Document Bv7kYEnD9Q3jxo2GyevkGGOzm

Section Number: Issue Number: Original Date: Revision Date: Title: References: Ethanolamines/Glycol Ethers Tier 3 Procedure 1702 1.5 11-11-91 Author: Ron Pepitone 01-27-98 Use Of Blow Back Pots Glossary For Equipment Identification (Text #114) 1702. Use Of Blow Back Pots 1.0 Objective: 1.1 To safely return residual product from maintenance jobs, sampling, drain outs, etc. Without spillage or damage to the environment. 2.0 Responsibility: 2.1 It is the responsibility of the operations personnel to ensure that this procedure is complied with at all times. 2.2 It is the responsibility of the operations personnel to adhere to this procedure at all times. 3.0 Special Notations: 3.1 Blow back pots are on DV-243A, DV-113, and DV-114. These pots should be blown empty immediately after product is poured in them. 3.2 Be sure you are using: DV-243A for amines, DV-113 for EB and DV-114 for PM products. 4.0 Safety Notations: 4.1 Monogoggles, rubber gloves and block safety equipment are required for this job. 4.2 Prior to starting job check valving to insure that blowback pot is depressured. 5.0 Procedure: 5.1 If funnel valve is closed, slowly open. 5.2 Pour product into pot thru funnel (no more than one 2.5 gallon bucket at a time) 5.3 Close the funnel valve and bleed valve, then slowly open the nitorgen valve to pressure product to tank. Date Printed: April 18, 1998 Printed Copies Of This Document Are Uncontrolled And Not Subject To Update. The Controlled Version Is Maintained In File: amge/BIbkpt.doc Page 1 Of 2 DO A 059402 CONFIDENTIAL 5.4 Once pot is pressured up open inlet valve to crude tank slowly until the pot is empty. Close inlet valve to the crude tank after pot is empty and before blocking in the nitrogen to pot. 5.5 Bleed pressure from pot through pot bleed valve. Insure valve adjacent to crude tank is closed and upstream nitrogen valve is closed. 6.0 Revisions: Revision #1 05-19-93 Yearly Review Revision #2 08-23-94 Reworded Sections 4.2, 5.1, 5.3, 5.4, and 5.5, Revision #3 08-23-94 Deleted Sections 5.6, 5.7, 5.8, and 5.9. Revision #4 12-11-95 Yearly Review Revision #5 01-27-98 Revised 2.1, 2.2 Date Printed: April 18, 1998 Printed Copies Of This Document Are Uncontrolled And Not Subject To Update. The Controlled Version Is Maintained In File: amge/BIbkpt.doc Page 2 Of 2 DO ft 0SO403 CONFIDENTS-