Document Bya9ggw8xw1ooo9n85qLKgDj8

1982 SHAC ACTIVITIES PMSB Report May 19, 1982 STATUS Armored for Safety Program --Plant News article issued - May 26. --Cafeteria display of protective equipment - May 27. --Burma Shave signs at Main Gate. --Key chains handed out at Main Gate, West Gate, and Gate 3 - June 2. --Request for June safety meetings on protective equipment issued May 27. --Hourly check messages continue. --Posters to go on display late June and early July. Hourly Safety Committee --April meeting attendance was nine of nine or 100%. --Tom Ryan reviewed the 1982 injury record and status of the Breathing Air Project. --Plantwide safety concerns included: --Inexperienced and too few pipefitters on shift. --Poor housekeeping on shutdowns or construction can increase potential for injury. --HSC suggested promotion of safety by encouraging physical fitness to be developed further. --HSC comments on S/H competition program. --HSC participated in handout of key chains of 6/2. Second Quarter S/H Inspections --Inspections to be held weeks of 6/14, 6/21, and 6/28. --Reply reports not to SHAC by 7/19 will be reported by exception to PMSB. --NO inspection of HOPE. --SHAC will use Queeny Plant checklists for a mock test of "Competition S/H Program." Competition S/H Inspection Program --Contacted Chocolate Bayou, Krummrick, Queeny, and Avon plants. --SHAC has developed program outline and basic elements. --SHAC will conduct a mock test of the Queeny Plant checklists and the SHAC developed competition program. --PDA completed on program outline. --Now plan PM/SAC, and PMSB review in July. Implement third quarter. SC 002051 LAM003256 1982 SHAC Activities PMSB Report May 19, 1982 Page -2- Hose Procedure P-Bulletin This P-bulletin will issue for review this month. The task force has signifi cantly simplified and reduced size. Other improvements include 1) utility, marine, and chemical groups instead of I through IV, 2) breathing air hoses added, 3) colored tape to also show date, and 4) revised appendix. Portable Building Survey In the May PMSB meeting a request was made of PMSB members to summarize action plans in memo form to G. L. Tromblee (cc to D. D. Kos) by June 9. No action plans have been received to date. SHAC will issue a summary for the July PMSB meeting (need action plans by July 14). SC 002052 LAM003257