PLAINTIFF'S EXHIBIT GF-1693
2'Jtr-
'< A
--.vVW^.vv V- *
RECEIVED
&7?rTvc--.
r<tr- to
|i> tOCx'Om
Mr. W. R. Holt Erl* 16
Ju* 19 197?
itf/CORP. r
0M
I v- lOCA'n*
S. J. Stenpien Corporate Environmental Engineering Linden
SOt.lCT
Slate of Pennsylvania Asbestos Enisslon
DAtl June 14, 1972
Mr. C. F. Hen Mr. T. A. Dent Mr. W. Darrell Mr. H. J. Hoilovay Hr. M. Hrysyxen Mr. P. Weiner Mr. H. >. Johnson
fcv'
With reference to Mr. Darrell's iseeo of June 7, 1 called both Mr. R. Zlnn and Mr. R. E. Scheffer Air Pollution Control Engineers in the Department of Environmental Resources and they wanted to know whether or not your plant is coining any asbestos Into the atnosphere. The State of Pennsylvania la conducting a survey which had to be conpleted by June 9. All of our plants located in Pennsylvania were contacted by the Slate this past week for this sane information. The only asbestos eaission I recall your plant had was froe the scrap grinding operation which 1 advised you on November 5, 1970 that it would be to your benefit if you could eliminate this exhaust by recirculating back to the grinder pickup. Although you reported to the State on `larch 7. 1971 that the exhaust is discharged into a sealed room, the room had a roof vent which allowed asbestos to be emitted into the atmosphere.
in your absence I called Hr. Oarrell and 1 suggested that for the purpose of the State's survey we advise the State that there is no asbestos eaission and to iamwdlately seal off the vent and Install ducts from the room to the grinder pickup. Mr. Darrell agreed to this and 1 informed Scheffer and Zinn on June 9 that the plant does not emit asbestos into the atmosphere.
I would suggest that when the roof vent is sealed that you call Scheffer and Zinn or, if you wish, that 1 call then and arrange a visit to your plant so that they can confirm the Information shown on the forms submitted in March of 1971. This, again, is the procedure that we have followed with our other plants in the State. At the time of the visit we can revise our forms, adding new vents which oay have been installed, such as the new boiler, or deleting any. such as from the scrap grinding operation in question.
The vents over the paper Baking cylinder machine do not have to be listed since the only eaission is moisture laden air and this according to the State's regulation does not have to be reported on the forms.
If we can provide further assistance in this matter, please let us know.
^1
bd S.XrT Stenpien