Document BRrqK2ZBvNq9vQppnxOkJGdVm
H. K. PORTER COMPANY, INC.
THERMOID DIVISION
DATE.
January 13. 1970
v_
tOCATION.
froivt
Alexander Smith
AT Pittsburgh.__Penna.
subject MEETING - E. K. Porter Representatives of Naval Shin Engineering Center.
ATTENDANCE:
-
B. K- Porter Co., Inc.:
'
Messrs. K. W. Sulscr - General Manager - Asbestos Group:
Alexander Smith - General Sales Manager Asbestos Group:
Prank Williams - Asbestos Specialist:
V. E. Haines - Vice-President - H. K- Porter Co., Inc.
Naval Ship Engineering Center: '
'
Mr. Birnbaum - Head, Coatings & Environmental Control Section:
Mr. Morgenstern - Head, Coatings Unit:
^
Mr. Murad - Insulation & Acoustics:
. Mr. Cherovbrier - Hazardous Materials:
Cmdr. Ryan - Head, Material Development & Applications Office.
PURPOSE:
This meeting was arranged to discuss the uses and applications of Asbestos materials in shipbuilding, with emphasis on the hazardous aspects experienced by their use during installation and overhauling of existing ships and to provide a flow of ideas from both par-ties concerning the best methods to reduce these hazards, and how to implement these improvements to best serve the Naval Shipbuilding Program.
PRESENTATION - HA.VSEC:
Mr* Birnbaum outlined the organizational structure of the group and empha
sized their presence at the meeting did not involve any physiological or
medical aspects
earning the usage of asbestos, but were concerned with the
technical appl'
7 however, they would refer any developments presented
to them invol'
--.th to their Medical Section.
"
Cmdr. Ryan pc recommendatic. and that any : certainly be
/j ?'-, that a report was being prepared by his group making "/3 '"-`.'prove dust or hazardous conditions In Naval Shipbuilding,
cion having a bearing on improving these conditions would every consideration in their recommendations.
January 13, 197
PRESENTATION - H;_JC;L^ORR^iJt_INC;_:
Alexander Smith indicated to the Group the concern by Porter with Asbestos lint and the efforts being made in our plants for our own workers. He pointed out the reductions made in asbestos lint which presently is 5O5S less than the minimum' established by the State of North Carolina.
Frank Williams presented the initial results of asbestos dust count tests heing conducted at Norfolk Naval Shipyard. These tests, are still being conducted. ' It was pointed out initially that-Norfolk in their Araosite end Asbestos cloth cutting operation, with the use of water and dampening of material, had considerably reduced the amount of asbestos dust below the T.L.V. (Threshold Limit Value) of 2 MFPCF (million particles per cubic foot). Copies of this report were circulated ic she preup.
Ifer. Willlam; further pointed out that further tests are being conducted
using H. K. Porter Lint Free Portersite (Araosite) and Lint Free Asbestos
Cloth which will preclude the necessity for dampening the -materials and .
still provide dust levels well below the established minimum. Samples
of lint free Amosite Felt and lint free Asbestos cloth showing the merits-
of this treatment by Porter were distributed to the group.
Z.
It was pointed out during the presentation that present Navy specifications allow for an Amosite Felt containing methods of manufacture conducive to a high amount of lint and dust during the cutting operation.
On previous occasions. Porter has asked that specifications be revised to specify a knitted and lint free type of Amosite Felt.
GENERAL DISCUSSION:
, *
Following the presentations, points of interest were discussed by the group
as follows:
..
The Navy emphasized the need on our part to develop conclusive tests to measure the reduction in lint and that our competitors would be expected to have the sane opportunity to manufacture this material. -
The question concerning the use of materials in shipbuilding would involve
factors of cost, safety, labor-saving, however, a material with 0 hazards
to health would be recommended if all other factors were equal.
:uw
The Navy pointed out that their program did not involve any complete
elimination of Asbestos, but recommendations for safer working conditions
at the various Naval Installations.
.
-3-
January 13, 1970
GENERAL DISCUSSION: (Cont'a.)
Hie Havy emphasized the need to simulate both installation and rip-out tests
- of Asbestos materials and that Quality Control Assurance Tests on complete
shipments would be required rather than plant certification.
Various types of Asbestos materials used in shipbuilding were discussed. Porter emphasized our concern -was with products containing the long fiber Or higher grades of Asbestos fibers. '
A report vill be issued on February 1, 1970 concerning the uses of Asbestos.
It is expected to recommend not using products containing high dusty
asbestos. Ho decision has been made on asbestos cloth at this time.
cohchjsiohs :
-
Based on the presentations and the discussions H. K. Porfer Asbestos Group
vill do the following:
linmediately organize a testing procedure for measuring the Asbestos dust in Amosite Felt and Asbestos Cloth which can be written into Havy specifications. H. K. Porter vill contact HA.VSEC when these testing procedures are ready for presentation.
^
HAVSEC will follow up on tests being conducted by Mr. William Barnhart at Horfolh Kaval Shipyard to further obtain data concerning the use of lint free asbestos.
B. K- Porter vill furnish complete information on all their products by
sending sufficient literature to Cmdr. Ryan and his staff.
. -
*
Hr. Haines vill obtain a copy of tbe February 1, 1970 report when it is
` released and distribute to Porter group.
v. '
AS: ms
Alexander Smith