Document ByX159Ogp6q84vBg9JXn0X3vL
1/8
Comit REACH - BCR 2021/07 (Belgisch Comit REACH) Closed Comit REACH 07/12/2021 OPEN (9.30) + CLOSED 13.30
DRAFT AGENDA closed session www.reachinbelgium.be
FOD Volksgezondheid, Veiligheid van de Voedselketen en Leefmilieu
Directoraat-generaal : Leefmilieu Dienst Risicobeheersing van Chemische Stoffen
(MRB-C)
Galilleelaan, 5 1210 Brussel
www.environment.belgium.be
SPF Sant publique, Scurit de la Chane alimentaire et Environnement
Direction gnrale : Environnement Service Matrise des Risques pour les substances
chimiques (MRB-C)
Avenue Galille, 5 1210 Bruxelles
OPEN SESSIE BCR - starts at 9.30 - 11.30 1. Registration : process for oligomerization and polymerization of vegetable oils
2. Restriction PFAS - Fluoropolymers
GREEN FRIX SA
9.30-10.10
The members of the BCR take note of the presentation and the information communicate by Green frix. PlasticsEurope
10.10-10.50
The members of the BCR takes note of the presentation on the PFAS restriction for the fluoropolymers . BREAK
10.50-11.00
3. restriction Microplastics 4. Restriction Lead in PVC 5. AOB
2/8
Essenscia
11.00-11.40
The BCR members take note of the presentation of essencia on the microplastic dossier. European PVC Profiles and related Building Products
11.40-12.20
The BCR take note of the presentation of EU PVC and the plastic association on the lead dossier.
3/8
GESLOTEN SESSIE BCR - starts at 13h30 with AP 3.2
AGENDA ITEM
1. Approbation de l'agenda 2. Approbation du compte rendu
DOCS/ SUBJECT
PROCEDURE
1.1
Agenda 07/12/2021
FOR DECISION
2.1
Draft PV du 30/09/2021 - closed + confid. open BCR (
FOR DECISION
Will be send before the next meeting with 2weeks validations if no
3. Informatie / Consultaties
4/8 comments validated otherwise formal procedure during the meeting.
3.1
Background paper workshop auth/restr.
For consultation/for
Slovenia
info
3.2
Enforceability AfA decisions
For consultation/for info + linked to decisions under 4.2.4
Presentation >
There is a new procedure in the R committee > drafts only discussed once if possible & shortened delays for reaction/commenting/..., especially after the meeting. Rain cabon Belgium Zelzate ? VL input?? ( left the meeting). Proposal of stopping the current written procedure because we didn't receive any explanation on the last changes of COM in the proposal. Will be discussed with COM and VL.
3.3
Restriction Lead in PVC :
Debriefing of Discussions at REACH Cee (7/12/ AM) and elements for BE position (Ref to written consultation).
5/8
Commenting the morning presentation= -controlled loop vs closed loop. -If we have to give a upper level for the recycled materials > time limited + labelled+no supplementary exposure ( Workers,consumers,env)+full tracability of the materials ( pipe to pipe)
- Labelling ( contains recycled PVC or lead, ...) They prefer no labelling ( SCIP will do the work) All PVC > construction and consider that there is a lead contend
They collect from the source
Labelling `without lead' on a voluntary basis . ><Against free labels
Value or % 2% of lead in PVC
Building limites: pipes+windows frames , etc.
Decontamination= q
Time limite proposed was 10y in stead of 15y . With a revision close. 10 or 15y Decontamination n lab level > the investments should be there > Virgin will be less expensive > time for the retur on investment . Avoid landfilling but also investments should be economically viable.
Ok Post Consumer PVC > from EU and how check the waste streams > non EU wastes and the lead there.
6/8
We are not in a position to prevent no EU waste. Certification scheme for imported PVC containing lead. Find a was that all the PVC containing lead should be recycled ( if not from a frame > will be a frame) pipe to frame ? possible ??
Other profiles/ auxillary profiles to windows and door frames -( constructions parts?, Other ok but a clear labelling and way to sort > a short list !
3.4
Restriction on creosote (renewal process before
For info / consult
review dossier by FR): Debriefing of Discussions at
REACH Cee (7/12/ AM) (Ref to written consultation:
3.5
Formatted CCIEP PFAS July 2021 report -
For consultation/for
distribution to the VL PFAS working group and
info
update on the renewed CCIEP PFAS mandate.
VL expert group ( June 2021) to complement their own report . the PFAS report is under the GDPC network for the formal approuval of the diffusion( VL authorities + scientifics /no industries) New PFAS mandate - approuved by the ccim BUREAU ;
3.6
Discussion - followup > open session
7/8 For info
4. Beslissingen 4.1. FOR DECISION
3.7 4.1.1
Belgium MNI - ECHA request
For info / consult. For Decision
4.1.2
4.1.3
4.2. FOR DECISION (BCR WRITTEN PROCEDURE) : FOR ENDORSEMENT
4.2.1
REACH Committee= vote on the change of annexes
of REACH
4.2.2
REACH Committee = Annex XIV of REACH ( A-
XIV)
Endorsement of the written procedure
Endorsement of the written procedure
5. AOB 6. Volgende vergadering closed session
4.2.3
4.2.4
4.2.5 4.2.6 5.1 5.2 6.1
BE renewal ECHA MSC alternate member A. Dobrak (BE renewal ECHA MSC alternate member 2021) AfA decisions for vote : see AfA section - written procedures sharepoint
Endorsement of the written procedure
Endorsement of the written procedure
AOB conseil ENVI New colleagues Volgende BCR-
For info
Virtual/office?
8/8
Suite au doodle envoy le prochain meeting BCR sera le 22/2/2022