Document BRyp5mVKdp6jjER4jGLjae9x8
Monsanto
CONFIDENT
Anniston Plant
TECHNICAL SERVICES DEPARTMENT
MONTHLY REPORT
Anni ston
C. K. Eastman C. A. Rose J. C. Landwehr L. J. Boesch G. W. Miller U. B. Papageorge W. F. Taffee H. L. Williams
Summary May, 1969
Cost Improvement Results
Month
Eat. Act. $41,580
Target_______ 7, of Target
$51,445
80.8
General Offices
YTD
$138,215
$179,490
77.0
H. C. Carder W. R. Robirds D. Danna (5) P. B. Hodges D. B. Hosmer (2) W. A. Kuhn C. F. Luecke N. L. Sample J. E. Smith R. J. Stratmeyer H. S. Trail
Organic Division
The Santowax R still controls project installation com pleted last week in May. Test run on revised still system scheduled for 1st week in June.
Long term run to meet FDA approval for chlorinated biphenyl in Solid Aroclor 5460 started and stopped due to affect on biphenyl quality. More detailed test will be run in June.
Chlorine unloading and caustic unloading facilities were started up May 2 and May 21 respectively. The caustic unloading system had no problems while the chlorine un loading has only one problem; automatic shutoff of the empty cars. Modifications are being made to correct.
OTHER LOCATIONS
D. W. Jackson-WGK T. M. Patrick -
So. 2nd St. A. H. Forsten -
Alvin, Texas
Purification started up May 2 with unit consistently produc ing hydrogen at less than 10 ppm CO. HB-40 is operating at record rates using purified hydrogen.
Off-gas catch pot performing successfully after modifications, enabling recovery of water white Muriatic Acid. 70 M lb/day rates have been demonstrated with the elimination of acid sewering formerly required to purge organics.
Agricultural Division
Sulfur Recovery scope development proceeding with Process and Engineering Flow Diagrams and Equipment List in preparation.
DSW 014881
' " ' ,34a
COMPANY CONFIDENTIAL INFORMATION
"This document contains confidential information which is the property of Monsanto Company. Only those portions of the document relevant to a duly authorized individual's need to know may be exerpted for him. The report must not be sent outside the Company without written approval and the recipient is accountable fbt its safe keeping, exerpting or otherwise disclosing of its contents and for its proper disposal."
STLCOPCB4003257
Agricultural Diviaion (Cont'd)
Company Confidential 2.
All background data for appropriation grade estimate will be available by July 1.
Design and Drafting
Santowax R still controls successfully started up May 27. Final calibrations targeted by June 1.
Liaison with Surplus Property Disposal and design to flask mercury continues.
Pollution Control Aroclor and HC1 Department waste audits underway.
Quality
The Plant Quality Score was 87.5, up 3.5 from April with YTD score of 90.0 against a target of 95.0 minimum. Strong quality improvements have been made in P2S5, HB-40, Aroclor 5460. Aroclor 1242 shows a wider spectrum of chlorinated isomers. Free chlorine in Muriatic has risen sharply since chlorine plant shut down.
The 30-day demonstration of the new PNP reactor depressurization control system is underway. In spite of very high solids no pluggage has occurred. Depressuri zing cycles are on target (22 minute average).
J. C. Landwehr
DSW 014882 STLCOPCB4003258
ORGANIC DIVISION 1969 TSD COST IHPROVEMENT
ANNUAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DSC
Sol.Aro. Li-Still SpG.
AFE '015 Sp.Solid Aro.
TAR ESI ACT TAR
2250 2250 2250 P23O 25 0 2250 2?50 2250 9250
--
--
2600 ?600 2600 2600 2,600 2600
26OO 2600 -
--
Lower 5060
EST. ACT
1500 5490 4390 215 C 467 C 1500 54 5 0 4 8 50 2150
Sol.Aro.-Still TAR
160 170 160 170 160 170 160 170 160
Coolout temp. EST.
AFE 5015
ACT
Sol .Aro. -Chlorter TAR
Batch End
EST
390 390 390 390 390 390 390 390 390 --
AFE 5015
ACT
SW/R Composition TAR EST
2750 2750 ?750 2750 2750 2750 2750 2750 -
AFE 5016
ACT
Solid Aro.
TAR
Montar 5 Flake EST
1080 1080 1080 1030 1080 1080 1030 1030 -
AFE 2949
ACT
Sol.Aro.
TAR 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500
Blend 4465
EST 1690 1920 1630 1490 710 ACT 1690 1920 i6so 149C
Sol.Aro.-Verti- TAR
cal Still Cond. ESI'
AFE 2524
ACT
70 80 70 90 70 70 90 90 9 0 90 70 90 90 90
Sol .Aro.Cl2 T/C Dock AFE 2542
TAR EST ACT
940 940 9-50
0--
0"
--
Cl2 Pit.Down No TAR
Unload
EST
950 949 959 940 950 940 950 900
CED 1851
ACT
Solid Aro.-Flake TAR
& Drum
EST
CED 1450
ACT
Liq.Aro.
TAR
3000 3000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 0 0 1000 2000 2000 0 0 1000 2000
3000 3000 - - - - - - - - - -
48-53 M #/yr. AFE 2545
EST ACT
0 550C 0 550C -
--
Liq.Aro.-No.2 TAR
3000 3000
Still Entrain Sep. EST.
AFE 5095
ACT
Liq.Aro.-Montar TAR
Disposal
EST
AFE 2952
ACT
1080 1080 1080 1080 1080 1080 1080 1080 1080 1080
0 00 00
Warehouse
TAR 2000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000
CEA 1452 Liq.Aro.New
EST; ACT TAR
2000 2000 200c 3000 3000 2000 200C 2000 3000
1500 1500 1500 1500 1500 1500 1500 1500 1500 1500
Burners #3 Still EST ACT
0 0 1500 00
Biphenyl Relocate TAR
No. 1 Preheat EST
CEA 1892
ACT
HB-40 2 A/C's TAR
500 500 500 500 500 500 500 500 500 500 500 500
1500 150C
0 1560 1870 0 6 10 1370
0
3000 ^000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000
AFE 3102
EST 2230 2530 0 600 90GC ACT 3490 24 ? C 0 600 1
DSW 014883
STLCOPCB4003259
ORGANIC DIVISION 1969 TSD COST IMPROVEMENT
ANNUAL JAN FEB MAR APR MAY JUN JUL AUG . SEP OCT NOV DEC
BiO Improve
TAR
450 450 450 450 450 450 450 450
Tower Treat. AFE 5155
EST ACT
0
Improve Pit. Power Factor
TAR EST
900 900 900 900 900 900 900 900 0
ACT
Central Air System
TAR EST
Tooo 1000 1000 1000
ACT
Optimize Rx Time PNP
TAR EST. ACT
2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500
0 3420 0 0 3420 0
0
Reduce Mole Ratio NaOH/PNCB PNP
TAR EST ACT
4000 4000 4000 4000 4000 4000 4000 4000 4000 00 0
New Wash Water Pump - PNP AFE 2998
TAR EST ACT
50 50 50 50 50 50 50 50
25 50 50 50 25 sn 50
Automatic pH
TAR
500 500 500
Control
EST
PNP . ACT
HC1 Filter Pump
TAR 330 330 540 EST 55O 330 340 ACT 330 3 3C J40
New Blow Tank HC1.
TAR gOO 200 goo 200 200 goo EST 200 200 200 200 500 ACT 200 200 200 200
150,000 Gal.-HCl Storage Tank AFE 2468 Produce Staley Grade Acid AFE 5076
Cla Pit. Shutdown
TAR EST ACT TAR EST ACT
TAR EST
1760 1760 1780 17fi0 1760 1780 1760 1760 1730 u " 790 790 7?Q 780 780 790
8880 8880 8880 8880 8880 8880 8880 3380
CEA 1851
ACT
Hg Recover from Residue
TAR g50 250 g50 250
EST 3910 0
00
ACT 3910 0 0 0
Hg Wash Tank
AFE 2802 Biphenyl Productivity
Total Organic By Month M $
Total Organic YTD M $
TAR EST ACT TAR EST ACT
TAR
EST ACT TAR EST ACT
250 250 g50 250
00 00
00 00
5600 5600 5600 5600 5600 5600 T^ool IZOQ 5600 5600 5^00 5600
0 9uGu 15;Cui. 0
0
5150 10,800 13,500 0
23-3 26.3 29.3 57.5 47-' 51.1 51.6 51.6 51.6 52.7 5_L-! 50.6
27.1 30.2 11.5 36.3 19.8 23.7 27.3 11.4
23. 3 50.1 79.4 116.9 159.? 1210.3 261.9 315 5 565.1 417.8 47 1. - 521.9
46.9 78.3 79.6 115,9
19.8 43.5 63.2 79.6
DSW 014884
STLCOPCB4003260
AG DIVISION 1969 TSD COST IMPROVEMENT
ANNUAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT__ NOV DEC
Cooling Tower
TAR
420 420 410 410 420 4^0 410 420 420
Repiping AFE 2598
EST -ACT
00 0
Optimize N2 &
TAR
6600 6700 67 00 6600 6700 67 00
Cl2 Levels
EST ACT
00 0
Increase Waste
TAR
400 500 500 400 500 300 400 500 500
Acid Sales
EST ACT
00 0
Chlorinator R.I.
TAR
250 250 250 250 250 250
EST
AFE 2244
ACT
EVOP Condensation TAR 750 750 500
500 750 750
Rx. EST 0 0 12,615 ACT 0 0 12,615
Cl2 Unloading
TAR
5000 5000 5000 2000 2000 2000
EST
CEA 1851
ACT
Recycle Wash
TAR
290 290 290 290; 290 . 290 .
Water
EST
AFE 2960
ACT
Parathion Recovery TAR
15800! 5800 5800
EST
AFE 2655 Reduce Acetone
ACT TAR
1 4500 4500 4500
Losses
EST
ACT
Formulations AFE 2897
TAR EST ACT
1600 1600 1600 1600 1600 1600 3000 6600 4300
|
Change Cooling HaO Item iyi AFE 5067 Well HjjO to Jets
TAR EST ACT TAR
125 125 125 125 125 125 125; 125 125 120 180 120
500 500 500
EST
ACT
Ag. Division by Month
TAR 750 750 50CB145 9145 91*? 1^5 1 46.8 5 14685 1 4575 1 a45 ^ 14-435 EST I2pl5 3^2 0 ,730 ACT 0 0 12$5 + ,433
Ag. Division YTD
TAR
EST ACT
750 1500 300C
5029 0
$112,615
3,315
0 0 12,615
441 m 53785 73470 3 3 045 1025=4 117015
TAR
Organic Div. Untargated - HC1 Catch Tank
EST ACT
TAR EST ACT
0 500
DSW 014885
STLCOPCB4003261
AROCLOR
2. 2. Bowles, C. R. Me11wain (V. R. Haupt)
Company Confidential
3.
Evaluate Quaterphenyl Polyphenyl Effects on Solid Aroclor Yields
1969 Savings $63,200 NFC $14,000
TSD Objective B - 8 (a)
Still awaiting radloactiva materials license before the source for the level alarm can be shipped. Operating peraonnel will be trained in the use of the instruments during June.
Debottleneck Solid
1969 Savings TBE
TSD Objective
Aroclor Chlorlnator______________ Plus Safety_________________________ B - 8 (f)
Includes installing a back pressure controller on the #9 chlorlnator and a larger collection tank. AFE by 6-15. Drafting scheduled for June.
Iherminol System
Potential
TSD Objective
______________________________________ Lost Salea_________________________ B - 8 (h)
Project design is complete and equipment has been selected. Have received verbal approval to purchase pump and pump is now on order. Pump delivery is scheduled for six to eight weeks. This project will be Installed when the Solid Aroclor expansion Is Installed.
BIPHENYL-SAOTOWAX W. G. Niemeyer, D. A. Self (V. R. Haupt)
Debottleneck Biphenyl
Capacity
TSD Objective
Stills to 87.6 H lbs/vr.IncreaseB - 7 (a)
During the week of May 26, the capacity of the Santowax reboiler furnace will be increased and instrumentation required to control the Santowax still will be installed. A demonstration test run will be conducted on the biphenyl/ Santowax distillation area during the first week of June.
Santowax with low biphenyl
TSD Objective
content for FDA Solid Aroclor QualityB - 7 (a)
Started long term test during week-end of May 16. Incomplete results were obtained.
The feed composition to the still is now about 65 - J>5 (biphenyl-Santowax) compared to 80 - 20 during the initial testing in January, 1969. The June test will establish the minimum biphenyl content of Santowax C with the present feed composition.
DSW 014886
STLCOPCB4003262
Company Confidential 4.
No. 1 Furnace Upgrade
Capacity
TSD Objective
Liaison (CEA-1892)________________ Increase______________________________ B - 7 (c)
The plant punch list is essentially complete.
Improve Santowax R
Quality
Quality with New
Distillation Column____________________________________________
TSD Objective B - 7 (d)
Installation of instrumentation to control the Santowax distillation column was made on May 27. Calibration of instruments should be complete by May 29. A demonstration test run will be conducted on the Santowax column during the first week in June to determine its capacity and optimum operating conditions.
CHLORINE - HB-40 D. W. Dudley, J. L. Brown (A. G. McCarty)
Chlorine unloading, caustic unloading, and hydrogen purification facilities were successfully started up during May. A problem exists with automatic isolation of empty chlorine cars. System being operated manually until problem is solved.
HC1 0. J. Norris, J. M Jones (A. G. McCarty)
Production of Staley Grade
New Earnings $28.8 M
TSD Objective
Acid-Prolect ^076Potential Savings $71 MB - 10 (c)
Acid Recovery up significantly (>70,000#/day) when new catch tank is in service and sewer by-pass valve is closed. Experienced problems draining collected organics from tank week-end of 5/10. Modification to steam supply on coils and discharge valve completed 5/16. Draining successfully demonstrated 5/21. Coalescer for Phase II Installed along with all required piping. Vendor supplied wrong size heating strips for coalescer dome, maintenance now modifing - completion by 6/15.
Muriatic Acid Storage
Savings $21.200TSD Job No. 497
Piping completed. Project will be complete upon installation of level indicator. Sewered approximately 140,000# this month because of full storage.
Muriatic Acid MIP
________________________________________________ ;
All plant groups have been contacted for contributions, rough draft will be ready for typing 6/6.
Reduce High Free C12 in Muriatic Acid
_____________ _________
After extensive KTA, test was made on air sparging HC1 gas to absorber. Tests over weekend of 5/24 showed no improvement. Problem has been given top priority.
DSW 014887
STLCOPCB4003263
PNP 0. J. Norris, J. M. Jones (A. G. McCarty)
Company Confidential 5.
Debottleneck to 1.8 H #/mo$27.500B - 9 (a)
Capacity Savings
TSD Objective
Reactor process control program in effect and operating as expected. Rate remains below schedule as tests for determining cause of yield loss continue. This month acid and caustic returned to near normal while PNCB remained high. This would seem to indicate loss occuring in reactor. Production has begun to monitor air flow rate. Poor cycles on carbon towers are being investigated by P.A.C. Company.
NIRAN K. G. Hale, D. W. Dudley, T. W. Lawrence (A. G. McCarty)
Demonstrate Parathion Recovery
Savings $17,500
TSD Objective
10-15% Reduced COD________________ B - 5 (a)
Drawings of test facilities were sent out for review 5/21. Project 3245 ($6350 experimental expense) was approved 5/26 to conduct tests. Project premise was published 5/27. Transmittal to maintenance is slated for 6/4.
Acetone Recovery
Savings $12,900
TSD Objective
40-50% COD Reduction______________ B - 5 (i)
Background data for acetone recovery tests were gathered but test will have to be delayed until approximately 6/9 when a new nozzle for the vacuum jet can be in stalled. Average of acetone loss from number three condensation reactor is 5.06% or 800 pounds per batch on methyl vs. 3.2% or 500 pounds per batch on ethyl.
Recycle Wash
Savings $3,500
TSD Objective
Water_____________________________________________________________________ B - 5 (g)
No change in status.
Central Chlorine Unloading
Savings $21,000 ..
TSD Objective B - 6 (a)
Construction underway on chlorine dock and railroad spurs. Operator training to be conducted in June with probable start-up of late June.
QSW 014888 STLCOPCB4003264
NIRAN (Cont'd)
Company Confidential
6.
Sulfur Recovery From Residue
$271,000/yr. Savinga 4OX Reduction in S0o
TSD Objective B - 5 (d)
Anniston continues work on scope details, equipment selection and engineering flow sheets. Completion of package for estimating purposes is expected by 7/1/69. Quotes on Hastelloy equipment were delayed until early June.
Recent corrosion test indicate S.S. 3I6 is satisfactory in the wash steps under neutralized conditions. P.R.&D. is checking validity of process under changed conditions. EDC for scheduled P.R.&D. work is 6/15/69.
Submerged Pump for
Savings $1500
TSD Objective
Refractive Index
(Potential Automation)
B - 5 (c)
Control of Chlorination________________________________________________________ '
The Maintenance Engineer's visit to "Taber" was delayed until June. He will at this time discuss design changes for the Rafractometer pump with Taber Engineers. Plant tests were stopped when pump seals failed after short service.
Optimize Cla and Na Levels|B - 5 ( )
Savings $40,000
TSD Objective
Test plans will be issued by 6/6. Plant tests are scheduled to begin when sand blasting is stopped and fume system is started.
Methyl-Ethyl Alcohol Cross Contamination_________
Savinga $3200
TSD Job No. 918
Project premise prepared and circulated for approval. Design package and estimate being prepared.
Improve Chlorinator Cooling System
Savings $48,000/mon./0.5 hr
ISD Objective
Reduction in Chlorination Time
B - 5 (x)
Evaluation has begun on current design and operation. Alternate refrigerants are being considered.
Chlorinator Long Cycle Time
Savings $46,000/mo
TSD Job No. 927 __________________ :
Number 3 Chlorinator consistently exceeds chlorination time standard by approximately 2 hours/batch. Evaluation of operation has begun.
OSW 014889
STLCOPCB4003265
NIRAN (Cont'd)
Coopany Confidential 7.
Modify PaS5 Charge Valves
Safety Item
TSD Job. No. 919 ______ _______________________
P2S5 hold-up in charge chutea ia liated aa contributory to aub-major accident (#5-58) involving eye irritation from PgSj dust and HaS exposure from hydrolyzed PgSj during maintenance on Thio Acid reactor. P2S5 charging ayatem being evaluated for modification of charge valvea.
ENGINEERING DESIGN AND SERVICES
Mechanical/Electrical/Inatrument Deaign and Drafting
J. C. Price. J. A. Veazey,
R. V. Carliale. R. L. Brewer. J. K. Rennie. J. Childreaa. (W. F. Taffeej
Inatrument and electrical phaae of Santowax-R Still Control. (APE 3OI6 - $33M) was atarted up aucceaafully on 5/27/69. Final check-out and calibration targeted for completion by 6/1/69.
A hydrogen aulflde (HaS) monitor haa been placed on order (Accident inveatigation #5-68). Delivery ia expected in 90 daya. A plant teat will be made to determine if the unit ia auitable for uae in the Niran department.
The deaign for the Plant Fire Alarm (AFE 2575 - $2.9M) ia being reviaed. The new revision, a combination of Monaanto and Bell Telephone equipment, will provide a better overall ayatem than the one originally planned. Final deaign tranamittal ahould be made in June.
A safety and aecurity review for the flaaking and storage of mercury obtained from the Dismantling and Removal of Chlorine Manufacturing Facilities at Anniston (AFR 3214) was held on 5/15/69.
Revisions and dismantling in Building 8 A to provide desk apace for new employees started in mid May. Delivery of partitions and shelving being expedited by Pur chasing. Additional desks and chairs required have been received. Improved lighting provided for Pollution Control Engineers' area.
Projects approved during May:
Provide Fire Pump Capacity Check Equipment (AFE 3227 - $4.1M).
Review drawings were completed for the following projects:
Parathion Recovery Teat (AFE 3245 - $6.^0 Alcohol Separation (Niran) (AFE 3256 - $ to be det.)
DSW 014890 STLCOPCB4003266
Company Confidential 8.
ENGINEERING DESIGN AND SERVICES (Cont'd)
Construction drawings were completed for the following projects:
Alter Therminol System in Solid Aroclor (AFE 2949 - $121), provide offices for new T5D Personnel (AFE 3212 - $3.6M), Liquid Aroclor still Debottleneck (AFE 3O93 $4.5M), Bi-<t Cooling Tower Treatment (3155 - $3.6MO, Capacitor Relocation (AFE 3184 - $18.1M C11.1M transferred equipment U), Niran Tank Farm Area Lighting (AFE 3^24 - $7M), Bi-0 Tank Farm Lighting (AFE 3204 - $0.7M), Upgrade Intermediate Dock at Niran (AFE 2934 - $11.3M C3 docks^).
UTILITIES ENGINEERING J. C. Price, L. 0. Chambers (W. F. Taffee)
Forwarded revised project premise for use of Well Water @ Niran Jets. Estimated savings were increased from $6000 to $8000 per year. Trans mitted design packages for Capacitor Relocation and Improve Biphenyl Cooling Tower Treatment projects. Relocation of the capacitors is to be completed early in June with the savings of $10,800 per year to start in July. Preliminary efficiency studies of the Biphenyl Furnace and Therminol Furnaces in Aroclor, Santowax were completed.
PLANT IMPROVEMENT G. C. Goodwin (W. F. Taffee)
AFE forwarded for approval, paving Duncan Street South (AFE 3243 $1500). Design packages forwarded for alteration to Building 28-A (AFE 3212 $3600) and drain pad PNP Item 216 (AFE 3222 - $1500) project approved in May, HC1 area drainage (AFE 3221 - $1900).
POLLUTION CONTROL E. G. Wright (W. F. Taffee)
Community and Government Relations
Governmental Relations
TSD Objective F-2
The prepared Alabama Air Pollution law, which is backed by the Associated Industries of Alabama, is being criticized by Health Department and Conservationist sources as being an industry-oriented bill. The "Anti's" are also quoting HEW as saying that the bill would not meat their standards.
Community and Governmental Relations
Complaints
TSD Objective F-2
Received two air pollution complaints during May. They were aggravated by the weather, l.e. no wind plus high humidity prevented the dispersion of S02 fumes.
DSW 014891
STLCOPCB4003267
Company Confidential 9.
POLLUTION CONTROL (Cont'd)
Waste Audita
Pollution Abatement
TSD Objective F- ^
Plan outlined in memo to Paul Hodges 5/12/69 being followed and la on schedule. Waste audits in the aroclor and HC1 departments were started during May. Visual inspection of Snow Creek for visible "pockets" deposits of liquid aroclor started, with completion by 7/1. Samplers will be Installed at two more points in the Aroclor department as soon as repairs are completed on the sewer.
Waste Treatment
All plant wastes were effectively treated during May. However, the Parathion department did have some downtime due to a plugged drain in the north hold tank. Average dally values for Monsanto's effluent are as follows:
Average Daily
Specifications
PNP 1.0 ppm
5 ppm
COD
94.9 ppm
^ 200 ppm
Parathion
.14 ppm
1.0 ppm
BOD
No Data
^200 ppm
DSW 014892 STLCOPCB4003268
.Company Confidential 10
PROCESS AND QUALITY ANALYSIS W. B. Dunlap
Quality
The Plant Quality Score was 87.5, up 3*5 from April with YTD score of 90.0 against a target of 95.0 minimum. Strong quality improvements have been made in P2S5, HB-40, Aroclor 5460. Aroclor 1242 shows a wider spectrum of ^ chlorinated isomers. Free chlorine in Muriatic has risen sharply since _____chlorine plant shutdown.
PNP - Monitor
Potential Savings
TSD Objective
Critical Variables
$60,000
C-3
__________________________________________________________ Job 879_________________
The 30-day demonstration of the new PNP reactor depressurization control system is underway. In spite of very high solids no pluggage has occurred. Depressuri zing cycles are on target ( 22 minimum average). Solids have now dropped to normal, without determination of the causes for high level having been made.
Manpower Lamar Murphree joined the P&QA group May 15th.
DSW 014893 STLCOPCB4003269
) PLANT LABORATORIES G. W. Miller
Company Confidential
11.
PROCESS RESEARCH AND DEVELOPMENT J. T. Bell
A laboratory effort of 55 mandays was expended on projects outlined in the 1969 PR&D Program including the expanded study of Sulfur Recovery. The remaining mandays were used for the Hydrogen Purification Unit start-up and on miscellaneous analytical services.
p-Nltrophenol
Reduce Cycle Times
W. H. Howard
The project involving PNP Reactor improvements is on schedule as per the revised work plan issued 5/23/69. The necessity of developing a continuous HB-40 process will postpone the rate studies as planned for the PNP reactor. A PR&D report is to be Issued by 6/18/69 covering the entire PNP project started in January. A completion date of 8/1/69 was forecast in the 1969 PR&D Program.
Sulfur Recovery
Sulfur Refinement for ReuseI. Ransaw______
The study has progressed according to the original work plan and is over 80% completed. A work plan revision was published 5/28/69 with the project to be reported by 6/16/69. This Investigation has been continued past the original planned completion date of 4/1/69.
Blend Scavenger
Improved Aroclor
Refinement (Aroclor)Electrical PropertiesJ. L. Brown
A work plan was issued on 5/22/69 to cover the study for the up-grading of Aroclor-phenyl glycidyl ether blends via absorptive column treatment. Work is scheduled for completion by 7/3/69.
Parathion Isomer Reduction
Improve Yields
G. L. Arnett
Laboratory studies have been reported in the PR&D report dated 5/6/69. The issuance of a follow-up work plan will be delayed until the prepa ration of a sales sample of Low Color Aroclor 5460 has been completed. The study of Thlo Acid Chlorinator Chlorine Distribution and Temperature Improvements is being combined with this project.
Hydrogen Purification Unit Start-up
Purified Hydrogen for HB-40
J. L. Brown
Construction and start-up was completed on the target date of 5/1/69 with excellent results. Revisions are scheduled for the week of 6/2/69 to permit the burning of purge Hydrogen in the Biphenyl Tubular Units.
DSW 014894
STLCOPCB4003270
PLANT LABORATORIES (Cont'd)
.Company Confidential 12
ANALYTICAL AND QUALITY CONTROL S. 0. Kemp
Aroclor
Analytical equipment for electrical quality measurements on Aroclor will be completed this month.
Complaint Report
Quality
Number
Material
Cus tomer
Reason
3-A-69 4-A-69 5-A-69
Aroclor 1242 Montar 5 Aroclor 5460
Essex Corp. Philip Carey Corp. Yates Mfg. Co.
Moisture Content Particle Size and Solubility Particle Contamination
YTD Quality Complaints/100 Shipments 0.17 Target 0.20
DSW 014895 STLCOPCB4003271
)
Company Confidential
COMMUNITY RELATIONS. PERSONNEL. RECRUITING. AND DEVELOPMENT
13-
Personnel
1. J. L. Murphree joined TSD as Process Quality and Analysis Technician under W. B. Dunlap.
2. J. C. Landvehr visited the refinery at El Dorado, Arkansas on the Innovation Exchange Program May 14 and IS.
3. 0. J. Norris was promoted to Production Supervisor at the Nitro Plant.
4. J. L. Brown was promoted to Research Chemist II effective 6-1-69.
5. J. W. Mattern rejoined the TSD Department on May 15 reporting to V. R. Haupt.
6. 0. J. Norris and G. L. Arnett cleaned up a Parathion spill at Edinburg, Texas, week of May 5.
7. G. L. Arnett visited Dr. Scott Tucker in St. Louis, Monday, May 12, to discuss analytical procedure for determination of Aroclor in waste water.
Development
1. Dr. J. Bruce Duncan of the New Enterprises Division presented a seminar to 25 Anniston Plant personnel covering Monsanto developed instruments for process measurement and control. May 12, 1969.
2. A. G. McCarty, S. 0. Kemp, J. C. Price, G. W. Miller and W. F. Taffee attended a refresher course in Coaching and Appraisal Interviews conducted by Mr. Ed Pipkin at the Oxford Holiday Inn, May 27 and 28.
3. G. W. Miller and J. C. Landwehr attended Personnel Management course in St. Louis, May 21 and 22.
4. W. B. Dunlap, D. W. Dudley, C. R. Mcllwain and T. W. Lawrence spent week of May 5 at the Holiday Inn attending the "Management Process" course taught by Connie Eastman.
Visitors
1. J. E. Smith and J. E. Springgate, Plasticizer Business Group, visited May 8 and 9.
2. R. S. Yates from CED visited to discuss the Solid Aroclor expansion. May 14 and 15.
DSW 014896
STLCOPCB4003272
PROCESS IMPROVEMENT
DISTRIBUTION OF TIME BY TECHNICAL SERVICE Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec.
NEW PRODUCTS
PLANT IMPROVEMENT
ASSIST OPERATIONS
SPECIAL. ENGINEERING SERVICES
TECHNICAL MANPOWER
MISCELLANEOUS ACTIVITIES
AND ABSENCES
OSH 014897 STLCOPCB4003273
IN MAINTENANCE
FOR CONSTRUCTION
600 500 400 300 200 100
00
IN MAINTENANCE COMPLETED
NOT CLOSED
PROJECTS SUBMITTED
FOR APPROVAL
CaO
ao
ho
cazo 600
<
C=O3 o
500
H Z 400
300
200
100 00
APPROVED PROJECIS IN TSD
TSD PROJECT SUMMARY
--
DSW 014898 STLCOPCB4003274
laboratory ad:;i::i5tratio:: I
ANALYTICAL SAMPLES
60 1967 --. 1968 J J F M A M J j A S 0 N n
56 52 48 44 40 t5V4S Vi
11
1
1
1n
1 1^
/A_
d
.
1 '[\// >\ 1 V _____ mz
i
ANALYTICAL MANPOWER
Manpower/sample
--1-------- 1--
1^ 1
11.00 10.00
$/Manhours
9.00 8.00 7.00
1
j 1* i 1 ____ !____ _J____
V. Total Plant Operating Cost
Overtime 7.
STLCOPCB4003275