220 B criticality: 01 Area: Equip Code: Equip Cond: Grid: ST0R6E Project Type: ___ Spec: Fleet MGMT?: xnstall Dt MFR Abbrev ANDRSN Model Type 33410L46-S GEMTS-> Prod / Process: Eqp Group / Type : Model #: Model Size: 4" X L X 6" PRODUCT DISTRIBUTION 2D-220 SYST PRESSURE VESSEL/VALVE PRESSURE R * * * SPECIFICATION TEXT * * * INSPECTION SCHEDULE: 60 MONTHS OPERATING TEMP: -25 DEG. F VALVE SET PRESSURE: 500 PSIG OPERATING PRESSURE: 450 PSIG BACK PRESSURE: 0 PRODUCT: ETHYLENE VAPORS MTD Cost: Last PM: # Sel: 0 YTD Cost: ____ _ 0 Last Updated By: NPL0467 0 LTD Cost: Date Installed: ______ Date: 06/06/94 GN- 10 < RESET COMPLETE > 00048 434 PF1 = VIEW SPEC PF2 PF3 = BROWSE PF4 = PF5 = PF6 = MENU PF7 = PREV RECORD PF8 = NEXT RECORD PF9 PF10 = PF11 = PF12 = MAIN MENU ( DO a 031 ;?93 CONFXopTNTrAI 103 COMMAND ==> INQUIRE FIXED EQUIPMENT 05/30/95 10:44 Equip ID: PSV 2D-220 BB Eq Desc: SAFETY VALVE #802823 Unit: _st Center: 0000063 Criticality: 01 Ar a: STOR6B .17530 ject: Serial #: 49409 M3 Equip Code: Type: ssoc Ser #: Equip Cond: Spec: ?arent ID: 2D-220 B Grid: Fleet MGMT?: install Dt: MFR Abbrev: CROSBY Model Type: JO-34A GEMTS-> Prod / Process: Eqp Group / Type : *** Model #: Model Size: 4" X L X 6" PRODUCT DISTRIBUTION 2D-220 SYST PRESSURE VESSEL/VALVE PRESSURE R SPECIFICATION TEXT * * * INSPECTION SCHEDULE: 60 MONTHS OPERATING TEMP: -25 DEG. F BACK PRESSURE: 0 VALVE SET PRESSURE: 500 P8IG OPERATING PRESSURE: 450 PSIG PRODUCT: ETHYLENE VAPORS MTD Cost: Last PM: # Sel: 0 0 YTD Cost: Last Updated By: U432414 0 LTD Cost: Date Installed: Date: 10/30/89 GN-10 < RESET COMPLETE > 00048 17 434 1029 PF1 = VIEW SPEC PF2 = PF3 ~ BROWSE PF4 = PF5 = PF6 = MENU PF7 = PREV RECORD PF8 = NEXT RECORD PF9 = PF10 = PFll = PF12 * MAIN MENU Do D-Otypr 7n'^9 103 COMMAND ==> INQUIRE FIXED EQUIPMENT 05/30/95 10:44 Equip ID Cost Center Serial # 'ssoc Ser # Parent ID PSV 2D-220 CA Eq Desc: SAFETY VALVE #807942 Unit: 0000063 Criticality: 01 Area* GE Project: 2826-K Equip Code: _ Type: ____________ Equip Cond: ____ _________ Spec: 2D-2-0 C Grid: Fleet MGMT?: install Dt MFR Abbrev ANDRSN Model Type 33410L46-S GEMTS-> Prod / Process: Model #; Model Size: 4" X L X 6" PRODUCT DISTRIBUTION 2D-220 SYST Eqp Group / Type : PRESSURE VESSEL/VALVE PRESSURE R * * * SPECIFICATION TEXT * * * INSPECTION SCHEDULE: 60 MONTHS OPERATING TEMP: -25 DEG. F VALVE SET PRESSURE: 500 PSIG OPERATING PRESSURE: 450 PSIG BACK PRESSURE: 0 PRODUCT: ETHYLENE VAPORS MTD Cost: 0 YTD Cost: Last PM: ________ # Sel: 0 Last Updated By: NPL0467 0 LTD Cost: Date Installed: Date: 06/06/94 GN-10 < RESET COMPLETE > 00048 17 434 259 PF1 = VIEW SPEC PF2 = PF3 = BROWSE PF4 = PF5 = PF6 = MENU PF7 = PREV RECORD PF8 = NEXT RECORD PF9 * PF10 = PF11 = PF12 = ( c^rl;3^9 103 COMMAND ==> INQUIRE FIXED EQUIPMENT 05/30/95 10:44 Equip ID: Cost Center: Serial #: 'ssoc Ser #: 'arent ID: PSV 2D-220 0000063 33608 M4 2D-220 C CB Eq Desc: SAFETY VALVE #803291 Unit: Criticality: 01 'Area: STOROE Project: Equip Code: Typ : Equip Cond: Spec: Grid: Fleet MGMT?: 00048 17 434 ____ _nstall Dt: MFR Abbrev: CROSBY Model #: Model Type: JO-33 A Model Size: 4" X L X 6" GEMTS-> Prod / Process: PRODUCT DISTRIBUTION 2D-220 8YST Eqp Group / Type : PRESSURE VESSEL/VALVE PRESSURE R * * * SPECIFICATION TEXT * * * INSPECTION SCHEDULE: 60 MONTHS VALVE SET PRESSURE: 500 PSIG OPERATING TEMP: -25 DEG. F OPERATING PRESSURE: 450 PSIG BACK PRESSURE: MTD Cost: 0 0 YTD Cost: PRODUCT: ETHYLENE VAPORS 0 LTD Cost: 152 Last PM: Date Installed: # Sel: 0 Last Updated By: U432414 GN-10 < RESET COMPLETE > Date: 10/30/89 PF1 = VIEW SPEC PF2 = PF3 = BROWSE PF4 = PF5 = PF6 = MENU PF7 = PREV RECORD PF8 = NEXT RECORD PF9 PF10 - PF11 = PF12 = ( 00 A 031 296 CONFTDFNTT AL 103 COMMAND ==> INQUIRE FIXED EQUIPMENT 05/30/95 10:44 Equip ID Cost Center Serial # ssoc Ser # Parent ID PSV 2D-220 DA Eq Desc: SAFETY VALVE #807946 Unit 0000063 Criticality;* 01 , Area: STORGE Project 2827-K Equip Code: _ Type Equip Cond: __________________________S_p__e_c 2D-220 D Grid: Fleet MGMT? .nstall Dt MFR Abbrev ANDRSN Model Type 33410L46-S GEMTS-> Prod / Process: Eqp Group / Type : k It * Model #: Model Size: 4" X L X 6" PRODUCT DISTRIBUTION 2D-220 SYST PRESSURE VESSEL/VALVE PRESSURE R SPECIFICATION TEXT * * * INSPECTION SCHEDULE: 60 MONTHS OPERATING TEMP: -25 DEG. F VALVE SET PRESSURE: 500 PSIG OPERATING PRESSURE: 450 PSIG BACK PRESSURE: MTD Cost: 0 0 YTD Cost: PRODUCT: ETHYLENE VAPORS 0 LTD Cost: Last PM: Date Installed: # Sel: 0 Last Updated By: NPL0467 Date: 06/06/94 GN-10 < RESET COMPLETE > 00048 17 434 _____ 245 PF1 = VIEW SPEC PF2 = PF3 = BROWSE PF4 = PF5 = PF6 = MENU PF7 = PREV RECORD PF8 s NEXT RECORD PF9 = PF10 = PF11 = PF12 = MAIN MENU ( DO C0NF A 03 x tbp'hiT 7 lAl 103 COMMAND ==> INQUIRE FIXED EQUIPMENT 05/30/95 10:45 Equip ID Cost Center Serial # 'ssoc Ser # Parent ID PSV 2D-220 DB 0000063 33608 M4 2D-220 D Eq Desc: SAFETY VALVE #803294 Unit: .-icality: 01 Area: STORGE Project: Equip Code: Type: Equip cond: Spec: Grid: Fleet MGMT?: -nstall Dt MFR Abbrev CROSBY Model Type JO-33 A GEMTS-> Prod / Process: Eqp Group / Type : Model #: Model Size: 4" X L X 6" PRODUCT DISTRIBUTION 2D-220 SYST PRESSURE VESSEL/VALVE PRESSURE R * * * SPECIFICATION TEXT * * * INSPECTION SCHEDULE: 60 MONTHS VALVE SET PRESSURE: 500 PSIG OPERATING TEMP: -25 DEG. F OPERATING PRESSURE: 450 PSIG BACK PRESSURE: 0 PRODUCT: ETHYLENE VAPORS MTD Cost: 0 YTD Cost: 0 LTD Cost: Last PM: Date Installed: # Sel: 0 Last Updated By: U432414 Date: 10/30/89 GN-10 < RESET COMPLETE > 0Q048 434 4252 PF1 = VIEW SPEC PF2 = PF3 = BROWSE PF4 = PF5 = PF6 = MENU PF7 = PREV RECORD PF8 = NEXT RECORD PF9 = PF10 - PF11 PF12 = MAIN MENU DO a CO/VFj^ 103 COMMAND ==> INQUIRE FIXED EQUIPMENT 05/30/95 10:45 Equip ID: PSV 2D-30 AA Cost Center: 0000063 Serial #: 34855 M4 'ssoc Ser #: Parent ID: 2D-30 A Eq Desc: 8AFETY VALVE #803169 Unit: Criticality: 01 Ar a: ST0R6E ct: Equip Code: Type: Equip Cond: ____ _________ Spec: Grid: _____ Fleet MGMT?: .nstall Dt: MFR Abbrev: CROSBY Model Type: JO-35-A GEMTS-> Prod / Process: Model #: Model Size: 4" X M X 6" PRODUCT DISTRIBUTION 2D-30 A/B Eqp Group / Type : PRESSURE VESSEL/VALVE PRESSURE R * * * SPECIFICATION TEXT * * * INSPECTION SCHEDULE: 60 MONTHS VALVE SET PRESSURE: 300 PSIG OPERATING TEMP: 80 DEG. F OPERATING PRESSURE: 200 PSIG BACX PRESSURE: 0 PRODUCT: PROPYLENE VAPORS MTD Cost: 0 YTD Cost: 0 LTD Cost: Last PM: Date Installed: # Sel: 1 Last Updated By: U432414 Date: 10/30/89 00048 17 434 PF1 = VIEW SPEC PF2 PF3 = BROWSE PF4 = PF5 = PF6 = MENU PF7 a PREV RECORD PF8 a NEXT RECORD PF9 = PF10 = PF11 PF12 a MAIN D A 03lp C0Nr^frNTlAL 103 COMMAND ==> INQUIRE FIXED EQUIPMENT 05/30/95 10:45 Equip ID: PSV 2D-30 BA Eq Desc: SAFETY VALVE #803170 Unit: 00048 Cost Cente1-: 0000063 Criticality: 01 Area: ST IE Project: 17 Serial #: 34855 M4 Equip Code: ____________ Type: 434 ssoc Ser #: ________ Equip Cond: ____ _____ Spec: Parent ID: 2D-30 B Grid: Fleet MGMT?: ( install Dt: MFR Abbrev: CROSBY Model #: Model Type: JO-35-A Model Size: 4" X M X 6" GEMTS-> Prod / Process: PRODUCT DISTRIBUTION 2D-30 A/B Eqp Group / Type : PRESSURE VESSEL/VALVE PRESSURE R * * * SPECIFICATION TEXT * * * INSPECTION SCHEDULE: 60 MONTHS VALVE SET PRESSURE: 300 PSIG OPERATING TEMP: 80 DEG. F OPERATING PRESSURE: 200 PSIG BACK PRESSURE: 0 PRODUCT: PROPYLENE VAPORS MTD Cost: 0 YTD Cost: 0 LTD Cost: 517 Last PM: Date installed: ___ # Sel: 0 Last Updated By: U432414 GN-10 < RESET COMPLETE > Date: 10/30/89 PF1 = VIEW SPEC PF2 = PF3 = BROWSE PF4 = PF5 = PF6 = MENU PF7 = PREV RECORD PF8 = NEXT RECORD PF9 = PF10 - PF11 = PF12 = MAIN MENU ( on oonf* lDtHTTAI 103 COMMAND INQUIRE FIXED EQUIPMENT 05/30/95 10:45 Equip ID: PSV 2D-30 AB Eq Desc: SAFETY VALVE #803168 Unit: Cost Center: 0000063 Criticality: 01 -Area: STORGE Project: Serial #: 34855 M4 Equip Code..;______________ Type: \ssoc Ser #: Equip Cond: ______________________________ Parent ID: 2D-30 A Grid: Fleet MGMT?: Install Dt: __ MFR Abbrev: CROSBY Model #: Model Type: JO-35-A Model Size: 4" X M X 6" GEMTS-> Prod / Process: PRODUCT DISTRIBUTION 2D-30 A/B Eqp Group / Type : PRESSURE VESSEL/VALVE PRESSURE R * * * SPECIFICATION TEXT * * * INSPECTION SCHEDULE: 60 MONTHS VALVE SET PRESSURE: 300 PSIG OPERATING TEMP: 80 DEG. F OPERATING PRESSURE: 200 PSIG BACK PRESSURE: 0 PRODUCT! PROPYLENE VAPORS MTD Cost: 0 YTD Cost: 0 LTD Cost: Last PM: Date Installed: # Sel: 0 Last Updated By: U432414 Date: 10/30/89 GN-10 < RESET COMPLETE > 00048 17 434 124 PF1 = VIEW SPEC PF2 = PF3 = BROWSE PF4 PF5 = PF6 = MENU PF7 a PREV RECORD PF8 s NEXT RECORD PF9 =* PF10 * PF11 PF12 = MAIN MENU INQUIRE FIXED EQUIPMENT 05/30/95 10:' Equip ID: PSV 2D-30 BS Eq Desc: SAFETY VALVE #803171 Unit: Cost Center: 0000063 Criticali^v: 01 Area: STORGE Project: Serial #: 34855 M4 *uip Code: Type: 'ssoc Ser #: ________ Equip Cond: ____ _____ Spec: Parent ID: 2D-30 B Grid: Fleet MGMT?: Install Dt: MFR Abbrev: CROSBY Model #: Model Type: JO-35-A Model Size: 4" X M X 6" GEMTS-> Prod / Process: PRODUCT DISTRIBUTION 2D-30 A/B Eqp Group / Type : PRESSURE VESSEL/VALVE PRESSURE R * * * SPECIFICATION TEXT * * * INSPECTION SCHEDULE: 60 MONTHS VALVE SET PRESSURE: 300 PSIG OPERATING TEMP: 80 DEG. F OPERATING PRESSURE: 200 PSIG BACK PRESSURE: 0 PRODUCT: PROPYLENE VAPORS MTD Cost: 0 YTD Cost: 0 LTD Cost: Last PM: Date Installed: _________ # Sel: 0 Last Updated By: U432414 Date: 10/30/89 GN-10 < RESET COMPLETE > 00041 17 434 450 PF1 = VIEW SPEC PF2 * PF3 = BROWSE PF4 = PF5 = PF6 = MENU PF7 = PREV RECORD PF8 = NEXT RECORD PF9 s PF10 = PF11 = PF12 = MAIN MENU DO A 031302 CONFIDENTIAL FIRE & EXPLOSION INDEX AltEA/COUNTRY LOCATION DATE USA SITE Louisiana MANUFACTURING UNIT Ptaquemlne PROCESS UNIT June 19,1995 Louisiana PREPARED BY: Light Hydrocarbon II DeMethanizer (2C-S1) APPROVED BY: (BuyrlfWndnt) BUILDING Holly Reed REVIEWED BY; ? REVIEWED SY: (TMhnotoffy C*mw) 64901 REVIEWED BY: (Safety A Loa* PmmWcti) ? MATERIALS IN PROCESS UNIT ? ? Hydrogen, Methane,Ethy1enetEthane,PrDpane,Propytene STATE OF OPERATION SASIC MATERIAL^) FOR MATERIAL FACTOR tTAATUF _X_POMMt OPERATION XUTDOWW Ethylene MATERIAL FACTOR (See Table 1 or Appendices A or B) Note requirements when unit temperatures over 140 l 24 1. General Process Hazards Penalty Fac Penalty Fac tor Range tor Used (1) Base Factor............................................................................................... 1.00 A. Exothermic Chemical Reactions 0.30 to 1.25 B. Endothermic Processes 0.20 to 0.40 C. Material Handling and Transfer 0.25 to 1.05 D. Enclosed or Indoor Process Units 0.25 to 0.90 E. Access 0.20 to 0.35 F. Drainage and Spill Control 75.690 oaltons 0.25 to 0.50 1.00 0.00 0.00 0.00 0.00 0.00 0.50 General Process Hazards Fictnr (FI).......................................................................... 1.50 2. Special Process Hazards Base Factor............................................................................................... 1.00 1.00 A Toxic Materials) 0.20 to 0.80 0.20 B. Sub-Atmospheric Pressure (< 500 mm Hg) C. Operation In or Near Flammable Range ___ INERTED _X_ NOT INERTED 0.50 0.00 1. Tank Farms Storage Flammable Liquids 2. Process Upset or Purge Failure 3. Always in Flammable Range D. Dust Explosion (See Table 3) E. Pressure (See Haure 21 0.50 0.30 0 80 0.25 to 2.00 Ooeratina Pressure 380 osic Relief Setting 575 Dsifl 0.00 0.00 0.00 0.00 0.60 F. Low Temperature G. Quantity of Flannmeble/Unstabie Material 0.20 to 0.30 Quantity 21.846 lb He 20.800 BTU/lb 0.30 1. Liquids or Gases in Process (See Figure 3) 2. Liquids or Gases in Storage (See Figure 4) 3. Combustible Solids in Storage, Dust in Process (See Figure 5) H. Corrosion and Erosion 0.10 to 0.75 0.94 0.00 0.00 0.10 1. Leakage Joints and Packing 0.10 to 1.50 0.10 J. Use of Fired Equipment (See Figure 6) 0.00 K. Hot Oil Heat Exchange System (See Table 5) 0.15 to 1.15 0.00 L. Rotating Equipment 0.50 0.00 Special Process Hazards Factor (F2)..--.....................--............................. 3.24 Process Unit Hazards Factor (FI x F2) " F3............................................................ Fite and Explosion Index (F3 x MF F&EI)................................................................. 4.86 117 (1) For no penalty um 0.00. D0 A 031303 C0NF1DPNTTAI- FORU C-22340 Rw/01-M (471-000W) - |FIE-7 System Vsr-2. 1 - 8131/#4| Print Data: 7/10/95 LOSS CONTROL CREDIT FACTORS 1. Process Control Credit Factor (Cl) Faatura *. Emergency Power b. Cooling c. Explosion Control d. Emergency Shutdown Computer Control Credit Factor Range 0.98 0.97 to 0.99 0.84 to 0.88 0.96 to 0.99 0.93 to 0.99 Credit Factor Used (2) 0.98 1.00 1.00 1.00 1.00 Feeture r. Inert Ges 9- Operating Instructions/Procedures h. Reactive Chemical Review i. Other Process Hazard Analysis Cradit Factor Range 0.94 to 0.96 0.91 to 0.99 0.91 to 0.98 0.91 to 0.98 Credit Factor Used (2) 1.00 1.00 0.91 0.98 Cl Value (3) | 0.874 | 2. Material Isolation Credit Factor (C2) Feature e. Remote Control Valves b. Dump/Blowdown Credit Factor Range 0.96 to 0.98 0.96 to 0.98 Credit Factor Used (2) 1.00 1.00 Feature c. Drainage d. Interlock C2 Value (3) | 1.000 | Credit Factor Range 0.91 to 0.97 0.98 Credit Factor Used (2) 1.00 1.00 3 Fire Protection Credit Factor (C3) Feature a. Leak Detection b. Structural Steel c. Fire Water Supply d. Special Systems a. Sprinkler Systems Credit Factor Range 0 94 to 0.98 0 95 to 0.98 0.94 to 0.97 0.91 0.74 to 0.97 Credit Factor Used (2) 0.98 1.00 0.94 1.00 0.97 Feature f. VNbter Curtains 9 Foam h. Hand Extinguishers/Monitore i. Cable Protection C3 Value (3) | 0.867 j Loss Control Credit Factor Cl x C2 x C3 (3) | 0.7W"1 Credit Factor Range 0.97 to 0.98 0.92 to 0.97 0.93 to 0.98 0.94 to 0 98 Credit Factor Used (2) 1.00 1.00 0.97 1.00 PROCESS UNIT RISK ANALYSIS SUMMARY 1. Fire and Explosion Index (F&Ef)........... (See Front) 117 2. Radius of Exposure..................................... <n*7] 98 ft 3. Area of Exposure................................................................... 30135 sq.ft. 4. Value of Area of Exposure (1994 Doltara)............................................................................... $MM 5. Damage Factor.......................................................... 0.80 6. Base Maximum Probable Property Damage - (Base MPPD) [4x5].................... 7. Loss Control Credit Factor ......................... (See Above)] 0.76 $MM 8. Actual Maximum Probable Property Damage - (Actual MPPD) [6x7].... ................ JMM 9. Maximum Probable Days Outage - (MPDO) 112 days 10 Business Interruption - (Bh .......... ........ ...................... ..........* ...... ............................. JMM 27.55 21.94 16.62 78.23 | | | | (2) For no credit factor enter 1.00 (3) Product of all factors used Refsr to 'Fir* & Explosion Indox Hazard Classification Guide" (Form #471-00001) for details BACK OF FORM C-22330 (471-OOBM) - (FIE-7 SyMwn V-21 S/3VMJ Print Date: 7/1 (V95 0 A 031304 CONFTDFNTTAL FIRE & EXPLOSION INDEX - DATA AND COMMENTS Material Factor Malarial la From Datataaa Malarial Nama - Briyrana Baaa Malarial Facer* 24 A^uatad Malarial Factor * 24 Had dComriudlon(BTU/Ii)-30000 M)> 1 Nf 4 Nr>2 Fiaari PoW (-F) Gaa BsaaigPcmrF)B-19S Precaaa UM Tamparatuia fF) * 39 Brntriarm Tamparatua <*F) * 1000000 Aiaolgniltm Tampantura (*F) * 943 Date For Poor Snocjfiad Matortel Ctenaral Procaaa Hazard! A. Exedtatmrc Cnarmcil Paactora Procaaa Ur* MOT A REACTOft anator NO EXOTHERM oceua (Panaty-O) Comma 0 B. Btdotlrannic Proriaaaa Procaaa Un* HOT A REACTOR --* Panaty-0 Comma 0 C. Malarial Homing and Tranaiar Nona d ora waordtgaOuaoonaappty (Panaty-O) Comma 0 D Endcaari or Indoor Procaaa Unto Procaaa a NOT ENdOSED (Pana*y-0) Comma 0 E. Accaaa Aceaaa daetmlrad adaquata (or amargancy aquMmate (PanalyHl) Comma 0 F Dratraga and spN Codtd FM, imdftad araa wWch aaowa apda to ipraad out (Panety-0 SO) Comma 0 todllProtwHlMm K Tone MaiariaM) EquafetrttanttradtnaNn 0 SubJUmoadraric Praaaiaa (a 900 mm HgJ Ctaalar man MO tnmHg (PanatyrrO) Comma 0 C. Oparaton In or Naar Flammarila Ranga Procaaa wB not raaclt Ota flammada ranga (Panaty*0). Comma 0 0. DoatExptoaajn Procaaa doaa not Orckjda data (Pana*y*0) Comma 0 E. Proaauta Comma 0 F. LowTamparatiao Procaaa uteiaa carrion ateal riatoa te ttanaMon tamparatua Comma 0 0. Quarrty d Fnmnranwuracada Matarial In Procaaa Comma 0 H. Conoalon and Emaion Corrodon ralaa riakrw 0.9 mmiyr VMTN (tear d pWng andlor Comma 0 1. Laakago - JoHa and Packing Minor Malaga terry d pump and gland aaa (Fanafy-O. to) Comma 0 J. uaodFMdEqufcmod DOES NOT atat Or ttra plant n Ora Procaaa Ut* Comma 0 K. Hot04HaatExeriangaSyatam Procaaa doaa nd uaa a rid dl ancrianga aydam, or ttra rid 04 Comma 0 L RoMng Eqdpmarrt No rdattig aqulpnwt daamad e ba a riazard (No Pardty) Comma 0 re-r anua wn-nai 'iOC> PrirtOata T/KV99 LOSS CONTROL CREDIT FACTORS - DATA AND COMMENTS Process Control Credit Factor IC1) a) Emergency Power Autorrwtic twitch to emergency power tor CRITICAL SERVICES Comma 0 b) Cooling No credit (Factor-1.0) Comma 0 c) Explosion Control No credit (F*etor1.0) Comma 0 d) Emergency Shutdown No credit (Faetor-i.Q) Comma 0 e) Computer Control No credit (Faetor*1.0) Comma 0 f) Inert Gas No credit (Factor-1.0) Comme 0 g) Operating IntbucUom/Proceduiea Cornea 0 n) Reactive Chemical Review Reactive Chemcal program a a continuing pert of operation* Comm* 0 I) Other Process Hoard Analysis Management of Change Review (Factor-0.96) Comm* 0 Material Isolation Credit Factor IC2I a) Remote Control Valves No credit (Factor-1 .0) Comme 0 b) Dump/Blowdown No credit (Factor-1.0) Comme 0 c) Drainage No credit (Faetoml.O) Comme 0 d) interlock No credit (Factor-1.0) Comme 0 Fire Protection Credit Factor (C3I a) Leak Detection Gat detectors alarm and Identity a zone only (Factor=0 96) Comma 0 b) Structural Steel No credit (Factor-1.0) Comma 0 c) Fire Water Supply Firefighting water can be supplied tor 4 hour* at 100 peig (7 Corrme 0 d) Special Systems No credit (Factor-1.0) Comme 0 a) Sprinkler System* Deluge system protects process (Fsctor-0.97) Comme 0 f) water Curtains No credit (Factor-1.0) Comme 0 g) Foam No credit (Factor-1.0) Comma 0 h) Hand Extmgurshars/Monttor* The procast a protected by monitor gun* (FacMr-0 97) Comme 0 i) Cable Protection No credit (Factor-1.0) Comma 0 pit-J Sy-w- v4.i mm) DO A 031006 CONFIDENTIAL Print Date: 7/10/95