Document Bo9zpxrNY8B8Dq5o9KzKEwML

Performance of Lath and Plaster SGP 0004007 RECOMMENDATIONS FOR PLASTER PERFORMANCE WITH RESPECT TO CRACK RESISTANCE The Gypsum Association has prepared certain recom mendations to provide the designer with information that will permit him to predict ultimate performance of lathing and plastering systems with a much higher degree of accuracy. They are presented as guideposts and are based upon the data acquired from the Asso ciation's recently completed research project, and vol umes of the industry's research and recorded field experience, all as related to crack resistance of plaster. Important though it is, the proper selection of systems and materials must be supported by adequate construc tion details and definitive specifications. The contractor and mechanic must know precisely what is wanted. Further, competent field inspection is highly impor tant to assure the designer of compliance with his intentions as expressed on plans and specifications. These guideposts are not intended to be all inclusive. Nevertheless, the basic design principles that influence performance are quite clear. A knowledge of their rela tive contributions to performance will more accurately reflect the degree of integrity that is expected of the plaster surface. The important design principles and their interrelationship are here enumerated. THE FINISH COAT OF PLASTER As used in combination with various lath and plaster systems, the finish coats of plaster exhibit a wide range of performance. Hence, selection of the finish coat becomes very important. Sand Float Finishes (Keene's cement or gypsum gauging with lime putty and sand) as compared to smooth trowel finishes provide a high factor of safety against cracking. They require a lesser degree of rigid ity and strength in the lath and basecoat plaster, and we recommend the use of such finishes for maximum crack resistance. The description of the basic sand float finishes are found in "Recommended Specifica tions--Gypsum Plastering" published by the Gyp sum Association. Acoustical Plasters and certain texture finishes are known to be highly resistant to cracking and are considered to be equal to sand float finishes in that respect. When vermiculite basecoat plaster is used over metal lath, or over gypsum lath by the two coat method (double-up), the use of sand float finishes or acousti cal plasters should be considered. Smooth Trowel Finishes such as gypsum gauginglime putty or Keene's cement-lime putty require a much higher degree of rigidity and strength in the lath and basecoat plaster for good visual performance. When the use of high strength basecoat plasters is impractical, consideration should be given to the elimination of restraint at the perimeter angles or the selection of a more rigid lath, or both, to the degree that is shown in the accompanying table (P. 4). They help to compensate for the lower strength of some basecoat plasters. The resistance of trowel finishes to cracking, particu larly to check cracking, can be increased by the addi tion of fine aggregate. The use of not less than Vi cubic foot of fine silica sand or perlite to each 100 pounds of gauging plaster or Keene's cement in creases the factor of safety in trowel finishes. The Gypsum Association recommends the fine aggre gate proportioning with gauging plaster or Keene's cement when gypsum-lime putty trowel finishes are applied over lightweight aggregate base coats. THE PLASTER BASE The rigidity of the base to which the plaster is applied is an important factor in crack prevention. Under com parable circumstances a board type of lath usually pro vides a higher degree of resistance to cracking than a flexible lath. Under certain conditions the selection of lath is not critical, but when the design calls for a plaster base coat in the moderate to low range of strengths, a smooth trowel finish or restrained perimeters, the selec tion of the lath often becomes a determining factor in resistance to cracking. The relationship of these vari ables of design, as they affect visual performance, are shown in the accompanying table (P. 4). SGP 0004008 PIASTER PERFORMANCE ! iRECOMMENDATIONS THE PLASTER BASECOAT Under comparable circumstances crack resistance is closely related to the strength of basecoat plasters, the higher ranking basecoat strengths generally providing a higher degree of resistance. The strongest basecoat plaster is gypsum wood-fiber used neat or a gypsum wood-fiber scratch with sanded brown, followed in order by base coats with sand, perlite and vermiculite aggregate, proportioned as indicated below. If good per- PLASTER AGGREGATE PROPORTIONS For the above reasons, the Gypsum Association recom mends the following proportioning of aggregate per 100 formance is to be expected of intermediate or low strength plasters, extreme care must be directed to selec tion of the finish coat and lath, and to the possible need for elimination of restraint at the perimeter angles. Experience and research prove the case for strong base coat plasters where a high degree of surface integrity is to be realized. pounds of gypsum neat plaster regardless of whether it is aggregated on the job site or in the factory. PIASTER BASE GYPSUM LATH Two-coat work fl\ SAND damp-loom PERLITE OR VERMICULITE 1 i .* --' Weight (Ibi) Volume (cu. ft.) 2'A 250 2 Three-coat work --scratch 2 200 brown 3 300 2 2* PLASTER BASE SAND damp-loose PERLITE OR VERMICULITE Volume Weight (cu. ft.) (the.) Volume (cu. ft.) METAL LATH Three-coat work --scratch brown 2 3 200 300 2 2* MASONRY Two- or three-coat 3 300 3 * Where the plaster U V' or more in total thickness the proportions for the brown coat may be increased to 3 cu. ft. NOTE: For three-coot work over gypsum or metal lath the proportions of sanded plaster only may be 1:2)6 for both scratch and brown coats in lieu of above. CEILING PERIMETER CONSTRUCTION Integration of walls and ceilings at the perimeter angles becomes very significant under some circumstances. Differential movement is always a factor, its extent being governed by the building's rigidity and the cli matic changes. The performance of lath and plaster depends upon the extent of such movement and the ability of the wall and ceiling surfaces to move inde pendently without transfer of undue stresses from one to the other, and other factors such as the finish coat, the lathing base and the strength of the plaster. It is believed, however, that restraint in the vertical angles of lath and plaster systems is less significant than in the perimeter angles of ceilings, and that performance in partitions is dependent primarily upon the other factors. We recommend that serious consideration be given to the use of details that will help to eliminate restraint (continuity of lath and plaster) in perimeter ceiling angles where differential movement is anticipated, particularly where trowel finishes are indicated or the rigidity and strength of the lath and base coat are in the moderate to lower range. ! ! I i j j LARGE CEILINGS In addition to perimeter consideration, large unbroken ceiling areas should be divided by relief joints. The maximum recommended distance between such joints is 60 feet with a maximum undivided area of 2400 square feet. GYPSUM ASSOCIATION 3 SGP 0004009 RELATIVE PERFORMANCE OF LATH AND PLASTER SYSTEMS WITH RESPECT TO CRACK RESISTANCE It must be recognized that performance of lath and plaster systems, like many other building constructions, cannot be predicted with complete accuracy. However, it is believed that a more accurate prediction can now be made, and that a knowledgeable and intelligent selection will more nearly provide the required visual characteristics of the plaster surface. To assist the designer in this matter the accompanying table shows the anticipated relative performance of numerous lath and plaster constructions. It has been compiled from research data and the industry's long laboratory and field experience. It is based upon full compliance with the provisions of "Recommended Specifications -- Gypsum Plastering" published by the Gypsum Association. Obviously, plaster performance is affected by several fac tors other than the basic variables considered in these recommendations, such as extreme weather conditions, lack of ventilation, thermal shock, unusual framing, etc. The standard precautions with respect to such factors should always be observed. In compiling the table of Relative Performance, the absence of such unusual conditions is assumed. The table represents the Gypsum Association's best judg ment of the relative resistance to cracking of the prin cipal systems of lathing and plastering. PERFORMANCE EXCELLENT GOOD ACCEPTABLE RESTRAINED CONSTRUCTION LATH BASE GorM PIASTER BASE COAT WF FINISH COAT F GorM sF GorM WF T G PF G sT G2 S F G VF G2 orM P F G2 orM S T G PT G2 orM V F G VT G2 or M P T UNRESTRAINED CEILING CONSTRUCTION M LATH H BASE H GfM PIASTER BASE COAT WF FINISH COAT F 11 G S or P F Hj G orM WF T mG HM ST SF :1 G2 HG S orP V F F jf| M PF if G2 or M S T HG P or V T MM VF H 1 G2 1 G2 orM ..... ........... . . V P F T G--Gypsum Lath - 3 Coat Plastering G2--Gypsum Lath - 2 Coat Plastering M--Metal Lath - 3 Coat Plastering WF--Neat Wood-Fiber Scratch and Gypsum Sanded Brown S--Sanded Plaster P--Perlited Plaster V--Vermiculited Plaster F--Sand Float Finish T--Smooth Trowel Finish NOTE: All proportioning of basecoat and finish coat plaster shall be as recommended herein. All trowel finishes to be aggregated as recommended herein. `TV pc;: M ASSOCIATION N ?!>S icaqo. 111 inois 60606 Form LP 8-63 Printed in U.S.A. SGP 0004010 HOW TO SELECT GYPSUM LATH AND PLASTER SYSTEMS SGP 0004011 Is Easy As 1,2, 3 Keeping posted on the many different lath and plaster systems available today is not an easy job for archi tects and designers. Knowing the performance char acteristics of the wide variety of components is a tough, behind-the-scenes responsibility--and it's time consuming. A new procedure for evaluating and speci fying lath and plaster assemblies has been designed by the Gypsum Association to help architects and designers select the right lath and plaster for every job--quickly and accurately. The procedure clearly defines the relative performance of lath and plaster components for the vital areas of fire resistance, sound control and appearance or crack resistance. Here's how it works: STEP 1: After determining the building code require ments for fire resistance, and the client's sound isola tion needs, the architect or designer refers to the Gypsum Association's Fire Resistance Design Data manual to select the lath and plaster systems which offer the indicated fire protection and sound control. STEP 2: Now, the architect or designer determines the lath and plaster assembly which offers the required resistance to cracking by , referring ,to the Gypsum Association's Performance of. Lath and Plaster Sys- ' ferns manual.' ' .7'' STEP 3: Having determined thecomponents which meet the design criteria for the job,' the final step, preparing the specifications, is simplified by following the Recommended Specifications--Gypsum Plastering V manual. ,7 i . "> '>/ A*' x , Copies of .these three manuals are enclosed. ^StV'> "E* J ,t ,- *` * * 7`<- ^ 's7 '4*'--> r %7.GypsTO^-f t' Association .?;. 7"''ry^.-yY f}- -'p t J FORM NO. LPP-6/64 PRINTED IN U.S.A. 'O' SGP 0004012 W-T7 'r tM Machine Applied Gypsum Plaster n u u iu SCOPE This recommendation covers the application of gypsum basecoat plasters over gypsum, metal or wire fabric lath, and masonry by means of mechanical and pneumatic equipment. PLASTER MIXERS Plaster mixers shall be capable of producing a uni form and homogeneous plaster mix in the required quantities. Plasters mixers shall be kept clean and in good mechanical condition. PLASTER APPLICATION MACHINES No more length of pipe and/or hose from the mixer to the spray nozzle should be used than the conveying equipment will handle without the use of extra retarder or more mixing water than is required to meet the slump test as provided in the section on "Gypsum Plaster Mix Proportions." Plastering machines shall be capable of transporting the specified plaster mix and properly distributing this mix on the plaster base. Plastering machines and accessory equipment shall be kept clean and in good repair at all times. Plastering machines shall be cleaned and hoses washed out at least twice a day. PROTECTION AND CLEANUP All surfaces adjoining plaster areas which may be damaged by plaster shall be thoroughly protected dur ing the application of plaster. The debris caused by the application of machine applied plaster shall be cleaned up immediately after each operation is completed. GYPSUM PLASTER MIX PROPORTIONS Gypsum plaster mixes shall be identical, for each type of plastering, to those specified for gypsum plaster ing as published by the Gypsum Association. Gypsum plaster mixes not covered above shall meet the requirements of applicable building codes. All gypsum plaster and aggregate job batches shall be based on one (100 lb.) bag of plaster or a multiple thereof. Split sack mixes shall not be permitted. All aggregates shall be accurately and uniformly proportioned to the bag or bags of plaster by weight or volumetric measurement. The amount of water added to each batch of plaster shall be that quantity which results in a plaster slump of not more than 4 in., when tested in a 2x4x6 in. cone, or 9 in., when tested in a 4 x 8 x 12 in. cone. Additives which increase the water demand of gypsum mixes shall not be used. SLUMP CONE CONTROL OF PLASTER CONSISTENCY Note: This method of controlling the plaster to water ratio is dependent upon strict adherence to rec ommended aggregate to plaster proportions. The plastering contractor shall furnish at least one slump cone with accessory equipment for each operating plastering machine on the job. Slump cone equipment shall be present on the job site when basecoat plastering begins and shall remain on the site until it is completed. Slump cone equipment shall be available for the use of the building official, inspector, architect or engineer. Slump tests shall be made in either the small or the large cones described above. Slump tests shall be made in the manner described in the section titled "Method of Making Slump Tests." SGP 0004013 AIA FILE NO. 21-A-2 APPARATUS FOR SLUMP TESTS Small slump cone and equipment. a. Material--22 gage galvanized sheet metal. b. Size--6 in. high, 4 in. in diameter at the base, and 2 in. in diameter at the top. c. Base Plate--12 x 12 in. nonabsorbent plane surface. d. Tamping Rod--12 in. length of % in. steel rod rounded at each end. e. Small scoop or margin trowel. f. Rule or tape measure. Large slump cone and equipment. Note: The large slump cone is described more particularly in American Society for Testing and Materials' Designation C143. This is the cone normally used for control of concrete mixes. a. Material--16 gage galvanized sheet metal. b. Size--12 in. high, 8 in. in diameter at the base, and 4 in. in diameter at the top. c. Base Plate--24 x 24 in. nonabsorbent plane surface. d. Tamping Rod--24 in. length of % in. steel rod rounded at each end. e. One pint scoop or cut-off brick laying trowel. f. Rule or tape measure. METHOD OF MAKING SLUMP TESTS Place cone on center of dry base plate located on a level, firm surface. Hold cone tightly against plate. Fill the cone with mortar obtained from the plaster mixer. Puddle mortar while filling to eliminate voids. Screed mortar level with top of cone. Clean off any material spilled onto base plate during filling operation. Slowly and uniformly lift cone straight up from the base plate and carefully place it on the base plate next to the mortar sample. Lift in the same way from test to test. Lay a straight edge or the tamping rod across top of cone, being careful not to disturb or jostle the plate. Measure the slump as the distance in inches between the top of the cone (bottom of straight edge) and the top of the mortar sample. APPLICATION OF GYPSUM PLASTER Plaster shall be applied in the same number of coats and to the same thicknesses as specified for hand plastering. The quality of machine applied plaster shall be equivalent to that of hand applied work. FORM MAGP 8/64 PRINTED IN U.S.A. REPRINTED 2-67 SGP 0004014 \\ COLD WEATHER PLASTERING Past experience shows that plastering during winter months can be troublesome if certain job precautions are overlooked by the builder and plastering contrac tor. To prevent oversights this winter, it is advisable to heed the following recommended job practices. It is known that the condition of basecoat plaster, the preparation of lime putty and the gauging of lime putty is vital to the success of the plastering appli cation. But so are the elements of temperature and ventilation. As stated in the American Standards Specifications ASA A42.1,1955, Gypsum Association's Recommended Specifications -- Gypsum Plastering and A42.4, the following job preparations must be adhered to -- in connection with temperature and ventilation -- to in sure good results. "When the prevailing outdoor tem perature at the building site is less than 55F., a uniform temperature of not less than 55F., and not more than 80 F., shall be continuously maintained in the building for a period1 of not less than: 1. One week prior to the application of plaster. 2. While the plastering is being done. 3. And after the plaster is dry. The heat shall be well distributed in all areas, and deflection or protective screens shall be used to pre vent concentrated or uneven heat on plaster areas near the heat source. Where required, heat shall be fur nished by.2 Ventilation shall be provided to properly dry the3 plaster during and subsequent to its application. In glazed buildings this shall be accomplished by keeping windows open approximately 2 in. at top and bottom (or side-pivoted windows approximately 4 in.) to pro vide air circulation;4 and by use of temporary cir culators or the air conditioning system (in enclosed areas or buildings lacking openings for natural ven tilation) . It must be remembered that any cementitious mix tures, like plaster or concrete, start life with very low strengths, and that their ultimate strengths depend on such factors as time or water content. The early strength of wet plaster is generally insufficient to with stand thermal shocks of even minor intensity. Greater precautions must be taken when the materials are wet than when they are dry. 'To minimize the possibility of plaster cracking due to structural movements caused by thermal changes, the building should be permitted to become adjusted to the uniform temporary heating conditions for at least one week prior to the start of plastering. The name of the party who shall furnish heat shall be inserted here. SA portion of the water used in mixing gypsum plaster is necessary for the chemical reaction which sets and hardens the plaster. The excess amount required for mixing and application must be dried out after set has taken place. *In addition to drying the plaster, free circulation of air is necessary to avoid "sweat-outs," particularly in en closed areas lacking natural ventilation. FORM L-P-6-64 PRINTED IN U.S.A. SGP 0004015 GYPSUM LATH FLOATING ANGLE CONSTRUCTION AND NAILING AND STAPLING RECOMMENDATIONS The "Floating Angle" method of application of gypsum lath was developed to reduce plaster crack ing caused by stress at intersections of framed walls and ceilings. It consists of eliminating the last two nails or staples in all interior angles, (both horizontal and vertical). Conventional nailing or stapling (see other side) of four fasteners per 16" wide piece of lath on each joist or stud should be used on remainder of the ceiling and wall areas, with the ceiling lath applied first. Cornerite with flanges of 2 inches or more shall be attached to the lath only (not to the framing members) in all "floating" angles. AIA FILE NUMBER 20-B-2 See other side for nailing and stapling recommendations. SGP 0004016 NAILING AND STAPLING RECOMMENDATIONS THICKNESS OF LATH AND DESCRIPTION OF FASTENER -NAILS- 3/8" thick lath 13 gage, 1-1/8" long, 19/64" flat head, blued 1/2 " thick lath Same as above except 1-1/4 " long. SPACING 16" wide lath, 4 nails per lath per framing support, spaced 5", and placed not closer than 3/8" from ends or edges. (Note: Some fire resistive constructions require 5 nails per lath per support.) For 24" wide lath, use 5 nails per lath per framing support. Same as above except that where placed on supports 24" on center, 5 nails, spaced at 4" on center per lath per support, shall be used. For 24" wide lath, use 6 nails per lath per support. -STAPLES- 3/8" thick lath Minimum recommended staple: 16 TJ.S. Standard gage flattened galvanized wire, 7/16" wide crown (outside measure), 7/8" long legs with divergent points. 1/2" thick lath Same as above but staples 1" long. Staples shall be driven with the crown par allel to the long dimension of the framing member, using not less than 4 staples per 16" width of lath per framing member and not more than 5" o.c., in such a manner that the crown bears tightly against the lath but does not cut into the face paper. The legs of the staples shall be no less than 3/8" from the ends and edges of the lath. Same as above except that where placed on supports 24" on center, 5 staples, spaced at 4" on center per lath per support, shall be used. For 24" wide lath, use 6 staples per lath per support. { ________________________________________________________ 1 May, 1959 SGP 0004017 Application of GYPSUM PLASTER ON EXTERIOR LOCATIONS APPLICATION OF GYPSUM PLASTER ON EXTERIOR LOCATIONS Gypsum plaster may be used on ceilings of open porches, carports, or walkways, on soffits of eaves, or other exterior areas that are protected from direct exposure to water. MATERIALS AND APPLICATION Materials and application shall be in strict conformance with the applicable requirements of "Recommended Specifications -- Gypsum Plastering," published by the Gypsum Association, and American Standards Asso ciation A42.4. Adequate ventilation shall be provided for the space immediately above such installations. The ratio of the total net free ventilating areas to the area of the ceiling shall be not less than 1/150. Screening shall be not less than 8 mesh per in. Expansion joints shall be provided at a minimum of 20 lineal ft. or 200 sq. ft. of area. Where framing is spaced 24 in. o.c., use 1/2 in. gypsum lath and 1 in. No. 66 galvanized casing bead. Where framing is spaced 16 in. o.c., use 3/8 in. gypsum lath and 7/8 in. No. 66 galvanized casing bead. Insulating gypsum lath may be used. Gypsum basecoat plaster shall be used with sand aggre gate only. Application of basecoat and finish coat plaster shall be done only when the temperature during appli cation and set of the plaster is above freezing. DECORATION After the plaster is dry, paint with two coats of a good quality exterior paint, such as an acrylic paint. FRAME WALL CAR PORT or PORCH Reprinted. September. 1965 SGP 0004018 FORM GPEL 3/6h AIA FILE NO. 21-A-2 (* Recommended Practices for Construction of Ceilings With Gypsum Lath, Metal Lath and Plaster GENERAL For normal job conditions the Gypsum Associa tion recommends that lath and plaster be applied in strict accordance with the following specifications: A42.4 Standard Specifications for Interior Lathing and Furring Gypsum Association's "Recommended Specifications--Gypsum Plastering." These specifications reflect minimum require ments for normal job conditions and are inadequate for abnormal or unusual job conditions, such as: 1. Unventilated attic or plenum space. 2. Insulation supported by the lath prior to plastering. 3. Lath supported by edge clips only under high humidity conditions. 4. The wetting of gypsum lath before plaster ing or wetting the scratch coat over metal lath. 5. The use of excessive water in the plaster mix. 6. Excessive aggregate proportioning in the plaster mix. 7. Thin basecoat plasters. 8. The use of water in darbying plaster. 9. Slow setting plaster. 1 o. Application of acoustical plaster to wet basecoat plaster. For these unusual conditions the Gypsum Associ ation recommends that the minimum requirements of these specifications be supplemented by the fol lowing procedures: VENTILATION The space above the ceiling shall be ventilated so that the ratio of total net free ventilating area to the area of the ceiling shall not be less than 1 to 150. Location of vents shall provide positive ventir^lating action. If ventilation does not meet this requirement, plaster shall be applied by the threecoat method. INSULATION Where insulating batts, blankets, blown wool, or fill insulation is installed over the gypsum lath prior to the application of the basecoat plaster, the mois ture evaporating from the plaster may condense within the insulation or on the underside of the vapor barrier. Therefore, wherever possible, insula tion should be installed after the plaster has set and dried. When insulation is installed before plastering, three-coat work is recommended and the scratch coat should be allowed to partially dry before applying the brown coat. CLIPS When the lath is attached to ceilings by clips providing edge support only, three-coat work is required; and, under conditions of high humidity, the scratch coat should be allowed to partially dry before applying the brown coat. Under high humid ity conditions, the use of butt clips and center board clips to further reinforce the lath attachment is preferred. WET LATH Wetting of lath prior to plastering reduces suc tion of the lath and reduces plaster strength. The lath (or the scratch coat) shall never be wetted before plastering. PLASTER--WATER RATIO Basecoat plaster slump should not exceed 4 inches when tested in a 2" x 4" x 6" cone at the mixer. This slump standard is based on plaster mixes which should never exceed proportions recommended by the Gypsum Association. AGGREGATE PROPORTIONING The use of high aggregate ratios reduces plaster strength. Aggregate proportions shall meet the re quirements of those recommended by the Gypsum Association. SGP 0004019 IP 163 Recommended Practices for Construction of Ceilings With Gypsum Lath, Metal Lath and Piaster BASECOAT THICKNESS Application of a thin basecoat plaster seriously reduces the strength of the ceiling. The basecoat plaster shall be applied to full thickness as required by "Recommended Specifications--Gypsum Plaster ing" especially where an acoustical plaster finish is used. WATER DARBYING Use of water in darbying plaster increases the water-plaster ratio and reduces plaster strengths. Water should never be used for darbying and only sparingly for floating. SLOW SET PLASTER The setting time of plaster shall not exceed 4 hours. Faster set can be obtained by adding small amounts of ground raw gypsum to the plaster mix. Or, a controlled fine spray of 5% aluminum sulfate solution can be applied to the plaster after applica tion on the ceiling to obtain a faster set. ACOUSTICAL PLASTER Acoustical plaster should never be applied to a wet basecoat. The basecoat plaster shall be dry prior to application of acoustical plaster. If suction of the basecoat plaster must be adjusted to properly receive the acoustical plaster, care shall be exer cised to avoid the use of excessive water. SGP 0004020