Document By5Md1Dvb351RLMZEejrgVV74

Johns-Manville Internal Correspondence To: L. I. Richards From: R. W. Campbell Date: HOV * i 137} Copies: V. J. Marzoli, D. E. Hillier, K. J. Whalen, M. G. Sivetts, E. R. Brady, File/Chrono Subject: A.R. 206-CR-926 $22,300 PVC MIXER DUST COLLECTOR - DENISON Please cancel subject appropriation. Upon further investigation, it was found that the present dust collector system on. the Denison PVC mixer has sufficient capacity and returns collected material to the mixer. The present efficiency is such that the new mixer would not provide enough added improvement to justify the cost. pe wi , Uiv. General Manager Wa.. AC.. SReoull's?h'/DCen.Gi . u* Dir. PrnlirPl.in t. Hiiiier -T, 'HAC- c* A. Cif. Pit. Eng, V. J. Marzoli 3-02 7, V.P. Pur." Cng. Serv. Ww.. LL.. Gregory 3a^ROPRIATION REQUEST date Prepared: --9/15/77 2-11 No. ^ LOCATION DENISON DIVISION IPPM DEP'T NAME PVC n2fi-CR-.fl.2-6-- DEPT NO. q50 TITLE: MIXER DUST COLLECTOR__________________ PURPOSE: To install a separate dust collector for the PVC mixer so as to recover, directly back to the mixer, raw material fines presently being lost in the plant dust collector. PRESENT FACILITIES: Duct work connections to the plant central dust collector (PVC shop) along with connections from the extruders, saws, etc. PROPOSED FACILITIES: It is proposed to install a Pulsaire type separate dust collector over the mixer which will dump the fines collected into the cold-mixer. Signal to dump from the hot mixer discharge into the cold mixer. ESTIMATED COST: ' Capital - Item Cost Dust Collector-Duct Work $ 17,000 Installed Freight 800 Engineering 2,000 Contingency 1,700 TOTAL CAPITAL $ 21,500 Expense - Taxes TOTAL COST 800 $22,300 Life Account 20 2420 Systems 1112 3A-1 50 t,w SAVINGS OR BENEFITS: Based on savings from Stockton installation a minimum annual-savings of $8,161 - See T. Lohman's letter of 9/1/77, copy attached. REMARKS: 1. Cost estimate based on contractor installation. 2. This project has negligible environmental impact. Capital' comm. 1 2 3 4 21,500 - - Capital spend - 21,500 0 Yes 0 No. Meet reqmts. of P 331-1, 331-2, 332-1? 0 Yes O No. On xtllic. cap. projects list? P 331-3 - Yes Q No. RETIREMENT PROPOSAL attached? A.,npH in GPED TiTM ---------------- IP,. Coordinator H. a 1 h- f3"4 months T. Brode ., $ 2 2 , J 0 0 Approval aiitnnrirn' ovprrf rtf . 0 Yes 0 No BUDGET ADDITION requested for expense portion? M.ijnr arclg. elnssif Initials Amount FINANCIAL ANALYSIS/CERTIRICATION: , % Return DCF <r? Rv ^. / 1 1 Yes (P^No, Analysis attarhprl? Date <Y/*^// ? 7 0 Yes O No. Corp. Finance OK? Onoi amenable to FA REFER TO SYSTEMS 3419 FOR REQUIRED APPROVAL LEVEL title INITIAL DATE TITLE 1 UUO. lO^UUNII JUUU'V, VstU t -EO-V-.P-.-F4NT-&-AOMr-4S?0eMI--------------- -- -- DIV. GEN. MGR. (s40M) -SR-.-VrPr-PR0Or-ai-EWr-($lU.DM)------------ DIV. PROD. MGR. 1$ bM) -- ___________ RES. DIR. t$5M) DIR. GEN. SERV (S5Ml SRr-v.rv j^M-eofiP.-(R7-5M-)- -- PLT. or MINE MGR. ($2. 5M) INITIAL DATE w fo/7/7/ ' Form AR-1 (2/751 NOTF- Strike nut thm. that rin nnf have to annrnve. Johns-Manville In^rnal Correspondence To: From: Copies: J. O'Connor U T. Lohman u MM Date: September 1, 1977 F. Love, G.C. Eggleston , R. Andrews Subject: DUST COLLECTOR FOR PVC MIXERS Based on T. Duechers letter of 8-/2/77 I analyzed Cost/Saving of this project at each of the PVC locations. PLANT SAVINGS INSTALLATION . COST GROSS % Butner Denison Franklin Green Cove Jackson McNary Pueblo Wilton 4,357 8,161 . 10,059 14,895 4,787 7,078 6,251 5,449 20,000 20,000 20,000 23,000 20,000 20,000 20,000 20,000 22% * 41% 50% 65% ^ * 24% 35% 31% 27% The savings are based on 1978 estimated material cost and the actual pounds per batch saved at Stockton. The installation cost was estimated by R. Campbell. Based on yields of 40% , 31% and 25% the dust collector should be installed at Green Cove, Franklin and Denison. If a slightly less expensive system could be developed ($jL5,000), the project would be cost justified at Pueblo and McNary. The main consideration at Green Cove would be the two mixers and the necessity of dumping the dust into the sewer formula if both formulas are being mixed. TL/pm