An Exposure Study of Bystanders and Workers During the Installation and Removal of Asbestos Gaskets and Packing
Carl Mangold Katherine Clark Amy Madl and Dennis Paustenbach
Environmental Control Sciences Inc. Bellevue Washington ChemRisk Inc. San Francisco California
From 1982 until 1991 a series of studies was performed to evaluate the airborne concentration of chrysotile asbestos associated with replacing gaskets andpacking materials These studies were conducted by the senior author in response to concerns raised by a reportfrom the Navy in 1978 on asbestos exposures associated with gasket work A series of studies was conducted because results of those who worked with gaskets within the Navy study did not address the background concentrations of asbestos in the work areas which may have been significant due to the presence of asbestos insulation in the ships and shipyards The intent of the studies performed from 1982 through 1991 was to create the Navy's work practices in a contaminant environment during an hour workday so the data could be compared with the OSHA permissible exposure limit PEL Samples were collected to characterize personal and area airborne asbestos concentrations associated with the formation removal and storage of gaskets as well as the scraping of flanges and the replacement of valve packing The results indicate that the hour weighted average TWA exposures of pipefitters and other tradesmen who performed these activities were below the current PEL and all previous PELs Specifically the highest average 8hour TWA concentration measured for workers manipulating asbestos gaskets during this study was 0.030 cc during gasket removal andflangeface scraping onboard a naval ship Likewise the hour TWA breathing zone concentrations of a worker removing and replacing asbestos valve packing did not exceed 0.016 cc In most cases the concentrations were not distinguishable from ambient levels of asbestos in the ships or the general environment These results are not surprising given that asbestos fibers in gasket materials are encapsulated
within a binder
Keywords asbestos gaskets Navy packing materials shipyard
Address correspondence to Amy Madl ChemRisk Inc. 25 Jessie Street at Ecker Square Suite 1800 San Francisco CA 94105 mail
amadl@chemrisk.com
sbestos is a mineral that was commonly used in industrial operations in the United States for the greater part of the 20th century Because of its high thermal stability and resistance to corrosion it has appeared in more than 3000 manufactured goods and at
least 30 million tons of asbestos have been used in construction
and manufacturing industries since the year 1900. The widespread use of asbestos in the past has led to exposure of millions of Americans at concentrations that at times resulted in significant adverse health effects Today asbestos use is highly regulated and most industries have replaced asbestos materials with substitutes in an effort to protect workers and comply with federal regulations
The concerns about the role of asbestos in the development of a pulmonary disease began in the United States in the 1930s and progressed slowly as more was learned about sources of exposure and the pathogenesis of asbestos diseases
Much of the historical research was focused on disabled
workers with obvious related exposure to raw asbestos
fibers used commercially Few if any industrial hygiene controls were followed at that time and asbestosis of varying degrees of severity was frequently observed among highly exposed workers These workplace conditions continued until the 1960s when the association between asbestos and certain types of cancers became clear and industrial hygiene practices in the workplace began to reduce occupational exposures
Historically asbestos insulation and asbestos gaskets and packing have been used on pipes and machinery in industries such as refineries powerhouses chemical plants and naval ships and shipyards Asbestos was considered a magic mineral because it was inexpensive and highly resistant to heat and corrosion Alternative materials with comparable properties were not readily available and so asbestos was widely used in high heat operations internationally Up until the late 1960s the U.S. Navy used amosite and chrysotile asbestos insulation extensively on pipes and machinery onboard naval ships The Navy published explicit specifications regarding the percentages of each fiber type amosite or chrysotile that were to be used in materials such as insulating felt insulating blocks insulating cement sheet gaskets and packing materials Some of the containing materials used included 85 amosite insulating blocks and 100 chrysotile insulating cements In the first author's experience chrysotile was the only type of asbestos used in naval gaskets and packing however crocidolite gaskets have been historically used for
Journal of Occupational and Environmental Hygiene
February 2006
87
highly acidic applications such as certain processes in pulp
and paper plants and refineries The magnitude of asbestos use in a naval shipyard was
extremely high For example a World War era destroyer is estimated to have contained at least 96,000 pounds of asbestoscontaining insulation Based on data presented by Fleischer et al naval shipyards are estimated to have used between 100,000 and 500,000 pounds of asbestos products per month for new ship construction during World War II At least
90 of these asbestos materials were in amosite blankets or
pads loose amosite magnesia block insulation and asbestos cements All of these materials were loose easily crumbled and handled directly by workers
By comparison gaskets and packing constituted a small fraction of the total weight of the various asbestos products onboard a naval 2,3,5,6,8 and the asbestos within these materials was encapsulated in a binder making it unlikely for the material to release significant amounts of asbestos fibers In the National Emission Standards for Hazardous
Air Pollutants NESHAP regulations the Environmental Protection Agency EPA acknowledged the low potential for gaskets and packing to release significant amounts of fibers The regulations state that even broken or damaged gaskets and packing would rarely if ever release significant levels of asbestos even under the conditions in which a building is demolished
A major goal for industrial health and hygiene professionals in the 1960s was to improve worksite safety and reduce high level asbestos exposures that occurred during the manufacture and use of asbestos products containing raw and friable asbestos that were used in large volumes in construction and in shipyards However at that time smallvolume products and those that were encapsulated were not considered a health 11,12 In the 1970s researchers and institutions including Selikoff and the International Agency for Research on Cancer IARC declared that packing and gasket materials did not pose any conceivable health hazard There were some internal studies conducted during
the 1970s to evaluate worker exposures associated with these
products but most were inconclusive or had small sample populations Additionally these tests were likely obscured by the high background levels from highly friable products such as asbestos insulation Without adequate characterization of background concentrations it is virtually impossible to identify the source of exposure in worksite studies when multiple asbestos products are used in close proximity to each
other
During the 1960s and 1970s the Navy pioneered changes in the use of asbestos by implementing dust control devices enforcing the use of respirators and replacing asbestos with alternative materials as they became available As sources of free fibers were eliminated or contained the Navy focused on evaluating level sources of exposures such as gaskets Other industries followed the Navy's lead in implementing industrial hygiene controls and eliminating the use of friable containing products By the 1980s use of asbestos
for new applications in the United States was uncommon However due to the latency of asbestos diseases med-
ical and scientific researchers continued to evaluate asbestos
exposure and incidence of asbestos disease among workers
In 1978 the Department of the Navy as a part of an ongoing industrial hygiene program set about collecting airborne asbestos samples during the storage handling and processing of gaskets of all kinds in naval shipyards The evaluation was an important undertaking because only a few such studies
had been conducted The Navy report concluded that
even the simplest of general housekeeping controls or work practices were sufficient to maintain occupational exposures to asbestos at acceptable levels Although the Navy achieved its intended objective of characterizing the exposure to any and all fibers in the breathing zone of workers it did not measure exposure levels specifically associated with handling of containing gasket materials Breathing zone air samples were collected in work areas during various gasket processing activities however the area was not cleaned prior to the commencement of the study Furthermore given that background samples were not collected prior to initiation of gasket work it is questionable whether the data truly reflected asbestos exposures associated with gaskets Although the concentrations reported for gasket handling were generally close to 0.1 cc trace contamination from insulation or other sources could have easily contributed to these values
The intent of the study presented here was to measure personal and area airborne asbestos concentrations associated with handling of containing gasket and packing materials by repeating many of the activities studied by the Navy yet performing them in a contaminant environment The measurements were collected between 1982 and 1991 by Carl Mangold a certified industrial hygienist with 10 years experience working on asbestos control measures for the Navy at the Puget Sound Naval Shipyard As a result of his shipyard experience Mangold was familiar with techniques and activity frequency associated with gasket and packing replacement as well as the high potential for worksite asbestos contamination
from other sources Recent interest in asbestos exposures
for workers handling nonfriable and encapsulated asbestoscontaining materials prompted the authors to publish the data from this comprehensive series of studies
METHODS
he objective of this series of studies was to evaluate potential asbestos exposures to workers and bystanders during the removal and installation of containing gasket and packing materials Personal and area airborne
asbestos exposures were characterized over the course of an 8-
hour workday as workers performed gasket and packing work
The activities studied included scribing of gasket materials
formation of asbestos sheet gaskets opening of flanges and removal of gaskets cleaning of flange faces using putty knives
88
Journal of Occupational and Environmental Hygiene
February 2006
and wire brushes and removal and installation of asbestos
packing from valves In these studies emphasis was placed on characterizing 8-
hour TWA exposures so that the magnitude of exposure to the maximally exposed worker e.g. a worker who replaces gaskets or packing in the field throughout the course of the day could be determined The time required to perform tasks associated with gasket and packing replacement makes it unlikely that a worker would perform more than eight replacements of either gaskets or packing per day Based on professional experience with the exception of a wide down or overhaul it is uncommon for a millwright or other craftsman to replace more than two gaskets or packings in a single day
By simulating this work it was possible to repeat the activities several times throughout the course of the day because all the tools raw materials and flanges were already
set up at the workers workbench Thus the measurements collected in these studies likely represent more severe conditions than those experienced by workers in the field In practice workers typically receive their assignments go to storerooms and lockers to retrieve the appropriate materials and tools for the job and change into their work clothes
Additionally workers must travel to each location where the flange or valve work will be conducted determine how the flanges or valves will be accessed and then remove pipe insulation and bolts before any gasket replacement work is performed The actual time spent forming a gasket removing and installing packing or gaskets is a small portion of the overall workday
Short excursion samples were not collected in this series of studies for two reasons First the short airborne concentrations presented in the 1978 Navy study were nearly uniformly below both the current and historical excursion limits Considering that the Navy study is likely an overestimation of genuine exposure it seems unlikely that any shortterm samples collected in a contaminant environment
would be greater than those concentrations measured in the
Navy study Second the exposures experienced by a worker repeating task eight times over the course of an hour sample made it unnecessary to collect short excursion samples If the airborne asbestos concentration due to one repetition of the task was in excess of the excursion limit then the hour TWA concentration for eight repetitions of the task would likewise be in excess of the PEL Therefore it was determined that the best
way to evaluate exposure to a worker whose responsibilities include frequent gasket and packing replacement would be to collect samples during several repetitions of the tasks over
8 hours
Only phase contrast microscopy PCM analysis was conducted on the filter samples during the phases of this study performed prior to 1989. At the time transmission electron microscopy TEM analysis was not a standard analytical method for airborne asbestos and even today TEM data are not directly comparable to the Occupational Safety and Health Administration OSHA permissible exposure limit PEL
Although it is a more powerful analytical method due to the higher resolution for counting smaller fibers and differentiating fiber type its use in worksite regulatory compliance is a supplement to PCM data by providing information regarding fiber type and size PCM analysis is the most important method for comparing exposures to the OSHA hour TWA PEL The TEM analysis that was performed served to confirm the
absence of asbestos and asbestos fiber contamination as
indicated by the PCM data Bulk samples were collected only in the 1989 series of studies and were analyzed by polarized light microscopy PLM The rationale for assuming that the gaskets and packing contained asbestos is discussed in the Methods section for each study
This series of testing is unique among the existing published studies on gasket and packing removal and replacement
because it combines elements of both worksite and simulation
studies Like simulation studies this series of studies empha-
sized the characterization and the elimination of sources of asbestos contamination so that all of the measured airborne
asbestos could be attributed to the work activity of interest The limitation of simulation studies is that they may be performed by scientists unfamiliar with typical worker techniques or daily activities Worksite studies overcome this by sampling workers as they perform their daily tasks however these types of studies are often subject to contamination from other activities or general contamination in the area In this series of studies the first author's previous employment history lent him considerable familiarity with the activities of interest as well as the scientific methods for evaluating exposure and minimizing
contamination
These studies on gaskets and packing took place over several years To clarify the differences between each study the methods are discussed separately
Test : Disassembly and Assembly of Flanges Containing Three Types of Gaskets No Flange Face Cleaning Conducted in 1982
All simulation work was performed inside an enclosure measuring 3 ^ 3 ^ 3 meters 27 cubic meters that was constructed of PVC plastic piping and 0.01 cm polyethylene plastic including the floor This type of enclosure was selected because it represents the smallest practical work space in which gasket work would normally have been conducted No dilution
or local exhaust ventilation was used The work area was
cleaned between each activity Standard medium flanges approximately 8 to 16 cm
in diameter were taken from a decommissioned naval ship and were cleaned thoroughly prior to the study to remove
any surface contamination The mechanic assembled and
disassembled flanges containing gaskets intermittently over the course of an hour day similar to the typical work activity in the removal and installation of gasket materials However the flange faces were not cleaned in any way One day was devoted to each of the three types of gaskets that were evaluated spiralwound braided and encapsulated The simulated work
Journal of Occupational and Environmental Hygiene
February 2006
89
activities evaluated included the storage handling removal and installation of containing gaskets
The mechanic remained in the plastic enclosure for two hour work periods separated by a half hour break At the beginning of each of the two work periods the mechanic was fitted with two faced 37 mm 0.8 m mixed cellulose ester MCE filter cassettes positioned in the breathing zone on the left and right lapel for a total of four samples per day Each breathing zone sample was collected for 4 hours at 2 min Additionally two area samples were collected per hour period each one on an opposite side of the sealed enclosure All samples were analyzed by PCM analysis using the CAM 239 Method the precursor to National Institute for Occupational Safety and Health NIOSH Method 7400. Bulk samples were not collected from the gaskets removed in this study Based on the ship's naval provenance and the appearance of the gaskets the first author was confident that most if not all of the gaskets contained
asbestos
Test II Various Gasket Work Conducted in 1982 Simulated work in this phase of testing was conducted
in industrial work areas where containing materials were routinely processed rather than in an enclosed contaminant workspace Flanges were taken from an outservice naval ship and the exterior surfaces were cleaned thoroughly prior to the study The work area was not cleaned or decontaminated prior to the study but samples were collected for 8 hours each for 3 to 5 days before any gasket work was performed to evaluate background airborne asbestos in the
work area
Personal air samples were collected for 8 hours at 2 min on faced 37 mm 0.8 ...mMCE filter cassettes placed in the breathing zone of workers conducting the gasket activities
of interest Gasket formation activities included the use of ball
peen hammers operated mechanical punches machine punches machine shears machine nibblers and the use of hand shaping tools such as knives scissors and scribes Other activities evaluated included gasket installation on a clean surface gasket removal with hand scraping of the flange surface and hand scraping of the flange surface only no gasket removal The workers wore clean work clothes or impregnated coveralls during each day of the test period
The activities were performed by workers at a typical rate over the course of the day which ranged from intermittent to
continuous The intent of this test was to compare the hour
TWA airborne concentration during gasket work to the average background airborne asbestos All samples were analyzed by PCM analysis using the CAM 239 method Bulk analysis was not performed The first author had knowledge that the gaskets being formed at this industrial site contained asbestos and as with the previous study his belief that the flanges contained asbestos gaskets was based on his knowledge of the flanges
source
Test III Disassembly of Ship Flanges and Gasket Removal Including Flange Face Cleaning at Two Different Worksites Conducted in 1983
The purpose of this study was to evaluate the concentration of airborne asbestos while removing gaskets and cleaning flange faces within an actual ship The study took place in two phases one onboard the USS Gypsy ARSD and the other using valves taken from a former naval ship the Offshore I. Both ships were World War II vintage transport vessels and were ideal for this experiment because they contained flanges that had probably never been opened during the life of the ship meaning they had been in place for nearly 40 years Many of the flange bolts had to be cut with an acetylene torch because they had been frozen by age and corrosion
In the first phase of the study onboard the USS Gypsy an auxiliary ship 20 asbestos gaskets were removed from flanges on the ship and the flange faces were scraped with a putty knife The gaskets were removed from four flanges over the course of each hour workday for 5 consecutive days Each day four samples were collected for 8 hours at 2 min on faced 37 mm 0.8 ...mMCE filter cassettes placed on the right and left lapel of the workers removing the gaskets The workers wore clean clothing each day to minimize the effects of contaminated clothing Although the ship's insulation had been removed long before the study took place background samples were collected onboard the ship and away from the work area to verify that the background concentrations of asbestos were negligible
In the second phase of this study 30 pipe flanges were removed from the first and second deck of the Offshore I an LST tank landing ship using an acetylene torch The flanges still intact and unopened were moved to a remote asbestos site and cleaned prior to the study At the study site each flange was placed on a clean piece of polyethylene plastic and disassembled Once the flange was opened the gasket was removed and the flange surfaces were scraped with a putty knife in the manner typical of shipboard procedure
During this second phase of testing six flanges were disassembled during each hour work day over a day period Two breathing zone air samples were collected for 8 hours at 2 min on faced 37 mm 0.8 ...mMCE filter cassettes placed on the right and left lapel of the worker Duplicate environmental air samples were also collected prior to the testing to confirm the absence of ambient asbestos contamination All samples were analyzed by PCM using the NIOSH CAM 239 method Bulk analysis was not performed on the gaskets removed during this test However the gaskets used in the following test Test IV were also taken from flanges on the USS Gypsy and were analyzed by PLM The results of the bulk sample analysis are presented in the
Test IV section
Test IV Gasket Formation Removal and Flange Face Cleaning Conducted in 1989
The primary purpose of this set of studies was to evaluate bystander exposure to asbestos due to gasket removal and
90
Journal of Occupational and Environmental Hygiene
February 2006
replacement activities although worker breathing zone samples were also collected Air samples were collected during gasket formation gasket removal and the cleaning of flanges from valves and piping taken from the USS Gypsy ARSD This study was similar to the previous study performed in 1983 yet it characterized additional gasket formation and removal activities and included an evaluation of bystander exposures Some of the gaskets collected during this study were taken from flanges that contained bolts that were frozen in place with corrosion and showed no indication of being opened since the vessel was built Prior to the study all of the residual asbestos insulation on the outside of the piping was removed to prevent contamination when the gaskets were removed from the flanges The study took place in a new metal building to ensure that accumulation of dust or previous
asbestos insulation contamination was not present Electron
microscopy samples showed that the amount of ambient asbestos in the facility was 0.002 fibers or less for all sizes of
fibers
A clean work bench was placed in the center of a clean enclosure measuring 6 ^ 6 ^ 3 meters high Figure 1 There
was no ventilation in the enclosure and there were no air ex-
changes as the study took place The gaskets were processed on the bench according to the descriptions given by some workers All of the work was performed by the first author or by a professional mechanic impregnated protective clothing Tyvec was worn by the operator to minimize contamination and prevent confounding personal air measurements with dust resuspended from worker clothing The tests were conducted
over an hour workday so that the data could be compared to the federal occupational standard for asbestos One personal sample was collected in the breathing zone of the operator at 2 min Eight area sample stations were set up with four stations being within 1.5 m the work station and four within m at approximately 10 min Both personal and area samples were collected on faced 25 mm 0.8 mMCE filter cassettes The area samples were analyzed by both TEM and PCM using NIOSH methods 7400 and 7402. The personal samples were analyzed by PCM using NIOSH method 7400. Samples of the removed and installed gaskets were analyzed by PLM
Gasket Formation Using Hand Tools Asbestos exposures associated with gasket formation using
hand tools were evaluated over the course of 4 days
Hand tools used for gasket formation included a scribe
ball peen hammer circular cutter hollow punch and hand shears The new gaskets were made from Garlock gasket material style 7735 Garlock Sealing Technologies Inc. Palmyra N.Y. containing about 70 chrysotile asbestos This type of gasket material was typical of the types used from the 1940s to 1970s Activities were repeated intermittently similar to the rate of a worker preparing gaskets throughout the day
The following gasket forming activities were studied each on a separate day
Scribing of gasket material Two gasket stock pieces were
marked with the scribe each hour for 8 hours for a total of 16 gaskets over the course of the hour day
10 North
5 North
10 West
5 West
Work Bench 5 South
5 East
10 East
10 South FIGURE 1. Location of area sampling stations in Tests IV and V
Journal of Occupational and Environmental Hygiene
February 2006
91
Gasket cutting with a circular cutter One gasket was cut each hour for 8 hours for a total of eight gaskets Gasket cutting with a ball peen hammer Both the shape of the gasket and the bolt holes were cut using the ball peen hammer One gasket was formed each hour for 8 hours for a total of eight gaskets Gasket cutting with hand shears and a hollow punch One gasket was formed each hour for 8 hours for a total of eight gaskets
Removal of Asbestos Gaskets
One day was spent evaluating asbestos exposures during the removal of asbestos gaskets Eight flanges were opened over an hour sampling period to determine the hour TWA associated with the removal of gaskets from flanges Although the gaskets were pried from the flange using a putty knife the flange faces were not cleaned All of the removed gaskets were similar and determined to contain chrysotile
asbestos
Flange Face Cleaning Three days were dedicated to evaluating asbestos exposures
during flange face cleaning In this evaluation a hand scraper hand wire brush and power wire brush were used to remove any residual material left on the flange face after the gasket had been removed The work with each tool was performed on a separate day and repeated at least eight times over the hour day All of the gaskets taken from these valves were verified to contain chrysotile asbestos and therefore the gasket residual also contained chrysotile asbestos
When cleaning the flange face with the hand wire brush
it was necessary for the worker to also use a scraper to clean
the surface The power wire brushing involved the use of an
electric drill with a circular wire brush attachment
Test V Removal and Replacement of Valve Packing
Conducted in 1991
The air sampling during the removal and replacement of valve packing was conducted using two dozen medium sized steam valves obtained from a municipal steam plant The
exterior surfaces of the valves were cleaned to remove any
residual containing materials adhering to the valves without disturbing the packing nuts and containing packing material in any way
A clean workbench was placed in the center of a clean enclosure measuring 6 ^ 6 ^ 3 m high Figure ) There was no ventilation in the enclosure and there were no air exchanges as the study took place The valves were placed beside the workbench so that one valve after another could be processed by removing the old and installing the new packing material The first author and an assistant both wearing breathing zone sampling cassettes worked on eight valves over the course of approximately 4.5 hours The personal samples were collected at 2 min and the area samples at 10 min on 25 mm 0.8 m MCE filter cassettes impregnated protective clothing Tyvec was worn by the operators to control for the potential
release of asbestos fibers from street clothing and dust from shoes Eight area sample stations were set up four were
1.5 m away from the work station and four were 3 m away
Area samples were analyzed by both PCM and TEM using NIOSH methods 7400 and 7402 respectively The personal samples were analyzed by PCM using NIOSH method 7400 Bulk analysis data from the packing used in this test are not
available
The valves were disassembled and the old packing was removed New packing with similar asbestos content to that used during the 1950s Garlock styles 127 and 733 containing about 70 chrysotile asbestos was measured cut
and installed in the valve This process continued for more
than 4 hours and since it is unlikely that a worker would replace packing for any more than eight valves per day it was assumed that the asbestos concentrations measured during the sampling period were representative of the upper range of concentrations a worker would experience over an hour workday Based on professional experience unless the circumstances were unusual it is more common for a millwright to replace packing on only two to three valves in a single day
RESULTS
T ables V present the data from the studies described above including sample averages and standard deviations For samples below the detection limit half the limit
of detection was used for the calculations
Test : Disassembly and Assembly of Flanges Containing Three Types of Gaskets No Flange Face Cleaning 1982
As shown in Table I the assembly and disassembly of flanges without any flange face cleaning produced asbestos
fiber concentrations that were at or below the lower limits
of detection Average breathing zone hour TWAs ranged from 0.004 to 0.005 cc for the different types of gaskets with standard deviations less than or equal to 0.001 cc Average area samples were at or below the limit of detection
of 0.004 cc
Test II Various Gasket Work 1982 This phase of the study involved gasket removal and
formation in an environment that was neither enclosed nor
asbestos thereby characterizing both the background and the combined background and activity airborne asbestos concentrations associated with the worksite Many of the activities or areas sampled as reported in Table II were
similar to those sampled by the Navy in their 1978 report
The area samples taken before the work activities commenced had average concentrations ranging from 0.02 to 0.11 cc with standard deviations as high as 0.07 cc The average hour TWA exposures including background sources of asbestos
92
Journal of Occupational and Environmental Hygiene
February 2006
TABLE I. Airborne Concentrations of Asbestos for Workers During Disassembly and Assembly of Flanges
Asbestos Concentrations by PCM cc
Breathing Zone
Area
Gasket Type
1st hour
TWAD
hour
TWAD
hour TWA
Std
Dev.E
1st hour
TWAD
hour
TWAD
hour TWA
Std
Dev.E
Spiral wound metal encased
Braided
Encapsulated sheet
0.005 0.005 0.005
0.003 0.006 0.005
0.004 0.005 0.005
0.001 0.001 0.000
0.002 0.003 0.003
0.002 0.004 0.004
0.002 0.004 0.004
0.000 0.001 0.001
Note Flanges which were disassembled and assembled over an hour workday no flange face cleaning contained three types of gaskets Sampling was conducted
in 1982
The limit of detection was 0.004 cc
BPCM analysis counted all fibers > ...min length with at least a 3 aspect ratio For nondetectable samples average and standard deviation were based on 1/2 the limit of detection DTwo samples were collected in each hour sampling period for each gasket type
E
Value represents standard deviation of all four samples collected
ranged from 0.02 to 0.14 cc with standard deviations as high
as 0.05 cc
Statistical comparisons between asbestos measurements for background and specific work tasks demonstrate the difficulty in quantitating level asbestos exposures associated with a particular source when background environmental contamination is present The data collected during each gasket activity were tested for distribution fit using the D'Agostino Test and were found to have a lognormal distribution at a 95 confidence level The sample Student's t test of the transformed data showed no difference at a 95 confidence level between background concentrations and activity concentrations in which five samples were collected for each activity The sample Student's t test of the pooled activity data showed no statistically significant difference between background and activity measurements p = 0.073
Test III Disassembly of Ship Flanges and Gasket Removal Including Flange Face Cleaning at Two Different Worksites 1983
The 1983 study involved the collection of airborne asbestos samples while disassembling flanges at two worksites on a ship and in a building The data from the removal of gaskets from flanges both onboard a ship and in a building are presented in Table III In both settings the background concentrations of asbestos were minimal 0.004 and 0.003 cc respectively
both with a standard deviation of 0.001 cc The average of
the 20 personal breathing zone samples taken onboard the USS Gypsy was 0.030 cc standard deviation of 0.021 cc The average of the 10 breathing zone samples collected at the onshore site was 0.023 cc standard deviation of 0.013 cc These data were tested for distribution fit using the D'Agostino D'Agostino Test and were found to have a lognormal distribution at a 95
TABLE II Activities
Airborne Concentrations of Asbestos for Workers During the Performance of Various Gasket
Hour Asbestos Concentration by PCM cc
Breathing Zone
Background
Site
nB = TWA
Dev
nB
TWA _ Std Dev
Storage of gasket materialC
0
punching
5
Hand operated mechanical punch
5
Machine punch
5
Hand shaping table knives scissors scribes
5
Machine shearing
5
Nibbler machine
5
Flange opened no scraping gasket installation
3
Flange opened scraping with knife
3
0.06 0.02 0.11 0.04 0.09 0.14 0.03 0.03
NA
5
0.01
5
0.02
5
0.04
5
0.02
5
0.04
5
0.05
5
0.02
3
0.01
3
0.02 0.04 0.02 0.09 0.03 0.07 0.11 0.03 0.02
0.01 0.03 0.00 0.07 0.03 0.03 0.05 0.00 0.01
Note Sampling was conducted in 1982 and involved characterization of work activities over an hour workday limit of detection unknown NA - not applicable APCM analysis counted all fibers > ...min length with at least a 3.1 aspect ratio
BEach
BEach sample was collected for 8 hours CNo work activities were conducted in the gasket storage area
Journal of Occupational and Environmental Hygiene
February 2006
93
TABLE III Removal
Airborne Asbestos Concentrations for Workers During Disassembly of Ship Flanges and Gasket
Hour Asbestos Concentration by PCM cc
Source of Valves
Study Site
Valves per
DayC
Breathing Zone n" Average Max
Std Dev
Background n" Average Max
Std Dev
USS Gypsy Onboard ship
4D
Offshore IF Building on land
6E
0.030
10 = 0.023
0.01-0.08 0.01-0.05
0.021 0.013
0.004
9
0.003
0.002-0.005 0.002-0.004
0.001 0.001
Note Sampling was conducted in 1983 and involved flange face cleaning at two different worksites over an hour workday Limit of detection unknown APCM analysis counted all fibers > ...min length with at least a 3 aspect ratio It is assumed that all fibers detected were asbestos
Study took place over the course of 5 days
DTotal
DTotal number of samples collected over the 5 days Four lapel and one background samples were collected for 8 hours each day four valves were processed per day for a total of 20 valves
FTwo
FTwo lapel and two background samples were collected for 8 hours each day however one of the background samples was lost Six valves were processed per day for a total of 30 valves
confidence level The sample Student's t test of the logtransformed data showed no statistical difference p = 0.58
between the mean asbestos concentrations measured in the two
settings
Test IV Gasket Formation Removal and Flange Face Cleaning 1989
Several of the methods used by workers in the field to remove and replace gaskets are listed in Table IV During gasket formation activities using circular cutters hand shears ball peen hammers or scribes the average breathing zone
concentrations were at or below the limit of detection of 0.005
cc by PCM analysis The area samples during the same gasket
formation activities were less than or equal to 0.006 cc by
PCM analysis and less than or equal to 0.003 cc by TEM
analysis All of the standard deviations of the area samples
were less than or equal to 0.002 cc Similarly gasket removal
and flange scraping with a putty knife created breathing zone
and area asbestos concentrations less than 0.005 cc by both
TEM and PCM analysis
Hand and power wire brushing created higher and more
varied data The breathing zone hour TWA airborne con-
centrations were 0.007 cc for hand wire brushing and 0.009
cc for power wire brushing PCM analysis The average
area hour TWAs for gasket removal involving hand wire
brushing and power wire brushing samples were 0.024 and
0.028 cc by TEM analysis while the PCM analysis of the
same samples yielded average concentrations of 0.003 and
0.001 cc respectively The standard deviations of the PCM
data for both types of wire brushing samples were less than
or equal to 0.001 cc yet the standard deviations of the TEM
data was 0.012 cc for hand wire brushing and 0.007 ec for
power wire brushing
Bulk sampling indicated that the removed gaskets contained
60
8ch0rysotile asbestos and the installed gaskets contained
70-80 chrysotile asbestos with no other asbestos fiber types
identified
Test V Removal and Replacement of Valve Packing 1991
Table V shows area and worker airborne asbestos con-
centrations during the removal and replacement of valve packing The eight area samples had an average of 0.008 cc by TEM analysis and an average of 0.004 cc by PCM analysis The standard deviations of the two datasets were 0.003 and 0.001 cc respectively By PCM analysis the operator breathing zone concentration was below the detection limit of 0.011 cc and the bystander breathing zone
concentration was below the detection limit of 0.009 cc Since
a single sample was collected each for the worker and the bystander during the packing activities as compared to several samples collected during gasket activities both samples were submitted for a blind recount The recount yielded operator and assistant breathing zone concentrations of 0.016 and 0.009 cc respectively indicating that there was little variability in the counting method
DISCUSSION
his series of studies evaluated worker and bystander exposures during various types of gasket and packing work including installation removal cleanup and gasket formation Overall the data indicate that the hour TWA exposures to workers performing these activities throughout the hour workday were well below the current OSHA 8hour TWA exposure limit of 0.1 cc and all previous OSHA exposure limits Gasket removal without flange face cleaning yielded the lowest airborne asbestos concentrations with most measurements falling below the limit of detection of 0.004 cc by PCM analysis Table ) The highest concentrations excluding those reported in Table II were measured during the disassembly of flanges onboard a ship with flange face cleaning with hour TWAs of 0.03 cc by PCM analysis Table III The breathing zone concentrations reported in Table II were not significantly different from the background
94
Journal of Occupational and Environmental Hygiene
February 2006
TABLE IV Airborne Concentrations of Asbestos for Workers and Bystanders During Gasket Formation Removal and Flange Face
Activity
Asbestos
Hour Asbestos Concentration by PCM cc
Hour Asbestos Concentration by TEM
ccD
No. of Content of Activities Gaskets
Bystander
Bystander
Performed % Breathing Zone Background n Average Max Std Dev n Average Max Std Dev.H
Circular cutter
16
Hand shears
8
Ball peen hammer
8
Scribe
8
Gasket removal
8
Putty knife
8
Hand wire brush
8
Power wire brush
8
70-80 70-80 70-80
70-80
60-80 60-80
60-80
60-80
0.005 0.005
0.005 0.005 0.005 0.005
0.007 0.009
0.002 0.002 0.002
0.002 0.002
0.002
0.002
0.002
8 0.003 0.002-0.006 0.001 8 0.002 0.002-0.005 0.001
8 0.004 0.003 0.006 0.001 8 0.002 0.002 0.005 0.002
8 0.006 0.004-0.007 0.001 8 0.003 0.002-0.007 0.002
8 0.003 0.002-0.004 0.001 8 0.001
0.002
0.000
8 0.002 0.001-0.003 0.001 8 0.001 0.002 0.002 0.000
8 0.001 0.001-0.002 0.000 7 0.001 0.002 0.002 0.000
8 0.003 0.002-0.005 0.001 8 0.024 0.012-0.042 0.012
8 0.001
0.001
0.000 8 0.028 0.021-0.042 0.021-0.042 0.007
Notes Sampling was conducted in 1989 and involved characterization of work activities over an hour workday There was no ventilation in the room Each task was studied for 1 day one personal and eight
area samples per task APCM analysis counted all fibers > ...min length with at least a 3 aspect ratio
B
Samples below the limit of detection are reported as less than < the quantification limit
C All samples were collected for 8 hours DTEM analysis counted all chrysotile asbestos fibers > ...min length with at least a 3 aspect ratio other asbestiform fibers were not identified E These values represent the asbestos concentration measured by TEM not the corrected PCM concentrations F Bulk samples analyzed using PLM only chrysotile fibers were detected Gn = .
Foi nondetectable samples average and standard deviation were based on 1/2 the limit of detection
95
TABLE V. Concentration of Asbestos for Workers and Bystanders During the Removal and Replacement of Valve Packing
Asbestos Concentration by PCM "
Asbestos Concentration
B
by TEM cc
Activity
Background
Concentration
Breathing _Breathing Zone
Area
Area
by TEMC Worker Bystander n Average Max Std Dev n Average Max Std Dev
Packing removal
and installation
0.002
0.011
0.009 8 0.004 0.002-0.006 0.001 8 0.008 0.002-0.012 0.003
Notes Sampling was conducted in 1991 and involved characterization of area concentrations over an hour workday Personal samples were collected from a
worker and a bystander for more than 4 hours There was no ventilation in the room To evaluate analytical variability the worker and bystander samples were
recounted The results were 0.016 cc worker and 0.009 cc bystander
APCM analysis counted all fibers > ...min length with at least a 3 aspect ratio
B
Samples
below
the
limit
of
detection
are
reported
as
less
than
<
the
quantification
limit
CTEM analysis counted all chrysotile asbestos fibers > ...min length with at least a 3 aspect ratio
These values represent the asbestos concentration measured by TEM not the corrected PCM concentrations
En 1
concentrations Even though some of the breathing zone samples were in excess of the current OSHA PEL of 0.1 cc the corresponding background concentrations were also close
to 0.1 cc
In the studies in which both TEM and PCM analysis were conducted the concentrations reported by PCM analysis were often greater than those reported by TEM analysis In the case of hand wire brushing power wire brushing and packing replacement this was not the case TEM analysis unlike PCM counts only asbestos fibers so it would seem that TEM analysis should yield lower counts than PCM data However TEM provides better resolution than PCM and may count two fibers
when PCM would count one
One shortcoming in the studies reported here is the lack of bulk sampling data for many of the gaskets and packing that were removed and installed Several of the airborne asbestos concentrations were close to background concentrations making it especially desirable to verify that
all of the materials handled contained asbestos However in
conducting these studies there are several reasons that the first
author was confident that the materials contained asbestos
First his former shipyard employment gave him considerable knowledge about the prevalence of asbestos in the gaskets and packing used onboard naval ships Second his background in characterizing shipyard sources of asbestos exposure gave him the ability to visibly distinguish containing materials
from asbestos materials Third based on his interactions with various industries as a consultant he was aware of which
industries historically used asbestos packing and gaskets The study conducted by the Navy in 1978 and those
conducted by the first author of this article were the first to evaluate potential asbestos exposures associated with handling containing gasket and packing materials It was not until 1991 that the first study on this issue was published in the review literature Since then a number of
studies have evaluated exposures associated with removal
and installation of containing gaskets and packing materials Direct comparison of the results from other studies to those described in this paper is difficult given that the tasks evaluated sampling and analytical methods and overall study design are quite different For example some studies
conducted short sampling while others collected samples over the course of an hour workday In
addition different tasks involved with removal and installation of gaskets and packing were characterized by different studies and not all investigators collected background samples
particularly during worksite studies to assess the contri-
bution of environmental contamination to airborne asbestos
measurements
With a few exceptions the results from the series of tests described in this article are generally consistent with other gasket and packing studies conducted to 17,19 21,2T7he exceptions include the studies conducted by Fowler et 26 and Longo et 23 In the Fowler study asbestos exposures in excess of regulatory standards were reported for tasks involving bandsawing stock asbestos sheet gaskets This type of activity was not commonly performed and therefore was
not an area of interest in the series of studies described in the
paper Longo and colleagues reported asbestos concentrations in excess of regulatory levels during the removal of gaskets using scrapers hand wire brushes and power wire brushes This data contrasts the data reported in this study as well as by other authors including the Navy Cheng and McDermott Spencer and Boelter et 17,19 21,23,2I7t is not clear why the data reported in the Longo study are several times higher than the values reported in the other studies however it has been noted that the sample filters were overloaded and that the work area was not decontaminated before each task e.g. power wire
brushing Due to differences in sampling times and vague
study descriptions it is unclear whether the short packing
studies by Milette and McKinnery are consistent with the
hour TWA concentrations measured in this study
96
Journal of Occupational and Environmental Hygiene
February 2006
Work site studies that do not report background airborne
concentrations such as those conducted by the Navy in
1978 and Cheng and McDermott in 1991 could easily
overestimate the airborne asbestos exposures associated with
handling of containing gasket and packing materials Nonetheless it can be concluded from the overall weight of the results from the studies conducted to date that workers directly handling asbestos packing and gasket materials or working in an area where such products are being used up until the early 1980s when the use of asbestos materials became widespread were not likely to have been exposed to asbestos
levels in excess of the contemporaneous PELs
In many industrial settings particularly prior to the 1980s
the contribution of airborne asbestos from other sources
such as insulation would have substantially overwhelmed any potential release from containing gaskets and packing materials As discussed earlier gaskets and packing constitute a small fraction of the containing materials used on a ship Historical exposure studies have shown that exposure during handling of insulation materials can be extremely high Airborne asbestos measurements collected at British Naval shipyards have shown average concentrations of 226 cc range 23-493 cc during removal of sprayed crocidolite asbestos 152 cc range 7-896 cc during removal of pipe lagging and 9 cc range 0.1-55 cc
during application of pipe lagging Similarly relatively high
exposures were documented among insulation workers in U.S.
naval shipyards Nicholson and colleagues reported average
airborne asbestos concentrations of 4.6 cc during mixing and applying cement insulation 11.5 cc during cutting and applying block insulation and 67 cc while spraying asbestos fiber insulation Intermittent peak exposures from rip out of asbestos insulations in machinery spaces boiler engine and control rooms of ships could measure in the hundreds
of fibers as measured in the 1960s An hour TWA of
0.03 cc during the disassembly of flanges onboard a ship with flange face cleaning the highest average concentration measured in this study is negligible compared to potential exposures associated with direct handling of insulation material or working in an area in which insulation work is being
conducted
The data from the samples collected during all activities associated with asbestos gasket and packing work indicate that the asbestos fibers released during these activities are considerably lower than the current hour TWA permissible exposure limit of 0.1 cc let alone all previous standards Both the worker and bystander hour exposures were extremely low often below the limit of detection The TEM data were supportive of PCM measurements which is to be expected when sources of background contamination of asbestos is eliminated The data from this study represent the actual airborne asbestos exposure encountered by a worker or bystander as gasket and packing replacement are performed These data indicate that asbestos exposure to workers conducting removal and installation of containing gasket and packing materials is below historical and current occupational exposure
limits for asbestos and suggest that the health risks associated
with these activities are negligible
ACKNOWLEDGMENT
his work was supported by Garlock Inc. a gasket wack reshapporten reshapporten reshapporten lved in thigation regarding asbestos Two of the authors Carl Mangold and Dennis Paustenbach have testified as experts in cases involving
asbestos
REFERENCES
1. Karnell J. and J. Starr Historical perspectives on asbestos
Policies and protective measures in World War II shipbulding Am J.
Ind Med 359
3713987
2. United States Navy Military Standards Thermal Insulation Require-
ments Bureau of Ships Technical Manuals 769E 1974 1975
3. United States Navy Chapter Thermal Insulation Bureau of Ships
Technical Manuals 1945 1947 1967 1972
4. Kelleher D. and W. Bartlett Asbestos packing and gaskets Technical
Association of the Pulp and Paper Industry TAPPI Engineering Confer-
ence Quezon City Philippines 1983
5. United States Navy Bureau of Ships Series of Plans 3902 circa
1942-1943
6. United States Navy Bureau of Ships Basic Set of Hull Machinery & Electrical Plans 3902 1943
7. Plisko M Asbestos Materials Summary for Fletcher Destroyer
Baltimore Environmental Profiles Inc. 2002. pp 1-4
8. Fleischer W.E. F.J. Viles R.L. Gade and P. Drinker A health survey
of pipe covering operations in constructing naval vessels J Ind Hyg
Toxicol 9-16 1946
9. Occupational Safety and Health Administration Title Labor
Chapter XVII Part Occupational Safety and Health Standards
Standard for Exposure to Asbestos Dust 37FR 11318-11322 1972
10. National Emission Standards for Hazardous Air Pollutants Asbestos
NESHAP Revision Code ofFederal Regulations Title 40 Part 61. 1990
Volume 55 No. 24
11. Mangold C.A. R.R. Beckett and D.J. Bessmer Asbestos Exposure
and Ship Souy nd Naa val r Shipd yard 13NDNAVY SHIPYDBREM
P6260.1 11
7W0ashington D.C Department of the Navy 1970
12. Mangold C.A. R.R. Beckett and D.J. Bessmer Asbestos Exposure
and Pulmonary ray Changes to Pipe Coverers and Insulators at Puget
Sound Naval Shipyard Presented at the American Industrial Hygiene
Association Meeting at Richland Washington 1968
13. Selikoff I. and D. Lee Table 20-1 In Asbestos and Disease D. Lee E.
Hewson and D. Okun eds p 466. New York Academic Press 1978
14. Lindell K Biological effects of asbestos In Biological Effects of
Asbestos Proceedings of a Working Conference held at the International
Agency for Research on Cancer P. Bogovski J. C. Gilson V. Timbrell
and J. C. Wagner eds Lyon France International Agency for Research
on Cancer IARC 1973. pp 323
328
15. Balzer J.L. and W.C. Cooper The work environment of insulating
workers Am Ind Hyg Assoc J. 222
2217968
16. Murphy R.L. Jr. B.G. Ferris Jr. W.A. Burgess J. Worcester and
E.A. Gaensler Effects of low concentrations of asbestos Clinical
environmental radiologic and epidemiologic observations in shipyard
pipe coverers and controls N. Engl J. Med 1271
12718971
17. Liukonen L.R. K.R. Still and R.R. Beckett Asbestos Exposine from
Gasket Operations Bremerton Wash Naval Regional Medical Center
Occupational & Environmental Health Service 1978 18 D'Agostino R.B. Belanger A. and R.B. D'Agostino Jr A suggestion
for using powerful and informative tests of normality Am Statistician
316321 1990
Journal of Occupational and Environmental Hygiene
February 2006
97
19. Cheng R.T. and H.J. McDermott Exposure to asbestos from asbestos
gaskets Appl Occup Environ Hyg 588 5911991
20. Spencer J.W Exposure assessment An Evaluation of the Actual
Contribution of Airborne Asbestos Fibers from the Removal and Instal-
lation of Gaskets and Packing Material Project No. 8489. Baltimore
Environmental Profiles Inc. 1998
21 Spencer J.W Exposure Assessment An Evaluation of the Actual
Contribution of Airborne Asbestos Fibersfrom the Fabrication ofGaskets
Project No. 8500. Baltimore Environmental Profiles Inc. 1998
22. Spence S.K. and P.S. Rocchi Exposure to asbestos fibers during gasket
removal Ann Occup Hyg 583
5818996
23. Longo W.E. W.B. Egeland R.L. Hatfield and L.R. Newton Fiber
release during the removal of containing gaskets A work practice
simulation Appl Occup Environ Hyg 55
622002
24. Millette J.R. and M.D. Mount A study determining asbestos fiber release during the removal of valve packing Appl Occup Environ Hyg
790
7913993
25. McKinnery W.N. and R.W. Moore Evaluation of airborne asbestos
fiber levels during removal and installation of valve gaskets and packing
Am Ind Hyg Assoc J. 531-532 1992
26. Fowler D.P Exposures to asbestos arising from bandsawing gasket
material Appl Occup Environ Hyg 15.404 4028 000
27. Boelter F.W. G.N. Crawford and D.M. Podraza Airborne fiber
exposure assessment of dry containing gaskets and packings
found in intact industrial and maritime fittings Am Ind Hyg Assoc J
732
7420002
28. Boelter F. G. Crawford and D.M. Podraza Airborne fiber exposure
assessment of dry containing gaskets and packings found in
intact industrial and maritime fittings Authors reply Am Ind Hyg
Assoc J. 595 2003
29. Nicholson W.J. D.A. Holaday and H. Heimann Direct and indirect
occupational exposure to insulation dusts in United States shipyards
In Safety and Health in Shipbuilding and Ship Repairing Geneva
International Labor Office ILO 1972. pp 37-47