R. W. KNAPP MASSENA OPERATIONS
ojS.VA'-
CONFIDENTIAL
MR. R. C. HINKLE BADIN WORKS
June 20, 1973
RE: OSHA ASBESTOS COMPLIANCE QUESTIONNAIRE - MASSENA OPERATIONS
Since submission of information on your asbestos questionnaire (our reply dated 4/13/73), Dr. M. J. Elder has reviewed and examined twenty-six (26) of our previously exposed carpenters and masons and has found no asbestos associated problems.
R. W. KNAPP RWKrbl Cc: Dr. P. R. Atkins/Mr. T. B- Bonney - Pittsburgh
Dr. M. 0. Colwell/Dr. W. N. Dawson - Pittsburgh
MAS004 0129
Jopy
10
FROM R. C. HINKLE
BADIN WORKS
J c.p*
TO MR. R. W. KNAPP MASSENA OPERATIONS
May 29, 1973
V, f/J"
Ut 1 ktr
//. ~ . y-'~ p
U &arY 6
P /Yfc/aufkl"
OSHA ASBESTOS COMPLIANCE QUESTIONNAIRE
ft
The captioned questionnaire was sent on March 30 to the thirteen locations
1 (P shbu
^which had Smelting and/or Ingot operations; replies have now been received
1
Qfrom all. Replies from the five "Ingot only" locations have been forwarded
to Mr. J. A. Dunbar in Pittsburgh. Copies of the remainder are herewith
_. L
forwarded to him.
. Q> ''tJa
/?
Mr. G. R. Swany and I have reviewed the replies from the eight joint Smelting-
*
Ingot locations, and a brief summary is being made. In general, the plants tp p^otilA
appear to be aware of the detailed requirements of the OSGA regulations, and V - '*/'
are working toward compliance with them. Table I summarizes the Industrial C.C's01
Hygiene and Medical section responses. Mr. T. B. Bonney and Dr. K. M. Dawson
are receiving copies of the Industrial and Medical sections of the completed
questionnaires, and it is assumed that they will take any action which appears
to be appropriate in their areas of responsibility. The initial sampling
surveys are still under way at Badin, Rockdale, Tennessee and Warrick; these
plants are hereby requested to report to me their status as of July 31, 1973.
Massena alone has decided that no dust--count surveys are needed, on the basis
of their elimination of fabrication of non-locked-in asbestos products. (Marinite
shapes are purchased).
The third section of the questionnaire dealt with compliance, materials, and . operations. Copies of the replies to this section are herewith forwarded to Mr. V. M. Rieke of Environmental Engineering. Table II is a compilation of the operations and materials which the eight plants considered to be of concern. Every plant is asked to examine the list, to see whether there is a material or operation which has been overlooked locally. No one mentioned the potentially hazardous maintenance of dust collectors and ducting which handle asbestos. Bag changing and other work might easily expose workers to conditions outside the ceiling concentration (10 fibers), so the operation should be sampled, and proper precautions taken.
Wenatchee, Vancouver, Tennessee, Rockdale, Massena, and Badin should examine
their procedures for removing and disposing of potlining insulation and other
installations containing asbestos-bearing Hi--Temp or Superex. Only sampling
can determine whether the exposure limits are being exceeded. The requirements
of paragraph "(h)(2) Waste disposal" should be examined for application to the
local situation.
'
Vernon Works very kindly enclosed some asbestos control measure information which had been provided by the Seattle Area Office of OSHA. A copy is attached. Mr. Bonney comments that while the dust-count information may be a useful guideline, variations in plant procedures' make actual local dust counts necessary.
R. C. HINKLE
"'RCH:bpc
j _COA.
tr-49ca (**v
MAS004 0130
May 29 1973 Page 2
cc:
E. M. Morgan - Badin Works
R. W. Knapp - Massena Operations
A. A- Rambikur - Pc. Comfort Operations
E. B. Parker - Rockdale Works
.
G. W. Anderson - Tennessee Operations
P. F. Woodward -- Vancouver Operations
R. L. Parsons - Warrick Operations
J. E. Owen -- Wenatchee Works
M. 0. Colwell -- Pittsburgh (29)
L. V. Cralley/P. R. Atkins - Pittsburgh (7)
V. W. Rieke/R. C. Cook - Pittsburgh (2)
W. N. Dawson - Pittsburgh (7)
M. J. Caprio - Pittsburgh (19)
R. W. Wrena/J. A. Dunbar - Pittsburgh (23)
S. A. Jones/G. R. Swany - Pittsburgh (23)
J. Z. Nelson/A. J. Sartschev - Oliver Plaza (7)
R* P. Carter/T. B. Bonney - Pittsburgh (7)
MAS004 0131
TABLE X
brief summary. the status of the Industrial and Medical sections, as f April 1973, is given below:
PLANT
Badin Massena Pt. Comfort Rockdale Tennessee Vancouver Warrick Wenatchee
INITIAL SAMPLING
Under way None Complete Under way Under way Complete Under way Complete
AREAS FOUND EXCEEDING LIMITS
None yet 0 None yet Three 0 None yet 0
INITIAL ASBESTOS MEDICAL EXAMINATION
Complete f(/,, .a
None -
-Vr 'f
Complete L '
ofc51""'''
None
1
s
Under way Getting set up Complete Under way
TABLE II
A compilation of the operations which the eight plants considered to be of concern, as of April, 1973;
MATERIAL
OPERATIONS
Marinite Asbestos Millboard
Sawing, drilling, routing, sanding Work area clean-up Movement to and from Stores Dismantling and disposal after use Properzi spouts
S awing, staaping
Superex, Hi-Temp
Chicago Firebrick Co. Super-insulation cement JM 352 (Asbestos Shorts)
JM No. 19 Cement
Removal of insulation from various installations: Potlinings, carbon baking furnaces, crucibles, metal filters
Insulate mixers and Tar pumps, Dough-balls for plugging furnace tap holes, Removal and disposal of used material
Trough lining and removal of material Insulation of steam pipe elbows Joint between furnace sidewalls & roofs
Trough lining & removal
Eagle Pitcher PV Block
Furnace Door insulation: install, remove, dispose
MASG04 0132
ASBESTOS HAZARD CONTROL - GENERAL
CHANGING WORK PRACTICES IS A SIMPLE, ECONOMICAL, AND PRACTICAL APPROACH TO CONTROL OF ASBESTOS DUST PRODUCTION
Some recommended practices are:
1. Use plastic waste bags for collection, transportation, and waste disposal of asbestos refuse.
2. Use a portable industrial vacuum cleaner for pick-up of asbestos waste and dust at the work site.
3. Use plastic impregnated paper coveralls and dust respirators for dusty operations of an incidental nature. The coveralls are throw-away and eliminate processing and cleaning. .
4. Use down-draft ventilated portable work tables for precutting and assembly at asbestos materials at remote locations, mobile situations or Inside ships.
5. Precut all block insulation in shops under ventilated condition and then
deliver it to location.
.
6. Package pre-cut block insulation in plastic and add water to contain dust, maintain integrity of gores, indetification, and ease of handling.
7. Reduce airborne asbestos dust 50 to 60% by prewetting the materials before handling.
8. Mix asbestos cement (15%) at remote locations under ventilated conditions. Mix small batches in plastic bags.
9. Spread plastic or canvasdrop cloths at work site to contain and facilitate
clean-up.
.
10. Conduct modular assembly of asbestos materials on piping prior to installation.
MAS004 0133
XI. Consider disposable forms of respiratory protection for onetime or intermittent use situations. (U.S. Bureau of mines Approved.)
12. Substitute non-asbestos products whenever suitable, acceptable and feasible.
13. Use enclosures to limit the spread of dust from unit operations.
14. Separate clean-up areas for workmen.
15. Limit exposure of other trades in the vicinity of asbestos work.
16. Develop asbestos work stations, either portable or stationary, to control dust production.
17. Develop suitable storage and storing areas.
Some practices that produce high asbestos dust levels: and SHOULD be prohibited!
1. Do not clean up fallen asbestos debris with brooms or brushes.
^
2. Do not allow debris to be thrown from staging or from one deck to another.
3. Do not shake coveralls or drop cloths. 4. Do not remove respirators before asbestos dust laden clothing.
5. Do not clean dusty clothes with an air gun.
6. Do not vent asbestos dust picked up by ventilation into adjoining work areas, or ships compartments.
7. Do not wear respirators covered with asbestos dust.
8. Do not wear street clothes to handle asbestos materials or under known dus ty conditions.
9. Do not use asbestos for welders pads.
10. Do not allow uncontrolled cutting, ripping, sawing, or bracking of asbestos in small enclosed spaces.
MAS004 0134
PREDICTED ASBESTOS DUST CONCENTRATIONS
(Taken From Actual Measurements of Industrial Operations)
Type of Work
Present
Fibers/ml
1. Mixing & Applying Cement and Cloth to Insulation Material Good Ventilation Poor Ventilation
2.5 4.6
Improved
.5 1.0
Change of Work Practice & Approved Respirator
.05 .10
2. Cutting & Applying Insulation Block or Sections to Piping Good Ventilation Poor Ventilation
2a.Cutting & Materials for Later Use in Cutting Sheds
5.2 11.5
7.6
2.5 5.0
1.5
.30 .50
.20
3. Spraying Turbines or
like Machinery in
partially enclosed Spaces
Spray Operator
67
Hopper Fender
10
4. Asbestos Cloth; Cutting 25-30 Fitting, Glueing & Installing
.7 .1
10
3.0 1.0
.5
5. Magnesia Block Cutting Ventilated
Unventilated
10 100
6. Amoslte Cloth Cutting 5-15
7. Asbestos Cloth Cutting Ripping Cutting
50 10
5 20
5
2 2.
1 5
1
1 1
MAS004 0135
Type of Work
Present
8. Amosite Installation
10-45
or Ships (enclosed Spaces)
Improved 10
Change of Work Practice & Approved Respirator
1
9- Magnesia Block Cutting & Installation Ventilated Unventilated
5 25
2l 51
10.Asbestos Cement Mixing Open
Enclosed Bag
100-200 3
11.Spraying Asbestos Materials (5%) on New Building
68-100
25 1
50
10 1
10
12.Mixing & Charging at Hopper
10-40
10 5
13.Incidental Exposure from Spraying Nozzle 75 Feet away
40-60 75-100
14.Wetting Down of rip-out materials
50-70
15.Rip out of Materiais-dry 16.Brake Shoe Repair Shop
200+ 25
17.Coveralls Covered with. Asbestos Dust
5 (Intermittent)
30
20 100+
10 1
5
5 50
2 >1