4 UNION CARBIDE CORPORATION
CENTRAL RESEARCH AND ENGINEERING TECHNOLOGY HEALTH, SAFETY AND ENVIRONMENTAL TECHNOLOGY
SOUTH CHARLESTON TECHNICAL CENTER
BUSINESS CONFIDENTIAL
March 11, 1938
TO:
D. A. Boggs - 380 J. N. Dermit. - 510 S. E. Robinson - 519 I. McNaughton - 508 E. A. Osby - 512 M. A. Patel - 511 P. Pelletier - 503 K. D. Stotler - 306 B. Sylvester - 312 W. J. Vincent - 514 A. P. Yalcinkaya - 515
to *d
COPY:
L. E. Calvert - Houston C. C. Neely - 511 J. E. Neff - 511 P. R. Kavasmaneck - 511
FROM:
T. E. Hanning - 511
SUBJECT:
Need for Personal Protection When Cutting or Removing Asbestos-containing Gaskets or Packing
On behalf of the Asbestos Phaseout Task Group, I request your help in determining the need for personnel protection when cutting or removing asbestos-containing gaskets or packing. Your response will be used to formally address this concern as stated on page 2 of Attachment A, Phaseout Use of Asbestos-containing Materials in Work Place, issued by Mr. J. E. Sanders on January 6. Please answer the following questions and send your responses to me by April
8.
1. Do you have industrial hygiene monitoring data for field exposure during the cutting or removal of asbestos-containing gaskets or packing? If yes, were employees overexposed with respect to the OSHA action level or permissible exposure limit on an eight hour time -weighted average basis? If no, do you have plans to gather such monitoring data?
2. Does your location have a written maintenance procedure describing the proper methods for the cutting or removal of asbestos-containing gaskets or packing? If yes, what type of abatement methods are required when cutting or removing asbestos-containing gaskets or packing? If no, do you anticipate an active role in developing such a procedure with your maintenance department?
/
t
~~t- UCTC 16966
PLAINTIFF'S EXHIBIT
4 Page 2
3. Is it a practice at your location to wet and/or use glove bags before cutting or removing asbestos-containing gaskets or packing?
4. What is your professional opinion on the need for personnel protection-during the cutting or removal of asbestos-containing gaskets or packing?
DISCUSSION
The Manufacturing Council has accepted a proposal by the Asbestos Phaseout Task Group to discontinue the purchasing of asbestos-containing materials after January 1, 1989. Gasketing and packing have been identified as the high-priority issue since the purchasing of asbestos-containing insulation has been discontinued since 1976.
The Task Group is currently studying the need for development of a personnel protection policy when cutting or removing asbestos-containing gaskets and packing. As a reference for this study. Appendix G of 29 CFR 1926.58, OSHA's final rule for exposure to asbestos fibers in the construction industry, is included as Attachment B. This appendix is considered non-mandatory when employers choose to comply with all of the requirements of 1926.58. However, it is mandatory when employers wish to be exempt from paragraphs (e)(6) and (f)(2)(ii)(B) of 1926.58. These paragraphs normally require negative-pressure enclosures and initial monitoring when the exposure of workers to concentrations of asbestos fibers may exceed the action level.
When employers choose to follow Appendix G during small-scale, short duration renovation or maintenance tasks involving small-amounts of asbestos-containing materials, the requirements for negative-pressure enclosures and initial monitoring are replaced with other abatement methods. These include the use of glove bags, specific methods for the removal of an entire asbestos-covered pipe or structure, and the construction of mini-enclosures.
Whenever feasible, and regardless of the abatement method to be used (e.g. . removal, enclosure, use of glove bags). Appendix G requires wet methods during small-scale, short duration activities. Handling asbestos materials wet is one of the most reliable methods of ensuring that asbestos fibers do not become airborne and hazardous.
Sincerely,
6*.
TEH
Terry E. Hanning 511/2000/3328 Unicom 8-721-5903
>
~^r<>
UCTC 16967
Central Research and Engineering Technology Technical Center
Post Office Box 8361 Building 2000
South Charleston, WV 25303
January 6, 1988
TO: Attached Distribution List
COPY TO: Attached Distribution List
SUBJECT: Phaseout Use of Asbestos-Containing Materials In Work Place
Gentlemen:
As you are aware, asbestos Is a potential human carcinogen and has received significant regulatory attention. In an effort to address the Implications for Chemicals and Plastics concerning the continued use of asbestos-containing materials In the work place, the Manufacturing Council requested that a Task Group be appointed to evaluate the Issue and to recommend a course of action for Chemicals and Plastics.
The key recommendation In the Task Group proposal to the Manufacturing Council was that no asbestos-containing material be purchased after January 1, 1989. The recommendation was accepted and the Task Group was then chartered to develop Implementation plans. It Is Important to note that neither the Task Group nor the Manufacturing Council recommend retrofitting, unless the structural Integrity of the asbestos material had been compromised; the plan Is to discontinue purchasing only.
Early work by the Task Group Identified gasketing and packing as the high-priority Issue since the purchase of asbestos Insulation had already been discontinued. The Task Group determined that UCC's GRAFOILTM to be the designated replacement for asbestos-containing gaskets and packing In most applications. It Is recognized that GRAFOILTM has a higher Initial cost; however, when disposal costs alone are considered, asbestos-containing gaskets and packing cost Union Carbide considerably more than the GRAFOIL1" counterparts.
/
UCTC 16968
J >>
A. S. Amatangelo, et al January 6, 1988 Page Two
The handling costs of asbestos-containing products have been significantly affected by the June, 1986, OSHA ten-fold reduction In allowable exposure levels from 2 flbers/cc to 0.2 flbers/cc, with an action level of 0.1 flbers/cc. At the request of the Task Group, work Is under way to determine If personnel protection Is required when cutting or removing asbestoscontaining gaskets and packing.
The Piping Technology Skill Center In Central Engineering Is In the process of revising the Valve and Piping Specifications to' reflect the change to GRAFOIL" products. Revisions are currently being Issued, and by early In 1988, all Valve and Piping Specifications revised to Identify the replacement GRAFOIL"1 gaskets and packing will be Issued. Thus at this time, each location will have the needed Information to develop a plan to completely phase out the use of asbestos-containing gaskets and packing.
In this period of transition, locations will need to train their people In the use and Installation of GRAFOIL" gaskets and packing. To achieve this most efficiently, they can use a videotape prepared by the UCC Specialty Products Group, Carbon Products, for use In training Installers. Karl Schmidt (216-529-3902) In Specialty Products, Cleveland Office, can provide Information and assistance.
The Task Group has now turned Its attention to Identifying asbestoscontaining products other than gaskets and packing. As the work of the Task Group progresses, we will keep you Informed. Feel free to contact any one of the members for more Information or further discussion.
Team
UNICOM
Function
C. C. Neely L. E. Calvert S. W. Clark G. B. Elder R. W. Engle T. E. Hanning M. E. Socotch
8-721-5224 8-529-6423 8-721-4247 8-721-4511 8-721-4406 8-721-5903 8-721-3053
Chairman Manufacturing Services Health and Safety Materials Valve and Piping Health Technology Purchasing
Also, please share this Information with others In your organization who may be Impacted by this program.
Very truly yours.
JES:he
5221 Y
3^ E. Sanders
UCTC 16969
~^r-
DISTRIBUTION LIST
TO: A. S. Amatangelo P. J. Braeger D. L. Brucker
R. Dodge S. J. Footer R. E. Gardner 0. L. Gorls T. Harrison H. V. Hooper W. L. Jenkins
W. G. Lilly, Jr. W. G. Llndley R. G. Link V. G. Long R. G. March
R. T. Marold K. K. Morlock J. Nadeau H. Ortiz L. W. Phalr F. S. Provenzano G. L. Sanders R. W. Scoular J. A. Shaevel W. J. Simmons H. Torrellas V. F. Vlllanl E. T. Voss P. F. Wolfe
COPY TO:
R. L. Baldwin M. A. Blessing W. D. Bradbury L. E^. Calvert G. H. Coppala J. B. Evans R. E. Graebert D. E. Heath J. G. Keeler H. P. Krog D. Llebesklnd
J. E. Liana D. C. Macauley W. F. Merritt J. L. Mlchell C. C. Neely B. G. Perry D. M. Rasmussen S. W. Turlcchl R. Van Mynen G. A. Viera A. Walker
/
J
UCTC 16970
.. Federal Register / Voi. 51. No. 119 / Friday. June 20.. 1980 / Ruies and Regulations
22785
Appendix G 10 5 19C6.S8--Work Practices and Engineering.Controls for Smad-Scatc.
Short-Ouration Asbestos Renovation and
Maintenance Activities--Non-Mandatory
--Use of Glove bags --Removal of entire asbestos insulated
pipes or structures --Use of mini-enclosures
This appendix is no! mandatory, in that
Enclosure of asbestos materials: and
t onsirur.iion industry employers may choose
Maintenance programs.
to comply with all of the requirements of
This appendix describes these controls and
OSMA's final rule for occupational exposure to asbestos in.'thc construction industry. :
work practices in detail.
' ..
1926.58. However, employers wishing to be Preparation of the Arec Before Renovation or
exempted from the requirements of
Maintenance Activities
paragraphs (e)(6) and tO{2J(ii)(Z7) of 19C6.58-
shall comply with the provisions of this
appendix when performing small-scale, shortduration renovation or maintenance activities. OSHA anticipates that employers
\
I
(
The first step in preparing to perform a
small-scale, short-duration asbestos renovation or maintenance task, regardless of the abatement method that will be used, is the removal from the work area of all objects
in the elcctricaL carpentry- utility, plumbing. <<nd interior construction trades may wish to .ivail themselves of the final standard s exemptions for small-scale, short-duration
l that are movable to protect them from asbestos contamination. Objects that cannot be removed must be covered completely with a 6-mil-thick polyethylene plastic sheeting
renovation and maintenance operations.
before the task begins. If objects have
[>cftuition of S/nof/-Stoic. Short-Onration \ctivities
already been contaminated, they should be thoroughly cleaned with a High Efficiency Particulate Air (HEPA) filtered vacuum or be
For the purposes of this appendix, smnll- ale. short-duration renovation and
wet wiped before they are removed from the work area or completely encased in the
tiaintenance activities arc tasks such as. but plastic
ol limited to:
Removal of asbestos-containing
We/ Methods
sulation on pipes:
Whenever feasible, and regardless of the
Removal of small quantities of asbestos- abatement method to be used (e.g.. removal,
r ntaining insulation on beams or above
enclosure, use of glove bags), wet methods
> ilings:
must be used during small-scale, short
Replacement Gf an asbestos-containing
duration maintenance and renovation
?kct on a valve:
activities that involve disturbing asliestos-
installation or removal of a small section containing materials. Handling asbestos
' drvwall: Installation of electrical conduits through proximate to asbestos-containing titcrials.
Evidence in the record (see the Summary d Explanation section of the preamble for ragraph (g). Methods of Compliance, for
ific citations) suggests that the use of tain engineering and work practice ntrols is capable of reducing employee tposures to asbestos to levels below the al standard's action level (0.1 f/cc). veral controls and work practices, used 'her singly or in combination, can be ployed effectively to reduce asbestos posures during small maintenance and novation operations. These include:
materials wet is one of the most reliable methods of ensuring that asbestos fibers do not become airborne, and this practice should therefore be used whenever feasible. As discussed in the Summary' and Explanation section of the preamble for paragraph (g). Methods of Compliance, wet methods can be used in the great majority of workplace situations. Only in cases where asbestos work must be performed on live electrical equipment, on live steam lines, or in other areas where water will seriously damage materials or equipment may dry removal be performed. Amended water or anolher welting agent should be applied by means of an airless sprayer to minimize the extent to which the asbestos-containing material is disturbed.
Wei methods;
Asbestos-containing materials should be
Removal methods
wetted from the initiation of the maintenance
or renovation operation and wetting agent? should be used continually throughout the work period to ensure that any dry' asbestoscontaining material exposed in the course of the work is wet and remains wet until final disposal.
Removal ofSmall Amount of AsbestosContaining Materials
Several'methods cab be used fo remove small amounts of asbestos-containing materials during small-scale, short-duration renovation or maintenance tasks. These include the use of glove bags, the removal of an entire asbestos-covered pipe or structure, and the construction of mini-enclosures. The procedures that employers must use for each of these operations if they wish to avail themselves of the final rule's exemptions are described in the following sections.
Clove Bags
As discussed in the Summary and Explanation section of the preamble for paragraph (g). Methods of Compliance, evidence in the record indicate that the use of glove bags to enclose the work area during small-scale, short-duration maintenance or renovation activities will result in employee exposures to asbestos that are below the final standard's action level of o.l f/cc This appendix provides requirements for glovebag procedures to be followed by employers wishing to avail themselves of the standard's exemptions for each activities. OSHA has determined that the use of these procedures will reduce the 8 hour time weighted average (TYVA) exposures of employees involved in these work operations to levels below the action level and will thus provide a degree of employee protection equivalent to that provided by compliance with all provisions of the final rule.
Clave Bag Installation. Glove bags are approximately 40-inch-wide times 64-inchlong bags fitted with arms through which the work can be performed (see Figure G-t(A)|. When properly installed and used, they permit workers to remain completely isolated from the asbestos material removed or replaced inside the bag. Glove bags can thus provide a flexibile, easily installed, and quickly dismantled temporary small work area enclosure that is ideal for small-scale asbestos renovation or maintenance jobs.
/
UCTC 16971
(
*23786
/ Fetferal Register / Vol. 51, .Na. 119-/ Friday; June 20. 1986 / Rules and Regulatipns , .
bag is attached to the pipe by folding the
open edges together and securely sealing
d
them with tape. AH openings in the glove bag
must be scaled with duct tape or equivalent
material The bottom seam of the*glove bag
must also be sealed with duct tape or
equivalent to prevent any leakage from the
.bag that may result from a defect in the
bottom
{Figure G--1(B)).
(2) The employee who is performing the
Tb
asbestos removal with the glove bag must
doo a half-mask dual-cartridge HEPAj equipped respirator respirators should be
worn by employees who are in close contact
With the glove bag and who may thus be .
.
exposed as a result of small gaps in the
-
seams of the bag or boles punched through:. .
the bag by a razor knife or a piece of wire .
f
(A)
(B)
mesh. (3)The removed asbestos material from-the
`
pipe oc other surface that has fallen into the
enclosed bag must be thoroughly wetted with
a wetting agent (applied with an airiest ,.
sprayer through the pre-cut port provided in
most gloves bags or applied through a small
hole cut in the bagl (Figure G-t(C)).
(4) Once the asbestos material has been
thoroughly wetted, it can be removed from
the pipe, beam or other surface. The choice of
tool to use to remove the asbestos-containing
material depends on the type of materiaFto 5 j ^
be removed. Asbestos-containing materials
i are generally covered with painted canvas and/or wire mesh. Painted canvas can be-eut
with a razor knife and peeled away from the
asbestos-containing material underneath.
Once the canvas has been peeled away, the
asbestos-containing material underneath ma>
be dry. in which case it should be re-sprayed
with a wetting agent to ensure that it
generates as little dust as possible when
removed. If the asbestos-containing material
is covered with wire mesh, the mesh should
be cat with nips, tin snips, or other
appropriate tool and removed.
Flgun G-t. Diagram. Showing Proper Use of Glovo Bags in Small-Scale, Short-Doraboo Maintenance and Renovation Operatieos.
A wetting agent must then be used to spra any Layerof dry material that exposed beneath the mesh, the surface of the stripper
underlying structure* and the insideof the
These bags, are single use control devices
(4) Bridging encapsulate (a paste-like
glove bag.
that are disposed of at the end ofeach job.
substance forcoating- asbestos) to seat the
(5) After removal ofthe layerof asbestos-
The bags are made of transparent 5-mil-thick rough edges ofany asbestoscontaining
containing material the pipe or surface friur
polyethylene plastic with arms of Tyvck *
materials that remain within the glove bag at which asbestos has been removed must be
material (the same material used to make the the pouits of attachment after the rest of the thoroughly cleaned with a wire brush and
disposable protective suits used in major
asbestos has be removed;
wet wiped with a wetting agent until na;
asbestos removal, renovation, and demolition
(5) Tools such as razor knives, nips, and
traces of the asbestos containing-material e
operations and In protective gloves). Glove
wire brushes (or other tools suitable for
be seen.
bags are readily available from safety supply cutting wire, eta);
(6) Any asbestos containing insulation
stores or specialty asbestos removal supply
(6) A HEPA filter-equipped vacuum for
edges that have been exposed as a result of
houses. Glove bags come pre-labeled with the evacuating the glove bag (:o minimize the
the removal or maintenance activity must b
asbestos warning label prescribed by OSHA release of asbestos fibers) during removal of encapsulated with bridging encapsulant to
and EPA for bags used to dispose of asbestos the bag from the work area and for cleaning ensure that the edges do not release asbesh
waste.
any material that may have escaped curing
fibers to the atmosphere after the glove bag
Glove Bag Equipment and Supplies.
the installation of the glove bag: and
has been removed.
Supplies and materials that are necessary to
(7) HEPA-equipped dust cartridge
(7) When the asbestos removal and
use glove bags effectively include: (1) Tape to seal the glove bag to the area
from which absbestos is to be removed: (2) Amended water or other wetting agents; (3) An airless sprayer for the application of
the wetting agent;
* Mention of trade names or commercial products docs not constitute endorsement or recommendation for use.
respirators for use by the employees involved in the removal of asbestos with the glove bag.
Glove Bag Work Practices. The proper use of glove bags requires the following s;eps:
(1) Glove bags-must be installed so that ' they completely cover the pipe or other
structure where asbestos work is to be done. Glove bags are installed by cutting the sides
of the glove bag to fit.the size of the pipe from which asbestos is to be removed. The glove
/
encapsulation have been completed, a ^li'Encbsu.
vacuum hose from a HEPA filtered vacuum^
must be inserted into the glove bag through^
ms*
the port to remove any air in the bag that ror*1
may contain'asbestos fibers: When the air ,. * s;
has been removed from the bag. the bag a e.ther1
should be squeezed tightly (as close to the e 0 endo
top as possible}, twisted, and sealed with. " ' a ^nni-*
tape, to keep the asbestos materials safely fea * nere
the bottom of the bag. The HEPA vacuum <*slos maint
^ performet
UCTC 16972 >
>- Federal Register / Vol. 51. -No. 119 / Friday. }une 20.. 1986 / Rules and Regulations
-. 22787
ogt}>* teaUng s. iglov-ba$ quivaleo^*,' 'love bag,."
* g* .from the.'
(hen be removed from (he bag and the glove <
bag itself can be removed from the work .area to be disposed of property (Figure C-l(DJ).
niing.u>e^i sag must ~ / ' EPA-' should beg. .< lease contact.
c ol aaire^ * * b;
jaial.feonLthe UeninUxjfce, y wetted with sslriess..^t providedla ough small (C)V at has been. moved from u The choice of itoa-contaJning jf materiiHo .... mstensAs intedcenrS avas canbecut
Top View SI de V 1 ew
1 1 1 1 1 1 1 1
1__
away frs the underneath. .
eled away; the underneath may d be re-sprayd
e that it ' Bible when (siniQg materia*
lemeab should
: other-
4. " ''?r ! be-used to spy
it f* estpesed.J ae-of *e stripped e-inside-of the
. .-.ill'
ayerofasbest^e orsurface fid01 ;moved tnust be
^fre-brash and igent until no'/p*"
aining-'awlerf^ "
ung insulation .sad as a result ot x activity must be 2 encapsulantto *i releaseasbestot
tfter the glove bag
Work Area
|-- 1
11
II II II Change Roou II II II II It 11
1 _______ j______ L
1
Plastic curtain
Plastic
Xcurt*In
Yacuua hole.
Plastic Cur ta In
/
Change Roou
II
I Caution I iContalnst I Asbestos I
Figure G-2. Schematic of MuiKodawire
Yacuua hose
-eraovat and
.
completed. a - uu-Enc/osures
A filtered.vacuum [n some instances, such as removal of
glove bag
bestos from a small ventilation system or
ir in the bag tn vn a short length of duct, a glove bag may ers- When .the be either large enough or of the proper Jie bag. the bag^ ^ape to enclose the work area. In such
ly (as
a mini-enclosure can be built around
.. and sealed My iiarea where small-scale, short-duration
ds materials* `^^estos maintenance or renpvation work is
he N[a:.-. be performed (Figure G-2). Such an
enclosure should be constructed of 6-mil-
thick polyethylene plastic sheeting and can
be small enough to restrict entry to the
asbestos work area to one worker.
For example, a mini-enclosure can be built
in a small utility closet whea asbestos-
containing duct covering is to be removed.
The enclosure is constructed by:
(l) Affixing plastic sheeting to the walls
with spray, adhesive and tape:
-
(2) Covering the floor with plastic and scaling the plastic covering the floor to the plastic on the walls.
(3)-Scaling any. penetrations such as pipes or electrical conduits with tape: and
(4) Constructing a small change room (approximately 3 feet square) made of 6-mil* thick polyethylene plastic supported by 2.fnch by 4-iach lumber (the .plastic shoujd be . ' attached to the lumber supports with staples or spray adhesive and tape). .
The'change room should be contiguous to the mini enclosure, and is necessary to allow the worker tovacuum off his protective coveralls and'remove them before leaving the work area. White inside the enclosure, the worker should 'wear Tyvok4- disposable coveralls and-use the appropriate HEPA . filtered dual cartridge respiratory protection.
The advantages of mini-enclosures are that they limit the spread of asbestos contamination. reduce the potential exposure of bystanders and other workers who may be working inadjacent areas, and are quick and easy to instaUL The disadvantage of mini enclosures is that they may be too small to contain the equipment necessary to create a negative pressure Within the endosure: however, the double layer of plastic sheeting will serve to restrict the.release of asbestos fibers to the area outside the enclosure.
Removoi ofEntire Structures
When pipes are insulated with asbestoscontaining materials, removal of the entire pipe may be more protective, easier, and more cost-effective than stripping the asbestos insulation from the pipe. Before such a pipe Is cut the asbestos-containing insulation must be wrapped with 6-mil polyethylene plastic and securely, sealed with duct tape or equivalent This plastic covering will prevent asbestos fibers from becoming airborne as a result of the vibration created by the power saws used to cut the pipe. If possible, the pipes should be cut at locations that are not insulated to avoid disturbing the asbestos. If a pipe is completely insulated with asbestos-containing materials, small sections should be* stripped using the glovebag method described above before the pipe is cut at the stripped sections.
Enclosure
The decision to endose rather than remove asbestos-containing material from an area depends on the budding owner's preference, i.e- for removal or containment. Owners consider such factors as cost effectiveness, the physicat configuration of the work area, and the amount ef traffic in the area when determining which abatement method to use.
If the owner chooses to endose the structure rather than to remove the asbestoscontaining material insulating it a solid structure (airtight watls and ceilings) must bo built around ike asbestos covered pipe or structure to prevent the.release of asbestoscontaining materials into the area beyond the. enclosure and to prevent disturbing these
* Mention of trade names or commercial products does not constitute endorsement or rtrcommendation for c$e.
UCTC 16973
J ~^r<>
<22788
Federal Register / Vot. 51, No. 119 / Friday, June 20,. 1986 / Rules ar\d Regulations
J
materials by casual contact during future maintenance operations.
Such a permanent {ic.. for the life of the betiding) enclosure should be built of new construction materials and should be impact resistant and airtight. Enclosure walls should t>e made of tongue-a;d-gr<>oee boards, boards with spine joints, or gypsum hoards having taped seams. The underlying structure must be able to support the wcigftt of the enclosure. (Suspended ceilings with laid in panels do not provide airtight enclosures and should not be used to enclose structures covered with asbestos-containing matenals.) All joints between the walls and ceiling of the enclosure should be caulked to prevent the escape of asbestos fibers. During the installation of enclosures, tools that are used (such as drills or rivet tools) should be equipped with HEPA-filtered vacuums. Before constructing the enclosure, all electrical conduits, telephone lines,, recessed lights,, and pipes in the area to be enclosed should be moved to ensure that the enclosure will not have to be re-opened later for routine or emergency maintenance. If such lights or other equipment cannot be moved to a new location for logistic reasons, or if moving them will disturb the asbestos-containing materials, removal rather than enclosure of the asbestos-containing materials is the appropriate control method to use.
Maintenance Program
An asbestos maintenance program must be initiated in all faculties that have asbestoscontaining materials. Such a program should include:
Development of an inventory of .til asbestos-containing materials in the facility;
Periodic examination of all asbestoscontaining materials to detect deterioration;
Written procedures for handling asbestos materials during the performance of smallscale. short-duration maintenance and renovation activities:
Written procedures for asbestos disposal: and
Written procedures for dealing with asbestos-related emergencies.
Members of the building's maintenance engineering staff (electricians, neating/air conditioning engineers, plumbers, etc.) who may be required to handle asbestoscontaining materials should be trained in safe procedures. Such training should include at a minimum:
Information regarding types of asbestos and its various uses and forms:
Information on the health effects associated with asbestos exposure:
Descriptions of the proper methods of handling asbestos-containing materials; and
Information on the use of HEPAequipped dual cartridge respiratory and other persona! protection during maintenance activities.
Prohibited Activities
The training program for the maintenance engineering staff should describe methods of handling asbestos-containing materials as .veil as routine maintenance activities that are prohibited when asbestos-containing materials are involved. For example, maintenance staff employees should be
instructed;
:\'oi to drill holes in asbestos-containing
materials;
.\\>: to hang plants or pictures on
structures covered with asbestos-containing
materials
Not to sand asbestos-containing floor tile;
Not to damage asbestos-containing
materials-while mo\. ing furniture or other
objects: '
* Not to install curtains, drapes, or . dividers in such a way that they damage asbestos-containing materials:
A'o/ to dust floors, ceilings, moldings or
other surfaces in asbestos-contaminated
environments with a dry brush or sweep with
a dry broom; Not to use an ordinary vacuum to clean
up asbestos-containing debris:
Not '.o remove ceiling tries below
asbestos-containing materials without
wearing the proper respiratory protection,
clearing the area of other people, and observing asbestos removal waste disposal
procedures:
Not to remove ventilation system filters
dry: and
Not io shake ventilation system filters.
Appendix H to $ 2926.58--Substance Technical lafocmatioo for Asbestos, NonMandatory
I. Substance Identification
A. Substance: "Asbestos'* is the name of a class of magnesium-silicate minerals that
occur in fibrous form. Minerals that are included in this group are chrysolite, crocidolite. amosite. anthophyllite asbestos, tremolite asbestos, and actinolite asbestos.
B. Asbestos. tremolite. anthophyllite. and actinolite are used in the manufacture of heat-resistant clothing, automotive brake and clutch linings, and a variety of building materials including floor tiles, roofing felts, ceiling tiles, asbestos-cement pipe and sheet,
and fire-resistant drywall. Asbestos, tremolite. anthophyllite and actinolite are also present in pipe and boiler insulation materials, and in sprayed-oa materials located on beams, in cruwlspaces, and between wails.
C. The potential for an asbestos-containing
product to release breathable fibers depends on its degree of friability. Friable means that the material can be crumbled with hand pressure and is therefore likely to emit fibers. The fibrous orQuay sprayed-on materials used for fireproofing, insulation, or sound proofing are considered to be friable, and they readily release airborne fibers if disturbed. Materials such as vinyl-asbestos Hour file or roofing felts are considered nonfnable and generally do not emit airborne fibers unless subjected to sanding or sawing operations. Asbestos-cement pipe or sheet can emit airborne fibers if the materials are cut or sawed, or Lf they are broken during demolition operations.
D. P^-misstble exposure: Exposure to
airborne asbestos, tremolitc. unihoph\Uite. and actinolite fibers may not exceed 0.2 fibers per cubic centimeter nf air (0.2 f.fcc)
averaged over the 6-hourworkday.
[1. Health Hazard Oata
A. Asbestos. (reoiotite. entiwphyiliffi. and acbnoiite can cause disabling respiratory
disease and various types of cancers if the
fibers are inhaled. Inhaling or ingesting fibers,
from contaminated clothing or skin can lso
result in these diseases. The-symptoms of these diseases generally do not appear for 20
^mply id ac:inolit
or more years after initial exposure.
- Process v
B. Exposure to asbestos, tremolite.
Timings, or
anthophyllite and actinolite has been shown 1 Houseker
to cause lung cancer, mesothelioma, and
cuuming.
cancer of (he stomach and colon.
}
Mesothelioma is a raro cancer of the thin
membrane lining of the chest and abdomen.
Symptoms of mesothelioma include shortness
of breath, pain in the walls of the chest, and/
or abdominal pain.
111. Respirators and Protective Clothing
I- Asbestos 'Serial that i
Asbes'tos noted durin
-noliiion. Contamin; thing.
1- Empty shi
A. Respirators: You are required to wear a respirator when performing tasks that result in asbestos, tremolite, anthophyllite and
actinolite exposure that exceeds the permissible exposure limit |PCL) of 0.2 f/cc. These conditions can occur while your employer is in the process of installing
engineering controls to reduce asbestos, tremolite. anthophyllite and actinolite
exposure, or where engineering controls are not feasible to reduce asbestos, tremolite. anthophyllite end actinolite exposure. Airpurifying respirators equipped with a high- . efficiency particulate air (HEPA) filter can be used where airborne asbestos, tremolite. anthophyllite and actinolite fiber concentrations do not exceed 2 f/cc otherwise, air-supplied, positive-pressure, full facepiece respirators must be used. Disposable respirators or dust masks are not permitted to be used for asbestos, tremolite.
ler exhaust 'tainers for ms are di/fi led.
Vacuum U uld not be c h a fine wat -led waste t
' Process w, uld be wettc er and surfa osable cont
Asbestos-c ved from b
ak-tight 6-m I cardboard d containert Jved while
miners befor elease ofasi ophyilite. an Jiing.
anthophyllite and actinolite work. For effective protection, respirators must fit your
ccess to Info
face and head snugly. Your employer is
Each year, y
required to conduct fit tests when you are
m you of the
first assigned a respirator and every 6 months landard anc
thereafter. Respirators should not be
ion. yourem
loosened or removed in work situations
roper work j
where their use is required
Uos-containi
B. Protective Clothing: You are required to ct use of pro
wear protective clothing in work areas where Your employ
asbestos, tremolite. anthophyllite. and
her you are l
actinolite fiber concentrations exceed the
r your repre
permissible exposure limit (PEL) of 0.2 f/cc to ve employee
prevent contamination of the skin. Where d the results
protective clothing is required, your employer must provide you with dean garments.
red to inform are expose*
Unless you are working on a large asbestos, tremolite. anthophyllite. and actinolite
he or she is i :tions that ar
removal or demolition project your employer must also provide a change room and separate lockers for your street clothes and contaminated work clothes. If you are working on a large asbestos, tremolite. anthophyllite. and actinolite removal or demolition project and where it is feasible to do so. your employer must provide a clean room, shower, and decontamination room consig'jous to the work area. When leaving the work area, you must remove
xposure to % four employe Is of your exj
`nations. The M for at least Is must be ke ymern plus U
our employe xposure and ian or design
-ritten reque*
contaminated clothing before proceeding to 'dix I to i9:
the shower. If the shower, is not adjacent to liance Guide!
the work area, you must vacuum your
life. Anthoph
clothing before proceeding to change the' 'andatory
mom and shower. To prevent inhaling fibers e of Entry in contaminated change rooms and showers, leave your respirator on until you leave the 'ation ingest.
shower and enter the clean change room.
/
> UCTC 16974