Document BRQjjwMOydK73b199zzb1dEX4
From: J. M. Sawyer
JHS-172
July 28, 1970
Air Monitoring Program
Representatives of the Laboratory, Process Engineering, and Utilities Department met briefly Thursday, July 23, to discuss the status of the plant air monitoring program and to formulate plans and responsi bilities for future studies. The group agreed to the following:
1. The hydrocarbon analyzer, expected at any time, will be checked out by the instrument development section.
2. The above analyzer should be trailer-mounted, with a portable generator to be skid-mountedjso that the generator can be moved far enough from the analyzer to prevent exhaust interference.
3. A preliminary hydrocarbon survey of the plant will be conducted by Process Engineering, with assistance by the instrument development section and the Laboratory Department.
4. Future studies, location of analyzer(s), and responsibility for its operation will be determined after the preliminary hydrocarbon survey.
5. The Chemical Company environmental maintenance coordinator will be asked to furnish a copy or opinion of all existing and expected regulations concerning air monitoring.
6. The group agreed to meet again after receipt of the above information to formulate future studies, recommend instrument purchases where necessary, etc.
J. M. Sawyer
jed
cc: Frick
McNair - CCCTC
Appel
Maurer
Brandt
Stewart
Hime
Kleppinger - NYO
Lemmons
Cureton - Bay City
Massey
Lanford - Clear Lake
McMahon
DeRose - Pampa
Sanders
Central Files (3) - CCCTC
Smith
Stephens
Storment Wile
010526
CELANESE CHEMICAL COMPANY Chemcel Plant Bishop, Texas
To: From:
Mr. R. H. Maurer
fJ. M. Sawyer
JMS-174
July 30, 1970
Air Monitoring Program
The air monitoring program here at Chemcel is limited to particulate sampling in compliance with dates set forth in the National Air Surveillance Network schedule. Several special studies have been conducted in the past, but these are not routine. In view of the recent Corporate Environmental Control committee request for monitoring forms in use, we need some definitions of our basic position in the field.
The following questions need to be answered:
1. What is our basic attitude concerning those compounds that we know we do not have, i.e., beryllium, florine, etc.? Do we analyze for these routinely, or only when absolutely necessary?
2. What compdunds do we need to be monitoring now? What about 6 months or a year from now?
3. Where several plants have common problems and development work must be done on analytical methods, would it be possible to divide these among the`several locations to eliminate overlapping work?
4. What is your recommendation concerning analytical instruments for such compounds as oxidants?
As you can probably tell, these questions could precipitate a good general discussion. Do you think that we might have a short meeting between the plant coordinators, Dr. Kleppinger, and Mr. Head on this subject of air monitoring? The recent criteria published by H.E.W. have made it apparent that we must work fast to remain in compliance
jed cc: Messrs. Frick
Brandt Lewis McMahon Schweers Head - CC Lanford - Clear Lake Cureton - Bay City DeRose - Parapa Kleppinger - NYO Stewart - CCCTC Central Files (3)