MINUTES
of the
GOVERNMENT TECHNICAL It RESEARCH COMMITTEE MEETING
Afternoon Joint Session
Washington, 0. C.
May 21, 1963
In addition to those attending the morning Marine and Land Sessions, the following were present:
John M. Dorsey D, . McDaniel R, C, Hale S. A, Heider
U. S. Coast Guard U. S. Coast Guard U. S. Coast Guard Federal Housing Admin.
The meeting was called to order by V/, E. Miller
ECONOMIC THICKNESS (LOW TEMPERATURE STUDY)
C. E. Ernst reported that the Low Temperature Study for a companion volume to the Manual of Economic Thickness of Insulation on Surfaces at Elevated Temperatures, has been completed; the calculations made and the volume prepared in a preliminary form which he displayed. He discussed briefly the data and the calculations necessitated by the temperature range covered.
As in the other manual, for a specific case the installed cost of insulation and other fixed and operating costs are combined in a single "D" factor from which economic thickness is derived using pipe sise, thermal conductivity and the difference between operating and ambient temperatures.
For low temperatures, the insulation thickness required to prevent condense* tion is usually important and may be a governing factor, where it is greater
the economic thickness. It was not found feasible to combine tables showlag both thicknesses, but Instructions and eharts for the thicknesses to prevent condensation will be available along with the book.
It is anticipated that the book may be available in the next three or four months.
FEDERAL SPECIFICATION HH-I-551c "Insulation Block, Pipe Covering and Boards, Thermal (Cellular Glass)" - Issued March 5, 1963
Discussion was led by V, L. Miller, who explained that although the Interim Specification HH-I-0055 lb was Issued over a year ago and most of the questions resolved, the present Revision "C" still contained some points for discussion and resolution.
1
I _
2
Particular attention waa called to Paragraph 3. 13 Fire Hazard Classification which applies to all classes in Types Q and IXL The manufacturer has pointed out that Type Q Class 3 material has the glass fabric applied with'hot asphalt. For its major use (underground lines), this is an advantage and no hazard whatever. However, it probably could not be said to conform to paragraph 3. 13 although the test method UL 723 cannot be applied directly to pipe insula tion sections.
It was agreed that positive solution would involve re-writing 3, 13 to delete reference to Types and Q1 and limit it to Class 2 and 4 of Type Q with a statement that Class 4 be used when the fire haaard values were required in the job specification.
FIR TESTS (INCOMBUSTIBLE INSULATIONS)
1. Definitions - Mr. King stated the desireability of agreement on a definition of non-combustibility and cited the NFPA definition in Standard #220 a a poesible form.
2. Basic Requirements - Mr. Hale of the Coast Guard discussed the 'heated tube" method as the basis of their definition and stated that for marine construction, particularly for passenger vessels, their requirements must conform to certain international agreements. The basic principle involved is that the ship design shall be such that a fire starting in a given area (of limited size) shall be contained within that area and not spread to others.
3. The FHA representative stated their interest in duct systems utilized for heating. There ie current test work on evaluation of fire tests on both circular and rectangular forme with results indicating little correlation with other Fire Haaard Teet methods.
The meeting was adjourned about 3:15 F.M.
K. M. Ritchie
t
MINUTES
oi the
GOVERNMENT TECHNICAL Sc RESEARCH COMMITTEE MEETING
Land Session
NATIONAL INSULATION MANUFACTURERS ASSOCIATION
Washington, D. C.
May 21, 1963
The meeting was called to order by W, E, Miller, the Washington Chairman of the NIMA Committee, who appointed K. M, Ritchie as Chairman protem for this session with the following in attendance:
Shigeki Kiratsuka
A. L. Graul J. S. King R. J. Felix L. H. Mills F. A. Govan W. E. Miller K. M. Ritchie P. L. Losse C. E. Ernst Walter Gubar J. F. Lynch R. L. Strickland V. L. Miller W. T. Irwin
Office, Chief of Engineers, Dept, of Army
Bureau of Yards It Docks U. S. Veterans Administration Eng. Div. H.Q., U. S. Air Force Public Bldgs. Service - GSA National Academy of Science - BRAS Pittsburgh Corning Corp, Baldwin-Ehr et-Hill, Inc. The Eagle-Picher Company Johns-Manville Sales Corp. Gustia-Bacon Mfg. Company Johns-Manville Sales Corp. Gustin-Bacon Mfg. Company Pittsburgh Corning Corp. Pittsburgh Plate Glass Co,
L "Thermal Insulation for Mechanical Systems" Section 692 of Mechanical Specifications prepared by the Veterans Administration. Mr. J, S. King supplied copies at the latest revision of this for comment.
He noted that because of its importance in hospital construction, the Fire Resistance, and particularly Smoke Development Requirements at insulation was given a prominent place. Many of the details of application and finishing conformed to the Washington Cont rectors' Association "Specification for Non-Conducting Covering."
Comparison of the thiekness specified for pipe insulation with those in the new BRAB Report #45 to the Federal Construction -Council (see Subject HI) showed some differences which can be eliminated if K-factor is taken into account.
Mr. King requested suggestions for improvement of the draft circulated.
Q. Proposed Revision - Federal Specification HH-I-523A 'Insulation Block, Pipe Insulation, Thermal Calcium Silicate (For temperatures up to 1200 ~). " Points discussed.
1. Elimination of calcium silicate cement was agreed to, but raised the question of fitting insulation. It was pointed out that other cements are available for this purpose.
2. The government people expressed a preference for fabricated fitting covers and inquired as to availability. It was reported that such covers can usually be fabricated by contractors, although availability and economics may vary appreciably in different areas of the country. Manufacturers of calcium silicate pipe insulation do not offer fabricated covers tea standard .'tern, although at least one offers pre-cut pieces for on-the-job assembly.
3. Inclusion of classes based on surface coverings, was favored in principle by the government representatives.
Discussion of the listing and specifying the various jackets, indicated a need for a separate "jacket" specification which might be referenced in the various material specifications for the specific jackets needed. This would include all pertinent properties and specifications.
3. For the proposed HH-I-523 revision in the meantime the list of jackets in the current draft needs review and some amplification.
A. L. Graul requested that Section 6 on intended use, be expanded with information on specific uscc o: jackets; e, g., for indoor and outdoot use, fire protection, vapor-barrier protection, etc,
4. Paragraph 3.1.2 on "Cement" is to be deleted.
5. Physical Requirements - Table I
F. Govan and A. L. Graul stated that the maximum values for density and thermal conductivity were unnecessarily high, in view of data re cently assembled from manufacturers. It was pointed out that the values were limits, and not design or avsrage performance values. Thsse valuss art to be reviewed by N1MA. A similar qusstion as to the maxi mum allowable linear shrinkage (2%) is also to be reviewed.
6. The minimum weight of canvas (1.8 os.) for Class 2 was questioned. This should be reviewed by NIMA, along with Class I, since this weight of canvas serves little or no purpose after installation and is often covered with other material.
3
7, Paragraph 3. 3. 4 on Bands, It was requested that this be expanded to include aluminum and stainless steel bands, in addition to steel, and Section 6 should explain their choice.
8, Fire Hazard Classification Test, It was pointed out that available methods can be used only on flat specimens and not on jacketed pipe insulation sections, and that test results on components cannot be translated directly into results on assemblies.
It was requested that ASTM E-84 be referenced instead of UL 723, although there are differences in procedure which may affect results an specific materials.
This whole subject should be reviewed further by NIMA and a recom mendation made.
XX1. Perforamence Characteristics of Thermal Insulating Materials. F. A. Coven was requested to report an this BRAB assignment from the Federal Construction Council. He stated that they had prepared and sent to interested Federal Agnecies a sheet listing 26 materials with trade names and properties. Owing to legal complexities, this list will not be available to industry.
However, the BRAB Report #45 has been issued as "Thickness Charts and Material Characteristics for Pipe Insulations" and is available from the
Publishing Office, National Academy of Science 2101 Constitution Avenue, Washington 25, D. C, Publication # 1084 - $2.00 per copy
This contains thicknesses for various pipe temperatures based on "economic thickness" adapted to the specialised cost considerations existing in govern ment installations, ft also lists eight significant characteristics of materials selected from a list of 40 or more, as follows:
Thermal Conductivity Density Compressive Strength Flexural Strength
Thermal Shrinkage Temperature Range Combustibility Compatibility (with finishes etc.)
Mr. Covan requested NIMA comment on the choice of data and material in Report #45.
XV, Proposed Revision - Federal Specification HH-I-500a "Insulating Cements"
Due to lack of time, this was not discussed fully, ft was stated the omission of physical property tables, instead of which ASTM material specifications were referenced, gave insufficient Information for selecting a particular type. A further review and recommendation should be made by NIMA.
4
The meeting was adjourned for lunch to meet afterwards in joint session with the Marina group.
K. M. Ritchie
MINUTES
oi the
GOVERNMENT TECHNICAL It RESEARCH COMMITTEE MEETING
Marine Session
NATIONAL INSULATION MANUFACTURERS ASSOCIATION
Washington, O. C.
May 21, 1963
The meeting was called to order by Bert Tower with the following in attendance:
C. J. Hendrickson W. F. Sinclair Ray Foote John Ford Harold Browning V. L, Miller A, L. Munkre* A. E, Kincaid J, H. Chilcote Bert Tower John Sams
M. H. Oetrick Company Pittsburgh Corning Corp. Maritime Commission Coast Guard Bureau of Ships - Code 709 Pittsburgh Corning Corp. Bureau of Ships - Code 648 Owens-Corning Fiberglas Corp, Bureau of Ships - Code 634C4 Johns-Manville Sales Corp, Gustin-Bacon Mfg. Company
Maritime Basic Specifications For Cargo Ship Construction - Final Draft 2/27/63, Revised Draft 3/15/63 - Section 75 - Discussed as follows: with possible revisions as shown -
NOTE: Comments by those identified otherwise consider as general consensus.
R. Foot#: Specification with possible changes will be used by design agents as a guide for cargo vessels which might include say 12 pass engers or so and exclusive of tankers. Any requirements in excess of these specifications will be paid by owners Maritime subsidises 50 - 55% for Construction only
Carl Cooney wrote these specifications after reviewing all previous and present specifications and also endeavored to project ahead.
The Maritime Commission requests from NIMA and from the individual manufacturers (with copies to NIMA) their comments. These comments should include full explanations
2
and reasoning. Comments without full clarificat ion will not assist the Maritime Commission in evaluation - for the Maritime expects some 5000 comments.
The deadline data for replies is June 9, 1963. It is suggested that the manufacturers respond as soon as possible and that
Jack Barnhart WTite the Maritime Commission requesting an extension of time for NIMA and the manufacturers to reply. The following is the direction of the responses:
U. S, Department of Commerce Maritime Commission Attn: L. C, Hoffman
Chief Division of Engineering Office of Ship Construction Washington 25, D. C.
Show on Subject Matter in Letter "Basic Specifications for Cargo Ship
Construction - Section 75"
It is further suggested that Jack Barnhart also mention in his letter to the Maritime Commission that NIMA anticipated the presence of Maritime personnel to discuss Section 12 Basic Specifications, Air Conditioning, Heating and Ventilation. That it was to Government and Industry regret that no one was present from Maritime to discuss this important specifi* cation.
RE: SECTION 75
Par. 1 line 10 line 11 line 26 line 33 line 35
Delete word "Insulation" Change to read surface temperature of pipe may vary Comments requested on temperatures Delete word "Diesel" and change to "Engine" Delete word "Diesel"( and change to "Engine"
Par. 2 - It was suggested that lines 9, 10 and 11 be rewritten
NOTE: Maritime thickness generally thicker than Navy.
The 125 temperature referred to is the temperature of the pipe, not the lagging.
Par. 2 line 28 Comments requested line 35 Delete "or Fibrous Glass" line 36 Clarify 350 F - question 370F?
0
3
Par. 2 Fife 3 line 5 Delete "or Fibrous Glass" Page 3 line 6 Clarify 999 F Temp - two types
NOTE: It was suggested that Federal Specifications be used whenever possible in lieu of Military Specs. Question if there should be a new Seetian for 1000 or above.
Par. 4 Insulating Cements - Comments requested
NOTE: HH-1-00500 is being revised - Comments regarding including in this rpee.
Pax. 4 Maritime is endeavoring to develop costs an piping on a R lc D project. It was stated the economic thickness manual only refers to flat surfaces.
Par. 4 - Table A - line 12 Consider inserting Fibrous Glass - All manufacturers are requested to review and comment on thickness and sizes.
The Table A Note should also pertain to Table A-l
Par. 7 - Table B - line 24 & 25 Suggest rewrite to Include 857a magnesia and to also include "in accordance with manufact urers recommendations" deleting "as approved"
Par. 8 line 8 It was suggested that this cover single and double layer expansions. Clarification is requested as to what constitutes an "approved expansion joint"
Par. 8 Clarify where single and where double used.
Par. IS Lagging - line 8 Suggest Include the one coat type of Insulating It Finishing Cement.
75-12 Table D A review of this Table is requested as it was felt it was not consistant.
NOTE: Metal lagging is not being used in practically all areas
Re: Section 12 - It is requested that a future meeting be arranged by the Chairman possibly the later part ai June and to write John Brackett c Maritime.
Comments are requested on 1) Heated Tube Test, 2) What is a Fire Test and 3) Should the test be for materials applied?
4
The morning was primarily spent discussing Section 75, There was little time to Discuss Section 12.
In conclusion was desire to remind the members that they are to respond to the Maritime directly re Section 75, sending copy to NIMA.
Respectfully submitted