Document BRyp5mVKdp6jjER4jGLjae9x8

Monsanto CONFIDENT Anniston Plant TECHNICAL SERVICES DEPARTMENT MONTHLY REPORT Anni ston C. K. Eastman C. A. Rose J. C. Landwehr L. J. Boesch G. W. Miller U. B. Papageorge W. F. Taffee H. L. Williams Summary May, 1969 Cost Improvement Results Month Eat. Act. $41,580 Target_______ 7, of Target $51,445 80.8 General Offices YTD $138,215 $179,490 77.0 H. C. Carder W. R. Robirds D. Danna (5) P. B. Hodges D. B. Hosmer (2) W. A. Kuhn C. F. Luecke N. L. Sample J. E. Smith R. J. Stratmeyer H. S. Trail Organic Division The Santowax R still controls project installation com pleted last week in May. Test run on revised still system scheduled for 1st week in June. Long term run to meet FDA approval for chlorinated biphenyl in Solid Aroclor 5460 started and stopped due to affect on biphenyl quality. More detailed test will be run in June. Chlorine unloading and caustic unloading facilities were started up May 2 and May 21 respectively. The caustic unloading system had no problems while the chlorine un loading has only one problem; automatic shutoff of the empty cars. Modifications are being made to correct. OTHER LOCATIONS D. W. Jackson-WGK T. M. Patrick - So. 2nd St. A. H. Forsten - Alvin, Texas Purification started up May 2 with unit consistently produc ing hydrogen at less than 10 ppm CO. HB-40 is operating at record rates using purified hydrogen. Off-gas catch pot performing successfully after modifications, enabling recovery of water white Muriatic Acid. 70 M lb/day rates have been demonstrated with the elimination of acid sewering formerly required to purge organics. Agricultural Division Sulfur Recovery scope development proceeding with Process and Engineering Flow Diagrams and Equipment List in preparation. DSW 014881 ' " ' ,34a COMPANY CONFIDENTIAL INFORMATION "This document contains confidential information which is the property of Monsanto Company. Only those portions of the document relevant to a duly authorized individual's need to know may be exerpted for him. The report must not be sent outside the Company without written approval and the recipient is accountable fbt its safe keeping, exerpting or otherwise disclosing of its contents and for its proper disposal." STLCOPCB4003257 Agricultural Diviaion (Cont'd) Company Confidential 2. All background data for appropriation grade estimate will be available by July 1. Design and Drafting Santowax R still controls successfully started up May 27. Final calibrations targeted by June 1. Liaison with Surplus Property Disposal and design to flask mercury continues. Pollution Control Aroclor and HC1 Department waste audits underway. Quality The Plant Quality Score was 87.5, up 3.5 from April with YTD score of 90.0 against a target of 95.0 minimum. Strong quality improvements have been made in P2S5, HB-40, Aroclor 5460. Aroclor 1242 shows a wider spectrum of chlorinated isomers. Free chlorine in Muriatic has risen sharply since chlorine plant shut down. The 30-day demonstration of the new PNP reactor depressurization control system is underway. In spite of very high solids no pluggage has occurred. Depressuri zing cycles are on target (22 minute average). J. C. Landwehr DSW 014882 STLCOPCB4003258 ORGANIC DIVISION 1969 TSD COST IHPROVEMENT ANNUAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DSC Sol.Aro. Li-Still SpG. AFE '015 Sp.Solid Aro. TAR ESI ACT TAR 2250 2250 2250 P23O 25 0 2250 2?50 2250 9250 -- -- 2600 ?600 2600 2600 2,600 2600 26OO 2600 - -- Lower 5060 EST. ACT 1500 5490 4390 215 C 467 C 1500 54 5 0 4 8 50 2150 Sol.Aro.-Still TAR 160 170 160 170 160 170 160 170 160 Coolout temp. EST. AFE 5015 ACT Sol .Aro. -Chlorter TAR Batch End EST 390 390 390 390 390 390 390 390 390 -- AFE 5015 ACT SW/R Composition TAR EST 2750 2750 ?750 2750 2750 2750 2750 2750 - AFE 5016 ACT Solid Aro. TAR Montar 5 Flake EST 1080 1080 1080 1030 1080 1080 1030 1030 - AFE 2949 ACT Sol.Aro. TAR 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 Blend 4465 EST 1690 1920 1630 1490 710 ACT 1690 1920 i6so 149C Sol.Aro.-Verti- TAR cal Still Cond. ESI' AFE 2524 ACT 70 80 70 90 70 70 90 90 9 0 90 70 90 90 90 Sol .Aro.Cl2 T/C Dock AFE 2542 TAR EST ACT 940 940 9-50 0-- 0" -- Cl2 Pit.Down No TAR Unload EST 950 949 959 940 950 940 950 900 CED 1851 ACT Solid Aro.-Flake TAR & Drum EST CED 1450 ACT Liq.Aro. TAR 3000 3000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 0 0 1000 2000 2000 0 0 1000 2000 3000 3000 - - - - - - - - - - 48-53 M #/yr. AFE 2545 EST ACT 0 550C 0 550C - -- Liq.Aro.-No.2 TAR 3000 3000 Still Entrain Sep. EST. AFE 5095 ACT Liq.Aro.-Montar TAR Disposal EST AFE 2952 ACT 1080 1080 1080 1080 1080 1080 1080 1080 1080 1080 0 00 00 Warehouse TAR 2000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 CEA 1452 Liq.Aro.New EST; ACT TAR 2000 2000 200c 3000 3000 2000 200C 2000 3000 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 Burners #3 Still EST ACT 0 0 1500 00 Biphenyl Relocate TAR No. 1 Preheat EST CEA 1892 ACT HB-40 2 A/C's TAR 500 500 500 500 500 500 500 500 500 500 500 500 1500 150C 0 1560 1870 0 6 10 1370 0 3000 ^000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 AFE 3102 EST 2230 2530 0 600 90GC ACT 3490 24 ? C 0 600 1 DSW 014883 STLCOPCB4003259 ORGANIC DIVISION 1969 TSD COST IMPROVEMENT ANNUAL JAN FEB MAR APR MAY JUN JUL AUG . SEP OCT NOV DEC BiO Improve TAR 450 450 450 450 450 450 450 450 Tower Treat. AFE 5155 EST ACT 0 Improve Pit. Power Factor TAR EST 900 900 900 900 900 900 900 900 0 ACT Central Air System TAR EST Tooo 1000 1000 1000 ACT Optimize Rx Time PNP TAR EST. ACT 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 0 3420 0 0 3420 0 0 Reduce Mole Ratio NaOH/PNCB PNP TAR EST ACT 4000 4000 4000 4000 4000 4000 4000 4000 4000 00 0 New Wash Water Pump - PNP AFE 2998 TAR EST ACT 50 50 50 50 50 50 50 50 25 50 50 50 25 sn 50 Automatic pH TAR 500 500 500 Control EST PNP . ACT HC1 Filter Pump TAR 330 330 540 EST 55O 330 340 ACT 330 3 3C J40 New Blow Tank HC1. TAR gOO 200 goo 200 200 goo EST 200 200 200 200 500 ACT 200 200 200 200 150,000 Gal.-HCl Storage Tank AFE 2468 Produce Staley Grade Acid AFE 5076 Cla Pit. Shutdown TAR EST ACT TAR EST ACT TAR EST 1760 1760 1780 17fi0 1760 1780 1760 1760 1730 u " 790 790 7?Q 780 780 790 8880 8880 8880 8880 8880 8880 8880 3380 CEA 1851 ACT Hg Recover from Residue TAR g50 250 g50 250 EST 3910 0 00 ACT 3910 0 0 0 Hg Wash Tank AFE 2802 Biphenyl Productivity Total Organic By Month M $ Total Organic YTD M $ TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT 250 250 g50 250 00 00 00 00 5600 5600 5600 5600 5600 5600 T^ool IZOQ 5600 5600 5^00 5600 0 9uGu 15;Cui. 0 0 5150 10,800 13,500 0 23-3 26.3 29.3 57.5 47-' 51.1 51.6 51.6 51.6 52.7 5_L-! 50.6 27.1 30.2 11.5 36.3 19.8 23.7 27.3 11.4 23. 3 50.1 79.4 116.9 159.? 1210.3 261.9 315 5 565.1 417.8 47 1. - 521.9 46.9 78.3 79.6 115,9 19.8 43.5 63.2 79.6 DSW 014884 STLCOPCB4003260 AG DIVISION 1969 TSD COST IMPROVEMENT ANNUAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT__ NOV DEC Cooling Tower TAR 420 420 410 410 420 4^0 410 420 420 Repiping AFE 2598 EST -ACT 00 0 Optimize N2 & TAR 6600 6700 67 00 6600 6700 67 00 Cl2 Levels EST ACT 00 0 Increase Waste TAR 400 500 500 400 500 300 400 500 500 Acid Sales EST ACT 00 0 Chlorinator R.I. TAR 250 250 250 250 250 250 EST AFE 2244 ACT EVOP Condensation TAR 750 750 500 500 750 750 Rx. EST 0 0 12,615 ACT 0 0 12,615 Cl2 Unloading TAR 5000 5000 5000 2000 2000 2000 EST CEA 1851 ACT Recycle Wash TAR 290 290 290 290; 290 . 290 . Water EST AFE 2960 ACT Parathion Recovery TAR 15800! 5800 5800 EST AFE 2655 Reduce Acetone ACT TAR 1 4500 4500 4500 Losses EST ACT Formulations AFE 2897 TAR EST ACT 1600 1600 1600 1600 1600 1600 3000 6600 4300 | Change Cooling HaO Item iyi AFE 5067 Well HjjO to Jets TAR EST ACT TAR 125 125 125 125 125 125 125; 125 125 120 180 120 500 500 500 EST ACT Ag. Division by Month TAR 750 750 50CB145 9145 91*? 1^5 1 46.8 5 14685 1 4575 1 a45 ^ 14-435 EST I2pl5 3^2 0 ,730 ACT 0 0 12$5 + ,433 Ag. Division YTD TAR EST ACT 750 1500 300C 5029 0 $112,615 3,315 0 0 12,615 441 m 53785 73470 3 3 045 1025=4 117015 TAR Organic Div. Untargated - HC1 Catch Tank EST ACT TAR EST ACT 0 500 DSW 014885 STLCOPCB4003261 AROCLOR 2. 2. Bowles, C. R. Me11wain (V. R. Haupt) Company Confidential 3. Evaluate Quaterphenyl Polyphenyl Effects on Solid Aroclor Yields 1969 Savings $63,200 NFC $14,000 TSD Objective B - 8 (a) Still awaiting radloactiva materials license before the source for the level alarm can be shipped. Operating peraonnel will be trained in the use of the instruments during June. Debottleneck Solid 1969 Savings TBE TSD Objective Aroclor Chlorlnator______________ Plus Safety_________________________ B - 8 (f) Includes installing a back pressure controller on the #9 chlorlnator and a larger collection tank. AFE by 6-15. Drafting scheduled for June. Iherminol System Potential TSD Objective ______________________________________ Lost Salea_________________________ B - 8 (h) Project design is complete and equipment has been selected. Have received verbal approval to purchase pump and pump is now on order. Pump delivery is scheduled for six to eight weeks. This project will be Installed when the Solid Aroclor expansion Is Installed. BIPHENYL-SAOTOWAX W. G. Niemeyer, D. A. Self (V. R. Haupt) Debottleneck Biphenyl Capacity TSD Objective Stills to 87.6 H lbs/vr.IncreaseB - 7 (a) During the week of May 26, the capacity of the Santowax reboiler furnace will be increased and instrumentation required to control the Santowax still will be installed. A demonstration test run will be conducted on the biphenyl/ Santowax distillation area during the first week of June. Santowax with low biphenyl TSD Objective content for FDA Solid Aroclor QualityB - 7 (a) Started long term test during week-end of May 16. Incomplete results were obtained. The feed composition to the still is now about 65 - J>5 (biphenyl-Santowax) compared to 80 - 20 during the initial testing in January, 1969. The June test will establish the minimum biphenyl content of Santowax C with the present feed composition. DSW 014886 STLCOPCB4003262 Company Confidential 4. No. 1 Furnace Upgrade Capacity TSD Objective Liaison (CEA-1892)________________ Increase______________________________ B - 7 (c) The plant punch list is essentially complete. Improve Santowax R Quality Quality with New Distillation Column____________________________________________ TSD Objective B - 7 (d) Installation of instrumentation to control the Santowax distillation column was made on May 27. Calibration of instruments should be complete by May 29. A demonstration test run will be conducted on the Santowax column during the first week in June to determine its capacity and optimum operating conditions. CHLORINE - HB-40 D. W. Dudley, J. L. Brown (A. G. McCarty) Chlorine unloading, caustic unloading, and hydrogen purification facilities were successfully started up during May. A problem exists with automatic isolation of empty chlorine cars. System being operated manually until problem is solved. HC1 0. J. Norris, J. M Jones (A. G. McCarty) Production of Staley Grade New Earnings $28.8 M TSD Objective Acid-Prolect ^076Potential Savings $71 MB - 10 (c) Acid Recovery up significantly (>70,000#/day) when new catch tank is in service and sewer by-pass valve is closed. Experienced problems draining collected organics from tank week-end of 5/10. Modification to steam supply on coils and discharge valve completed 5/16. Draining successfully demonstrated 5/21. Coalescer for Phase II Installed along with all required piping. Vendor supplied wrong size heating strips for coalescer dome, maintenance now modifing - completion by 6/15. Muriatic Acid Storage Savings $21.200TSD Job No. 497 Piping completed. Project will be complete upon installation of level indicator. Sewered approximately 140,000# this month because of full storage. Muriatic Acid MIP ________________________________________________ ; All plant groups have been contacted for contributions, rough draft will be ready for typing 6/6. Reduce High Free C12 in Muriatic Acid _____________ _________ After extensive KTA, test was made on air sparging HC1 gas to absorber. Tests over weekend of 5/24 showed no improvement. Problem has been given top priority. DSW 014887 STLCOPCB4003263 PNP 0. J. Norris, J. M. Jones (A. G. McCarty) Company Confidential 5. Debottleneck to 1.8 H #/mo$27.500B - 9 (a) Capacity Savings TSD Objective Reactor process control program in effect and operating as expected. Rate remains below schedule as tests for determining cause of yield loss continue. This month acid and caustic returned to near normal while PNCB remained high. This would seem to indicate loss occuring in reactor. Production has begun to monitor air flow rate. Poor cycles on carbon towers are being investigated by P.A.C. Company. NIRAN K. G. Hale, D. W. Dudley, T. W. Lawrence (A. G. McCarty) Demonstrate Parathion Recovery Savings $17,500 TSD Objective 10-15% Reduced COD________________ B - 5 (a) Drawings of test facilities were sent out for review 5/21. Project 3245 ($6350 experimental expense) was approved 5/26 to conduct tests. Project premise was published 5/27. Transmittal to maintenance is slated for 6/4. Acetone Recovery Savings $12,900 TSD Objective 40-50% COD Reduction______________ B - 5 (i) Background data for acetone recovery tests were gathered but test will have to be delayed until approximately 6/9 when a new nozzle for the vacuum jet can be in stalled. Average of acetone loss from number three condensation reactor is 5.06% or 800 pounds per batch on methyl vs. 3.2% or 500 pounds per batch on ethyl. Recycle Wash Savings $3,500 TSD Objective Water_____________________________________________________________________ B - 5 (g) No change in status. Central Chlorine Unloading Savings $21,000 .. TSD Objective B - 6 (a) Construction underway on chlorine dock and railroad spurs. Operator training to be conducted in June with probable start-up of late June. QSW 014888 STLCOPCB4003264 NIRAN (Cont'd) Company Confidential 6. Sulfur Recovery From Residue $271,000/yr. Savinga 4OX Reduction in S0o TSD Objective B - 5 (d) Anniston continues work on scope details, equipment selection and engineering flow sheets. Completion of package for estimating purposes is expected by 7/1/69. Quotes on Hastelloy equipment were delayed until early June. Recent corrosion test indicate S.S. 3I6 is satisfactory in the wash steps under neutralized conditions. P.R.&D. is checking validity of process under changed conditions. EDC for scheduled P.R.&D. work is 6/15/69. Submerged Pump for Savings $1500 TSD Objective Refractive Index (Potential Automation) B - 5 (c) Control of Chlorination________________________________________________________ ' The Maintenance Engineer's visit to "Taber" was delayed until June. He will at this time discuss design changes for the Rafractometer pump with Taber Engineers. Plant tests were stopped when pump seals failed after short service. Optimize Cla and Na Levels|B - 5 ( ) Savings $40,000 TSD Objective Test plans will be issued by 6/6. Plant tests are scheduled to begin when sand blasting is stopped and fume system is started. Methyl-Ethyl Alcohol Cross Contamination_________ Savinga $3200 TSD Job No. 918 Project premise prepared and circulated for approval. Design package and estimate being prepared. Improve Chlorinator Cooling System Savings $48,000/mon./0.5 hr ISD Objective Reduction in Chlorination Time B - 5 (x) Evaluation has begun on current design and operation. Alternate refrigerants are being considered. Chlorinator Long Cycle Time Savings $46,000/mo TSD Job No. 927 __________________ : Number 3 Chlorinator consistently exceeds chlorination time standard by approximately 2 hours/batch. Evaluation of operation has begun. OSW 014889 STLCOPCB4003265 NIRAN (Cont'd) Coopany Confidential 7. Modify PaS5 Charge Valves Safety Item TSD Job. No. 919 ______ _______________________ P2S5 hold-up in charge chutea ia liated aa contributory to aub-major accident (#5-58) involving eye irritation from PgSj dust and HaS exposure from hydrolyzed PgSj during maintenance on Thio Acid reactor. P2S5 charging ayatem being evaluated for modification of charge valvea. ENGINEERING DESIGN AND SERVICES Mechanical/Electrical/Inatrument Deaign and Drafting J. C. Price. J. A. Veazey, R. V. Carliale. R. L. Brewer. J. K. Rennie. J. Childreaa. (W. F. Taffeej Inatrument and electrical phaae of Santowax-R Still Control. (APE 3OI6 - $33M) was atarted up aucceaafully on 5/27/69. Final check-out and calibration targeted for completion by 6/1/69. A hydrogen aulflde (HaS) monitor haa been placed on order (Accident inveatigation #5-68). Delivery ia expected in 90 daya. A plant teat will be made to determine if the unit ia auitable for uae in the Niran department. The deaign for the Plant Fire Alarm (AFE 2575 - $2.9M) ia being reviaed. The new revision, a combination of Monaanto and Bell Telephone equipment, will provide a better overall ayatem than the one originally planned. Final deaign tranamittal ahould be made in June. A safety and aecurity review for the flaaking and storage of mercury obtained from the Dismantling and Removal of Chlorine Manufacturing Facilities at Anniston (AFR 3214) was held on 5/15/69. Revisions and dismantling in Building 8 A to provide desk apace for new employees started in mid May. Delivery of partitions and shelving being expedited by Pur chasing. Additional desks and chairs required have been received. Improved lighting provided for Pollution Control Engineers' area. Projects approved during May: Provide Fire Pump Capacity Check Equipment (AFE 3227 - $4.1M). Review drawings were completed for the following projects: Parathion Recovery Teat (AFE 3245 - $6.^0 Alcohol Separation (Niran) (AFE 3256 - $ to be det.) DSW 014890 STLCOPCB4003266 Company Confidential 8. ENGINEERING DESIGN AND SERVICES (Cont'd) Construction drawings were completed for the following projects: Alter Therminol System in Solid Aroclor (AFE 2949 - $121), provide offices for new T5D Personnel (AFE 3212 - $3.6M), Liquid Aroclor still Debottleneck (AFE 3O93 $4.5M), Bi-<t Cooling Tower Treatment (3155 - $3.6MO, Capacitor Relocation (AFE 3184 - $18.1M C11.1M transferred equipment U), Niran Tank Farm Area Lighting (AFE 3^24 - $7M), Bi-0 Tank Farm Lighting (AFE 3204 - $0.7M), Upgrade Intermediate Dock at Niran (AFE 2934 - $11.3M C3 docks^). UTILITIES ENGINEERING J. C. Price, L. 0. Chambers (W. F. Taffee) Forwarded revised project premise for use of Well Water @ Niran Jets. Estimated savings were increased from $6000 to $8000 per year. Trans mitted design packages for Capacitor Relocation and Improve Biphenyl Cooling Tower Treatment projects. Relocation of the capacitors is to be completed early in June with the savings of $10,800 per year to start in July. Preliminary efficiency studies of the Biphenyl Furnace and Therminol Furnaces in Aroclor, Santowax were completed. PLANT IMPROVEMENT G. C. Goodwin (W. F. Taffee) AFE forwarded for approval, paving Duncan Street South (AFE 3243 $1500). Design packages forwarded for alteration to Building 28-A (AFE 3212 $3600) and drain pad PNP Item 216 (AFE 3222 - $1500) project approved in May, HC1 area drainage (AFE 3221 - $1900). POLLUTION CONTROL E. G. Wright (W. F. Taffee) Community and Government Relations Governmental Relations TSD Objective F-2 The prepared Alabama Air Pollution law, which is backed by the Associated Industries of Alabama, is being criticized by Health Department and Conservationist sources as being an industry-oriented bill. The "Anti's" are also quoting HEW as saying that the bill would not meat their standards. Community and Governmental Relations Complaints TSD Objective F-2 Received two air pollution complaints during May. They were aggravated by the weather, l.e. no wind plus high humidity prevented the dispersion of S02 fumes. DSW 014891 STLCOPCB4003267 Company Confidential 9. POLLUTION CONTROL (Cont'd) Waste Audita Pollution Abatement TSD Objective F- ^ Plan outlined in memo to Paul Hodges 5/12/69 being followed and la on schedule. Waste audits in the aroclor and HC1 departments were started during May. Visual inspection of Snow Creek for visible "pockets" deposits of liquid aroclor started, with completion by 7/1. Samplers will be Installed at two more points in the Aroclor department as soon as repairs are completed on the sewer. Waste Treatment All plant wastes were effectively treated during May. However, the Parathion department did have some downtime due to a plugged drain in the north hold tank. Average dally values for Monsanto's effluent are as follows: Average Daily Specifications PNP 1.0 ppm 5 ppm COD 94.9 ppm ^ 200 ppm Parathion .14 ppm 1.0 ppm BOD No Data ^200 ppm DSW 014892 STLCOPCB4003268 .Company Confidential 10 PROCESS AND QUALITY ANALYSIS W. B. Dunlap Quality The Plant Quality Score was 87.5, up 3*5 from April with YTD score of 90.0 against a target of 95.0 minimum. Strong quality improvements have been made in P2S5, HB-40, Aroclor 5460. Aroclor 1242 shows a wider spectrum of ^ chlorinated isomers. Free chlorine in Muriatic has risen sharply since _____chlorine plant shutdown. PNP - Monitor Potential Savings TSD Objective Critical Variables $60,000 C-3 __________________________________________________________ Job 879_________________ The 30-day demonstration of the new PNP reactor depressurization control system is underway. In spite of very high solids no pluggage has occurred. Depressuri zing cycles are on target ( 22 minimum average). Solids have now dropped to normal, without determination of the causes for high level having been made. Manpower Lamar Murphree joined the P&QA group May 15th. DSW 014893 STLCOPCB4003269 ) PLANT LABORATORIES G. W. Miller Company Confidential 11. PROCESS RESEARCH AND DEVELOPMENT J. T. Bell A laboratory effort of 55 mandays was expended on projects outlined in the 1969 PR&D Program including the expanded study of Sulfur Recovery. The remaining mandays were used for the Hydrogen Purification Unit start-up and on miscellaneous analytical services. p-Nltrophenol Reduce Cycle Times W. H. Howard The project involving PNP Reactor improvements is on schedule as per the revised work plan issued 5/23/69. The necessity of developing a continuous HB-40 process will postpone the rate studies as planned for the PNP reactor. A PR&D report is to be Issued by 6/18/69 covering the entire PNP project started in January. A completion date of 8/1/69 was forecast in the 1969 PR&D Program. Sulfur Recovery Sulfur Refinement for ReuseI. Ransaw______ The study has progressed according to the original work plan and is over 80% completed. A work plan revision was published 5/28/69 with the project to be reported by 6/16/69. This Investigation has been continued past the original planned completion date of 4/1/69. Blend Scavenger Improved Aroclor Refinement (Aroclor)Electrical PropertiesJ. L. Brown A work plan was issued on 5/22/69 to cover the study for the up-grading of Aroclor-phenyl glycidyl ether blends via absorptive column treatment. Work is scheduled for completion by 7/3/69. Parathion Isomer Reduction Improve Yields G. L. Arnett Laboratory studies have been reported in the PR&D report dated 5/6/69. The issuance of a follow-up work plan will be delayed until the prepa ration of a sales sample of Low Color Aroclor 5460 has been completed. The study of Thlo Acid Chlorinator Chlorine Distribution and Temperature Improvements is being combined with this project. Hydrogen Purification Unit Start-up Purified Hydrogen for HB-40 J. L. Brown Construction and start-up was completed on the target date of 5/1/69 with excellent results. Revisions are scheduled for the week of 6/2/69 to permit the burning of purge Hydrogen in the Biphenyl Tubular Units. DSW 014894 STLCOPCB4003270 PLANT LABORATORIES (Cont'd) .Company Confidential 12 ANALYTICAL AND QUALITY CONTROL S. 0. Kemp Aroclor Analytical equipment for electrical quality measurements on Aroclor will be completed this month. Complaint Report Quality Number Material Cus tomer Reason 3-A-69 4-A-69 5-A-69 Aroclor 1242 Montar 5 Aroclor 5460 Essex Corp. Philip Carey Corp. Yates Mfg. Co. Moisture Content Particle Size and Solubility Particle Contamination YTD Quality Complaints/100 Shipments 0.17 Target 0.20 DSW 014895 STLCOPCB4003271 ) Company Confidential COMMUNITY RELATIONS. PERSONNEL. RECRUITING. AND DEVELOPMENT 13- Personnel 1. J. L. Murphree joined TSD as Process Quality and Analysis Technician under W. B. Dunlap. 2. J. C. Landvehr visited the refinery at El Dorado, Arkansas on the Innovation Exchange Program May 14 and IS. 3. 0. J. Norris was promoted to Production Supervisor at the Nitro Plant. 4. J. L. Brown was promoted to Research Chemist II effective 6-1-69. 5. J. W. Mattern rejoined the TSD Department on May 15 reporting to V. R. Haupt. 6. 0. J. Norris and G. L. Arnett cleaned up a Parathion spill at Edinburg, Texas, week of May 5. 7. G. L. Arnett visited Dr. Scott Tucker in St. Louis, Monday, May 12, to discuss analytical procedure for determination of Aroclor in waste water. Development 1. Dr. J. Bruce Duncan of the New Enterprises Division presented a seminar to 25 Anniston Plant personnel covering Monsanto developed instruments for process measurement and control. May 12, 1969. 2. A. G. McCarty, S. 0. Kemp, J. C. Price, G. W. Miller and W. F. Taffee attended a refresher course in Coaching and Appraisal Interviews conducted by Mr. Ed Pipkin at the Oxford Holiday Inn, May 27 and 28. 3. G. W. Miller and J. C. Landwehr attended Personnel Management course in St. Louis, May 21 and 22. 4. W. B. Dunlap, D. W. Dudley, C. R. Mcllwain and T. W. Lawrence spent week of May 5 at the Holiday Inn attending the "Management Process" course taught by Connie Eastman. Visitors 1. J. E. Smith and J. E. Springgate, Plasticizer Business Group, visited May 8 and 9. 2. R. S. Yates from CED visited to discuss the Solid Aroclor expansion. May 14 and 15. DSW 014896 STLCOPCB4003272 PROCESS IMPROVEMENT DISTRIBUTION OF TIME BY TECHNICAL SERVICE Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec. NEW PRODUCTS PLANT IMPROVEMENT ASSIST OPERATIONS SPECIAL. ENGINEERING SERVICES TECHNICAL MANPOWER MISCELLANEOUS ACTIVITIES AND ABSENCES OSH 014897 STLCOPCB4003273 IN MAINTENANCE FOR CONSTRUCTION 600 500 400 300 200 100 00 IN MAINTENANCE COMPLETED NOT CLOSED PROJECTS SUBMITTED FOR APPROVAL CaO ao ho cazo 600 < C=O3 o 500 H Z 400 300 200 100 00 APPROVED PROJECIS IN TSD TSD PROJECT SUMMARY -- DSW 014898 STLCOPCB4003274 laboratory ad:;i::i5tratio:: I ANALYTICAL SAMPLES 60 1967 --. 1968 J J F M A M J j A S 0 N n 56 52 48 44 40 t5V4S Vi 11 1 1 1n 1 1^ /A_ d . 1 '[\// >\ 1 V _____ mz i ANALYTICAL MANPOWER Manpower/sample --1-------- 1-- 1^ 1 11.00 10.00 $/Manhours 9.00 8.00 7.00 1 j 1* i 1 ____ !____ _J____ V. Total Plant Operating Cost Overtime 7. STLCOPCB4003275