Document ByGd4Qbq88g6bRvD2KabR0ka4
*} PATTERSON REDUCTION PLANT ASBESTOS SAMPLING STUDY July 10, 1979
SAMPLE NUMBER & DESCRIPTION
A6019-32 Wingfield, J.W. Pipefitter (removing vet asbestos from pipe and storage tank), 8:45A-9:00A
A6019-34 Wingfield, J.W. Pipefitter (picking up asbestos from floor), 9:01A-9:26A
A6019-36 Wingfield, J.W. Pipefitter (removing asbestos insulation from tank), 9:55A-10:25A
A6019-33 Francis, B. Pipefitter Apprentice (removing vet asbestos from pipe and storage tank), 8:45A-9:00A
A6019-35 'Francis, B. Pipefitter Apprentice (picking up asbestos from floor), 9:01A-9:26A
A6019-37 Francis, B. Pipefitter Apprentice (removing asbestos insulation from tank), 9:55A-10:25A
A6019-40 Franklin, T. Welder (cutting tank loose from supports) U:10A-11:35A
ASBESTOS CONCENTRATION
(fibers/cc) 26.41
4.79
0.79
20.74
2.82
0.80
9.40
ASBESTOS CONCENTRATION (fibers/cc)-TWA*
> 1.12
> 0.84
0.48
*0SHA standard for Asbestos fibers is 2.0 fibers/cc, 8-hr. time-weighted average. Ceiling value not to exceed 10 fibers/cc over any 15 minute period.
TX TINER RMC0004593
DRAFT SUGGESTED NOTIFICATION
1979-09-17
TO:
Dear Mr..
:
As you may remember, on July 10, 1979, you wore an Industrial Hygiene sampler, to determine your exposure to asbestos while removing insulation from a water storage tank in the rectifier station.
Results indicate compliance with the OSHA 8-hour standard for asbestos; however, a single short-term sample (15-minute) was in excess of the permissible ceiling level.
You were provided with the appropriate personal protective equip ment to reduce your exposure to vitbin permissible guidelines. A written asbestos removal and repair procedure has been established in order to minimize your exposure to asbestos.
If you have any questions regarding this notification, please advise.
Signature r
TX TINER RMC0004594