Messrs: T. M. McCracken, J. A. Williams, F. C. Priest Progress Report - Job 7727 - W/E 11-30-74
PLAINTIFFS EXHIBIT
December 2, 1974
Barnard & Burk personnel on sice - 31 Betz personnel on site - 7 Leavesley-McCollum personnel on site - 18
Ho time lost due to labor or weather problems One day lost because of Thanksgiving Holiday
Facility 24 Continue installation of walkway and miscellaneous steel, painting,
piping and electrical work. Installing final steel and siding between combustion chamber and stack. New 3200# counterweight Installed for combustion chamber damper door.
Leavesley completed kiln refractory and two of three kiln castable pours. Also completed castable raming in firing hood. Continuing installation of refractory in bottom section of stack.
Best Engineering 90Z complete on remaining two stack sections.
Facility 24-A Siding installation completed
Facility 35 Continue cooler drive installation. Pinion set and grouted. Cooler
discharge equipment installation completed. Thirty inch transite vent dust installation completed.
Facility 40 - Complete
Facility 65 - Complete
Facility 66 - Completing punch list items. Turnover is still being held up by outstanding items on fire pump.
JFF/gw
Attachment
RMC3300020000005
INTRACOMPANY CORRESPONDENCE
R 78
' '5.
FROM
TO
J. F. Farrell - Baton Rouge Mr. P. L. Patty - Baton Rouge
COPY'
DATE 5
SUBJECT
Messrs: T. M. McCracken, J. A. Williams, F. C. Priest Progress Report - Job 7727 - W/E 1-4-75
Betz Electric personnel on site -2 Leavesley McCollum personnel on site - 7
Nichols Construction completed stack erection on 12-31-74 except for a few punch list items to be completed by Best Manufacturing Company.
Leavesley completed rigging of refractory platform in stack and began refractory s installation on 1-2-75. Leavesley is having problems with brick hoist which is slowing progress. Refractory completion date 16 now scheduled for 1-17-75.
Instrumentation check out continuing.
JFF/gw
January 6, 1975
RMC3300020000006
n.TC 11-15-74
JOE WO . J0B NAME
-----PAvnolds
BARNARD & BURK, INC.
CONSTRUCTION DIVISION f. o. BOX IIII9 BATON ROUGE. LOUISIANA
DAILY CONSTRUCTION REPORT
Metals Co.---------------------- LOCATION ------- Baker,
Louisiana
ftAM-Y CTTCK SHALL U WRITTEN BY THE TINEKEMI AND SIGNED BY BOTH THE SUPERINTENDENT ANO TIMEKEEPER. ANO EACH WIU. ^ ACCURACY OP THIS LETTER AND FOR OMISSION OP ANY PACT. WHICH THE MAIN OPPICC SHOULD KNOW. WE
ESPOHSISLE FOR ACCURACY OF THIV b>
SOLICIT SUGICGEESSTTItOmNf*t FOR INCREASING EFFICIENCY AND STEED.
C^.
Sighed.
1
7
TTiniMxi ximi
SlONCO_
uNWNTumrr
WORKMEN
FOREMEN
PIPEFITTERS IRON WORKERS BOILER MAKERS MILLWRIGHTS CARPENTERS
1 2
1 1 1
OPERATORS LABORERS CEMENT FINISHERS TRUCK DRIVERS WAREHOUSE
Painter
OFFICE STAFF FIELD STAFF CONSTRUCTION DIV. TOTAL V -COMTKACTOM
1 1
1 1 1 1 12
Betz Electric
1
MEN
5 4 3 3 2
1 1 1 1 1 1 2 1 26
7
TOTAL
EQUIPMENT
6 6
4 ..... 4 3
2 2 1 1 2 2
CRANES
CHERRY PICKERS
PICK-UP TRUCKS
OTHER TRUCKS
WGAESLO&INGELEMCATC.HINES
PIPE THREADING MACHINES AIR COMPRESSOR
TEST PUMP
BACKHOE JACKHAMMERS ft TAMPERS SMALL TOOLS I.E. IMPACT.. DRILL* EKIL-GAW.
3 OFFICE TRAILER
2 CHANGE SHACKS 38 CUTTING RIGS
OTNUi
8 Sanitary Units Tool boxes
OUT1IOE OWNED RENTAL
PROJECTED END DATE
11
2 1 2 3-
12-31-74 12-15-74
*
1 12-15-74
1 12-31-74 Uz\izH
*2
,
2 12-15-74
Grand Total
MATERIAL NEEDED
13 33 46
DRAWINGS OR INFORMATION NEEDED
WORK ITEMS ACCOMPLISHED THIS DAY WEATHER: Fair;___________________________________________________________________________________
______ Welding Wearing Strips on Cooler. Working on 30" Transits Duct-.. Erecting, platforms,on Combustion Chamber. Grouting stack. Electrician* pulling wire. Fabricating and erecting pipe. Painting structural steel.
______ General clean-up. Reclevlng materials.__________________________
ACTIVITY DURING NEXT 7 DAYS: (INCLUDING SUB-CONTRACTORS)
---------- Complete 30" Transite Duct. Will continue setting Penion Gear & Drive for Cooler. Finnish welding Wearing Strips on Cooler. Erect platform,
----------handrails, and, grating, north aid west aide Of Combustion Chamber._________ Grouting Stack Foundation. Trimming and flashing Comtrol House. Install
---------- s_ea_ls on.Cooler. Continue painting structural steel. Fabricate and erect ______ pipe* Electricians pulling wire, setting motors, running conduit.
General clean-up. Recieving materials.
________________ _
CHANGE O'ROER ALERT (DESCRIBE BRIEFLY)
CISTF^UTICN:
NOR. OF CCS'ST. --
--r PLA-
CHKO.
ENGlNtfcHING
-- -
CC- INTROL
PURCHASING - -- -- - E5U. MGR,
SiCMtB---
._ _
_______________
OwMlft ( tVwlN APPLC*IC T
RMC3300020000007
CONSTRUCTION DIVISION
date.
11-22-74
JOI NO.
7404
F. O. BOX !!>> BATON MUfiC. LOU1BIAKA
DAILY CONSTRUCTION REPORT
JOB NAME
Reynolds K'tals Cr . LOCATION
Baker. Louisian?
QAILV LETTLB SMALL BC WBITTSN BY THE TIMCHEEFCB AND SIGNED BY BOTH THE BOPEHINTENDENt AND TIMEKEEMH. AND EACH WILL BE MELD SESPONSIBLE YOB ACCOBACY OB THIS LETTEB AND BOR OMISSION OB ANY TACTS WHICH THE MAIN OBTICC SHOULD KNOW. WE
SOLICIT SUGGESTIONS BOB INCREASING EBBICICMCY AMD STEED.
------ ^
--
TtMCMCCPt*
Signed-
gRtaiNTCNBiNT
workmen
FOREMEN
PIPEFITTERS IRON WORKERS BOILER makers MILLWRIGHTS CARPENTERS OPERATORS LABORERS CEMENT FINISHERS
JRUOC. JRUICRS S . M .
WAREHOUSE
OT"1*' Painter
OPPICE STAPP PIELD STAFF CONSTRUCTION DIV. TOTAL uKONiSAeion
i i i i i i i
i
i l 10
R't:? E' prT.rir
.1
MEN
5 6 O
3 1 1 1 1 1 1 1 1 1 26
7
Guano Total
11 33
TOTAL
coutPM cwr
6 CRANES
7 CHERRY PICKERS
4 PICK-UP TRUCKS
4 OTHER TRUCKS
2
t WELDING MACHINES
1 GAS fr ELECT.
1 PIPE THREADING 2 1 MACHINES
2 | AIR COMPRESSOR
1 TEST PUMP
1 BACKHOE
JACKHAMMERS fc 2 TAMPERS
1
SMALL TOOLS t.E. IMPACTS DRILLS. SKIL-SAW*
2 OPPICE TRAILER
2 CHANGE SHACKS
36
_ CUTTING RIGS 0YMca<
R Sanitary Units Tool boxes
44
CO. OWN CO
OUTSIDE RENTAL
PROJECTED tNO DATE
A1
2 -J.______
13
12-31-7-
.12.-1^4 ii~21-74
1
1 4R
_
I 1 1
l2?
_2
1
1
1
12-15-74 12-31-74
Wz\*zli
i 12-15-71
MATERIAL NEEDED
DRAWINGS OR INFORMATION NEEDED
WORK ITEMS ACCOMPLISHED THIS DAY WEATHER: Fair:_________________________________________________________________________________________
Fabricated steel beam and poured counterwieohts. Erectin 30" Transit*? duct. Erecting steel platforms & handrails. Triming out Control bldg,
roof, siding. Trimina out Combustion Chamber siding. Fabricating end erecting pipe. Pulling wire, running conduit. Painting structural steel. aligning Bull Gear to Cooler.__
ACTIVITY DURING NEXT 7 DAYS: (INCLUDING SUB-CONTRACTORS)__________________________
Starting Kiln motor and Drive. Installing guards 6 Seals on Kiln. Srect handrails & stair treads. General clear.-up. Relieving materials.
RMC3300020000008
9-20-74 Frl
JOJ
7U0U
wrv\
a
Vl\l\
I * ' w.
CONSTRUCTION DIVISION
P. O. (OX IBIlt BATON BOUOK. LOOIBIANA
DAILY CONSTRUCTION REPORT
JOB NAME
Reynolds Metala_Co
LOCATION Baker. Louisiana
DAILY LETTER (MAUL RE WRITTEN RY THE T1MCKEERCR AND SIGNED RT ROTH THE SUPERINTENDENT AND TIMEKEEPER. AND EACH WILL
RE HELD RESPONSIBLE POR ACCURACY OP THIS LETTER AND FOR OMISSION OP ANY PACTS WHICH THE MAIN OPPICC SHOULD KNOW. WE
SOLICIT SUUGOGGECSHT'IIOONNSS PPOORR IINNCCRREEAAES1INNGO |EPPPPIICCIIEINWCY ANO SPEED.
'
Signed--
timkksspcs
Signed.
SUPCftlwTCMOINT
WORKMEN
FOREMEN
MEN
TOTAL
PIPEFITTERS IRON WORKERS
13
3 lk
BOILER MAKERS
1
MILLWRIGHTS
19
CARPENTERS OPERATORS LABORERS CEMENT FINISHERS
1 1 1
i
<
1
imKtiSUS&X. PT
WAREHOUSE
1 1
2
0""' Hodman
1
OFFICE STAFF
13
FIELD STAFF
11
CONSTRUCTION DIV. TOTAL 13 _ _ li.7
UR CONTRACTOR*
k
17 1
10 6
.k
6
1 1 3 1 4
2
60
| EQUIPMENT
CO. OWNED
OUTSIDE I PROJECTED RENTAL^ 1 END DATE
CRANES
CHERRY PICKERS
PICK-UP TRUCKS
OTHER TRUCKS WELDINO MACHINES GAS ft ELECT. PIPE THREADING MACHINES AIR COMPRESSOR
TEST PUMP
JL______ 2
_1______ _6______
i
BACKHOC
JACKHAMMERS ft TAMPERS SMALL TOOLS I.E. IMPACTS. DRILLS. IKIUCAWI OFFICE TRAILER
CHANGE SHACKS
CUTTING RIGS
OTMCfll
_I______ _2______
5
.l
_9 _k______
ii
Betz Elect
1
5
6 Sanitary Unita
k
Tool Boxes
2
Grand Total
MATERIAL NEEDED
lli
52
DRAWINGS OR INFORMATION NEEDED
66
WORK ITEMS ACCOMPUSHED THIS DAY
W*T>1*;E&iXi--Excavating and forming translte duct piers, catwalk piers and furnace piers. Building forma and pouring concrete for furnace piers. Alao pouring concrete for drain trench. Welding kiln thrust tire rings. Installing and aligning gear flange on kiln. Aligning thrust tire. Aligning the lower kiln tire. Continue Installing sheeting on combustion chamber.,--Installing catWftlk-3.t8Bl.___Electrical contractor running conduit for kiln control house. Unloading materials and machinery.________________ ________
ACTIVITY DURING NEXT 7 DAYS: {INCLUDING SUBCONTRACTORS)
Continue.excavating and forming translte duct piers, catwalk piers and furnace Piar<Li--Building Xorms and pouring concrete for furnace piers. Continn ppurlng eonere.tg for drain tfflnchs--Continue welding kiln thrust tire rings. Continue Installing and aligning.gear flange on kiln. Continue aligning thrust tiro.--Continue aliening the lover kiln tire. Continue Installing sheeting on combustion sifflpiber,___ Continue Installing catwalk steel. Electrical l contractor still running conduit for kiln control house. Continue unloading materials and machinery._______________________________________________________ CHANGE ORDER ALERT (DESCRIBE BRIEFLY)______________
DISTRIBUTION:
MGR. OF CONST. - --
PUAN ft 8CKK0.
ENGINEERING ---
COST CONTROL
PURCHASING ________________ EQUIP. MOR.
Signed
Owner <Wmcn A^rucAabcT
RMC3300020000009
rwn: 8-30-7U,-----Exd
JOI NO---------- 7U0fe-----------
CONSTRUCTION DIVISION a, maxp. isu satqn novae, Louisiana
DAILY CONSTRUCTION REPORT
JOB NAME
Reynold a Metals Co, LOCATION--------------------------Baker, La.---------------------------------
SKAU. IC witmcH *r me hmexcepoi and mcned or doth the ureaiNTtNOEKr and timexeepoi. and each wiu. ILmracV or this letteh and son omission or ant r*cr which the main office should know, we
youar sucoesnoNS ra iNCH^fSiNO ErpiciENcr and shod.
S^ *----------' . / _
i ' Sui
WORKMEN
FOREMEN
MEN
PIPEFITTERS
1
IRON WORKERS
3
boiler makers
MILLWRIGHTS
1
CARPENTERS
1
OPERATORS LABORERS
1 .1
CEMENT FINISHERS
TRUCK DRIVERS
WAREHOUSE . OtMBRi
RnAiun OFFICE STAFF
FIELD STAFF CONSTRUCTION DIV. TOTAL WMOimueTW*
1
1 2 12
11l!
3 10! 6'< 11 1
2 1 3 _1_________ 52
TOTAL
EQUIPMENT
1 __ CRANES
17
CHERRY PICKERS
PICK-UP TRUCKS
k 11 7 12 1
3 1 k 3 6k
OTHER TRUCKS WELDING MACHINES GAS & ELECT. PIPE THREADING MACHINES AIR COMPRESSOR
TEST PUMP
BACKHOC
JACKHAMMERS ft TAMPERS SMALL TOOLS LE. IMPACTS. OIIILLB. SXI14AWI OFFICE TRAILER
CHANGE SHACKS
CUTTING RIGS OTHOb
OWNED
OUTSIDE RENTAL
_2______ _3______ _J_______ _5______
_1_______
_1_______
_5______ _1_______ L_9______ _i_______
i
PROJECTED end date
Betz Elect
1
5
6
Sanitary TTnita
- >1
Tool Boxes
2
Grand Total
MATERIAL NEEDS)
13 57 =29______
DRAWINGS OR INFORMATION NEEDS)
WORK ITEMS ACCOMPLISHED THIS DAY
WEATHER: Pair A.M.--Welding out kiln. Klin aligned.. Forming drain trench and footings for translte duct and catwalk nlera. Excavating for furnace ulors. Unloading materialsiand machinery. Electricians on lob site. Alining and welding tires on cooler.
I
ACTIVITY DURING NEXT 7 DAYS;. (INCLUDING SUBCONTRACTORS)_________________ ______________:
_________
Continue Installing and welding kiln sections. Continue aligning kiln
anA-SPtlgr-tires. , Start Installing ring gnaw n JflTn anri i.nn1 aw. f!nnHm'0 forming and pouring forma for 'footInga "and kiln Control housed '.nontlniie
unloading and, checking -mater!aTa.--CnntinM_mnn(iin. maFTUn.T-jr, ph
contractor to continue conduit rune.
______.
I2 1
i: 1 i;___ i___ ; > '
!
. . i.j
CHANGE ORDER ALERT (DESCRIBE C
I!
:
MGR. or CONST. ENGINEERING. PURCHASING
DISTRIBUTION: ! PUkN A SCHED. COST CONTROL.
- - EQUIP. MGR. _
Signed
Ownm (Whin Affucailc)
... RM C3300020000010
INTRACOMPANY CORRESPONDENCE
R.98 (R. 1-68)
FROM:
T 0:
J. F. Farrell - Baton Rogge . Mr. P. L. Patty - Baton Rouge
COPY:
DATE &
SUBJECT:
Messrs: T. M. McCracken, J. A. Williams, F. C. Priest Progress Report - Job 7727 - W/E 6-29-74
June 29, 1974
Mo time lost due to weather or labor problems.
Facility Y.O - no progress
Facility 24.0 Continue forming pier "A" walls and erection
of combustion chamber. Poured 30" translte duct footing at pier "B".
Facility 35.0
Setting of cooler trunlons and installing riding rings on cooler. Continue excavation for conveyor trench extension.
Facility 31.0 - Hold
Facility 40.0 - Complete
Facility 65.0 - Complete
Facility 66.0 Poured fire pump and fire pumphouse foundation.
JFF/gw
Q^MtA
^J. F. Farrell
RMC3300020000011
OATt_ JO* NO.
BARNARD 4 BURK, INC.
CONSTRUCTION DIVISION
.. o.
3 - 7V UJD
"O"* M"**11*
DAILY CONSTRUCTION REPORT
a fzA ^iocation
J
J,------------
-- - -_____V | wqrkmdi
ypcpimw IRON WORKERS BOU-ER MAKERS Q Miu-wmaHTS
CARPENTERS
OPERATORS
LABORERS
CEMENT FINISHERS ' TRUCK DRIVERS
WAREHOUSE OTMMi V7__/
/ oL
/ y / / /
/
OffICI STAFF FIELD STAFF CONSTRUCTION DIV. TOTAL
/
/
//
)
//
3
n
/ v Q. / 3 7
it
/
TOTAL
/
/3
l &
t3s
V
ya /_
3L
/ V 3 />??
a
------------------------------------------------ =-------------------------------------
i *>wumrr
0NCDN. S
CRANES
CHERRY ^ICXKItS
nCX-UF TRUCKS OTHER TRUCKS
L
/
/
K&RSF*"" AIR COMPRESSOR TEST PUMP
/
SACKMOC
JACKHAMMERS S
SMALL
IMPACTS.
TMOOIULJS
I.E.
POL
MR
OFFICE TRAUR
CHANGE SHACKS
eurriNa mos
v
/ A
V
a
Qmib Total
material needs
13
DRAWINGS OR INFORMATION NEEDS
a
WORK ITEMS ACCOMPLISHED THIS DAY
6DATE.
JOI NO. job name
urvi\iTr\i\u u
**>'-*,
CONSTRUCTION DIVISION
7V rK/
'Mr >t
P. O. BOX I1A1A BATON BQUGS. LOUISIANA
DAILY CONSTRUCTION REPORT
foync Id___ Mt~t<t /fi-- location R 3 k?.r;
L<-1 -------------------------
. LXTTM SMALL BI WMTT1M BY TMl TlUUlim AND DIOMID BT KTTM TNI SUKDINTIMBIMT AMO nIltM*. AMD IACM W1U.
II IIIUI KBONfVn.1 POB ACCURACY OP TH.D LCTTIB AND POB ONIBBKJN OP ANT PACT! WNICM TNI MAIN OPP1CI SHOULD KNOW.
solicit suooujnoNs^PON w^bsasino ippiciinct and spud.
\jL
~~--
SlOMIDh.
Smnsb.
WORKMEN PIPEFITTERS
FORCMIX
r
IRON workers
PT/?OMB-UAKUS.
SL
/
MIULWR1CHTS
CARPENTERS OPERATORS LABORERS CEMENT FINISHERS
f
i
1
TRUCK DRIVERS
WAREHOUSE
Roamti n
}
OPPICC STAFF FIELD STAFF
1 _ _.
JJl.
nCONSTRUCTION V. TOTAL
_
P>*. f'iecf'rt I
MEN
i
TOTAL
|
'' ebuipmekt
/ | CRANES
)D^ 1 CHERRY PICKERS
A
| PICK-UP TRUCKS
| OTHER TRUCKS
IJL
.3..^ i
JO _ n
/ . _J___
=? t.... / ?
Py /,
4
/
PIPE THREAOtNO MACHINES AIR COMPRESSOR TEST PUMP
BACKHOE JACKHAMMERS *
SMALL. TOOLS I.E. IMPACT*. BRILL*. MIUUWI OFFICE TRAIUCR CHANCE SHACKS CUTTING RIOS OIMtlli
CO.
OUTSIDE
OWNED RENTAL
a
/
(
1
1
A
l
1
/ -^QniThry is/) ifZ
v
PROJECTED EMO DATE
Grand Total
MATERIAL NEEDED
/?-
Fork? LiR4-
DRAWINGS OR INFORMATION NEEDED
WORK ITEMS ACCOMPLISHED THIS DAY
DISTRIBUTION:
MCA OP CONST. ------------iMomitnma -_______________
PLAN A ICHIO. _____ coat conthol ______
POACHAUNG ________________ COUIP. MCA.
Sicnid-------------------_________________________________________
RMC3300020000013
RMC3300020000001
CONTRACT CHANGE REQUEST
BARNARD 4 BURK, INC.
CONSTRUCTION DIVISION r. o. aox itaaa
BATON ROUGE. LOUISIANA 70813
Caatracl Na.
58386-M
job mu
_____________Coke Plant Expansion
CUSTOMtRY NAIM
Reynolds Metals Co.
Cantractort Jab Nt.
7404
Cbaaga Reqoasl Na.
16
EXTRA WORK THE FOLLOWING CONTRACT CHANGE REQUEST IS SUBMITTED FOR YOUR APPROVAL:
L DESCRIPTION or WORK!
Refabricate steel span for transite pipe at south side of control building span interferred with biulding girts and siding. Moved
north span member appros. 4" south and shortened lateral braces and struts.
4 I.W. 1 Op.
4 days 2 days
Estimated Total
= 128 M.H. = 16 M.H.
144 m. a. (s/n
rs?
Drawing Error
3. LUMP SUMP PRICK:
t/s-g&.oo
3. CONTRACT IXTINSION RIQUKSTIO TOR AROVI WORK:
1
Customer's Representative
Data
JL-JL+ '74r----------------------- ____________________________________________
Contractor's Rcpresentat 1va
Dele
RMC3300020000002
CONTRACT CHANGE REQUEST
BARNARD & BURK. INC.
CONSTRUCTION DIVISION r. O. BOX
BATON ROUGE. LOUISIANA 708 IS
58386-M
jot mu
________________ Coke Plant Expansion
CUSTOMIt'l KAMI
Reynolds Metals Co.
Ca9r<tr*
7404
22
THE FOLLOWING CONTRACT CHANGE REQUEST IS SUBMITTED FOR YOUR APPROVAL:
t. DISCRETION or WORK)
Change 30" transite duct bridge footing at S.E. corner of control bldg.
o
ll
5 lab. 4 Carp. 2 I.W. 5 Lab.
1 day 1 day H day hi day
M.H.
= 32 M. H. = 8 M.H. = 10 M.H.
1 Cem. M hi day
1 I.W.
h day
1 carp.
h day
Estimate Total
= 2 M. H. = 2 M.H. = 2 M.H.
96 m.h. (sn*n #/65'C>
Eng. Error concrete to steel drawing discrepancy
2. LUMP SUM? ?RICI>
*/os~C.c>o 9
3. CONTRACT IXTINSION RIQUSSTID I OR AROVI WORK:
Cu stoner's_Represen tat i ve
Data
______ ________________________________ y/ -J.j.-Tq
Contractor's Represented!v
Data
1
//-22-7U \
RMC3300020000003
INJRArOMPANY CORRESPONDENCE
RP O6R >R<w.
F R O M T O:
J. F. Farrell - Baton Rouge
Mr. P. L. Patty - Baton Rouge
C O P Y:
DATE ft SUBJECT:
Messrs; T. M. McCracken, J. A. Williams, F. C. Priest
Progress Report - Job 7727 - W/E 12-28-74
December 31, 1974
Barnard & Burk personnel on site as of 12-24-74 - 11 Betz personnel on site as of 12-24-74 - 2 Leavesley McCollum personnel on site as of 12-24-74 - 2
Barnard & Burk move-out completed on Christmas eve, 12-24-74, with the exception of the office trailer and one cherry picker. All facilities completed and turned over to the Plant as of 12-24-74.
Nichols is continuing to erect the stack and should be complete by 12-31-74.
Leavesley-McCollum brought two men on site to build a platform for installing stack refractory. Refractory installation should begin on 1-2-75 and should be completed for startup on 1-15-75.
Instrumentation and electrical check-out is being done with two electricians from Betz Electric under the Plant maintenance agreement.