Document BRMarMoVQgqYm4MaBJqqXwJ8m

THE DOW CHEMICAL COMPANY PLAINTIFF'S EXHIBIT DOW-739 TEXAS OPERATIONS ASBESTOS HANDBOOK 2*18*122015 CONTAINS ASBESTOS FIBERS AVOID CREATING DUST CANCER AND LUNG DISEASE HAZARD REVISED, NOVEMBER, 1988 THIS MANUAL IS AN UPDATED EDITION OF THE HANDBOOK PREPARED IN 1972 AND REVISED IN 1977, 1979, 1985 AND 1987. THIS EDITION WAS REVISED BY THE ASBESTOS TASK FORCE DURING THE THIRD QUARTER OF 1988. ASBESTOS TASK FORCE MEMBERS RED AHLICH DARRYL CRAGAR DONNA HICKS JERRY HINOJOSA BUDDY JACKS MARK LARSON KERMIT LICKLIDER WALT NOACK MIKE TOWN GEORGE WILLIAMS ii8 ii2<:01S SECTION I II III IV V VI VII VIII IX X XI XII XIII APPENDIX A INDEX TITLE PAGE PURPOSE 1 HEALTH EFFECTS TRAINING PROGRAM MINIMUM REQUIREMENTS 2 3 DEFINITIONS 4 ASBESTOS AWARENESS 7 ASBESTOS MAINTENANCE PROGRAM 18 ASBESTOS WORK IN PUBLIC BUILDINGS 19 NOTIFICATION OF DEMOLITION OR RENOVATION WORK 20 HAZARD COMMUNICATION PACKAGING FOR DISPOSAL 21 23 MINIMUM REQUIREMENTS GASKET & PACKING HANDLING 24 TRANSITE AND ASBESTOS SHINGLES 26 TRANSITE AND ASBESTOS SHINGLES CUTTING, DRILLING OR ABRADING GLOVE BAGS 28 30 SMALL-SCALE SHORT-DURATION PROJECTS WITHOUT GLOVE BAGS 31 MINI-ENCLOSURES 33 LARGE SCALE, LONG DURATION PROJECTS 34 TYPICAL DECONTAMINATION AREA 36 NEGATIVE PRESSURE ENCLOSURES 39 AUTOMOTIVE CLUTCH & BRAKE REPAIR 40 ASBESTOS SAFETY CHECKLIST 42 ASBESTOS ABATEMENT AUDIT CHECKLIST APPROVED EQUIPMENT 43 45 -1 - ST 0 2 2 4 8 4 4 SECTION I PURPOSE This handbook defines safe handling procedures for asbestos materials used in Texas Operations. The intent is to control personnel exposure to asbestos dust through training, asbestos maintenance programs, safe work procedures, proper use of protective equipment, and by the substitution of non-asbestos containing materials. It is Dow's philosophy to eliminate the use of asbestos where feasible. MAJOR MANAGER APPROVAL IS REQUIRED WHEN USING ASBESTOS MATERIALS IF A SUITABLE ALTERNATE IS KNOWN. Asbestos has been widely used as insulation, structural wallboard, roofing material, etc. Asbestos fibers are currently in use as a mechanical reinforcing matrix in insulation, roofing paper, certain piping systems, gaskets, brake linings, clutch plates, etc. Dow Engineering Specifications were revised in 1970 to exclude asbestos-containing insulation before the enactment of Federal regulations controlling the use and handling of asbestos. The revised OSHA standards (1910.1001 and 1926.58) which became effective July 21, 1986 define the precautions, procedures and controls required for asbestos handling. These standards also define the allowable exposure levels and the manner of determining exposure levels. The National Emission Standard for Hazardous Air Pollutants (NESHAP) also established specific requirements for notification, removal, packaging, transport and disposal of asbestos-containing materials. Violations of these regulations may result in a citation or fine or both. Dow is committed to meeting or exceeding government regulations, to protect the health of personnel. -1- ST0224845 SECTION II HEALTH & ENVIRONMENTAL SCIENCES INFORMATION CENTER POTENTIAL HEALTH EFFECTS ASBESTOS DR-0027-0713 REVISED: 10/14/88 SYNONYMS AMPHIBOLE APPEARANCE: fibrous solid in various colors EXPOSURE GUIDELINES: OSHA PEL is 0.2 fibers (>5 urn) per cc. 8 hr. TWA OSHA General Industry Standard 29CFRI910.1001. OSHA Construction Standard 29CFR1926.58. OSHA Excursion Limit is 1 fiber/cc averaged over a sampling period of 30 minutes. ACGIH TLV is 0.5 fibers (>5 urn) per cc for amosite, Ala; 0.2 fibers (>5 urn) per cc for crocidolite; 2 fibers (>5 urn) per cc for chrysotile and other forms of asbestos, Ala. POTENTIAL HEALTH EFFECTS This section includes possible adverse effects which could occur if this material is not handled in the recommended manner. EYE - Mechanical injury only. SKIN - Mechanical injury only. - Skin absorption is unlikely due to physical properties. INGESTION - Single dose oral LD50 has not been determined. - Amounts ingested incidental to industrial handling are not likely to cause injury; however ingestion of larger amounts may cause injury. ACUTE INHALATION EFFECTS - Excessive exposure to dust causes chronic inflammations of lung tissue and pleural membranes, as well as cancers, in both man and animals. ST0224846 SUBCHRONIC EFFECTS - Prolonged exposure to asbestos dust has been found to cause pulmonary fibrosis (asbestosis), which may be disabling and even fatal. CHRONIC EFFECTS/CARCINOGENICITY - Has been shown to cause cancer in humans. - For hazard communication purposes under OSHA standard 29 CFR part 1910.1200, this chemical is listed as a carcinogen by NTP and IARC. TERATOGENIC EFFECTS - No relevant information found. REPRODUCTIVE EFFECTS - No relevant information found. MUTAGENICITY - Some forms of asbestos have been reported to induce chromosomal changes in tissue culture. -2- SECTION III ASBESTOS TRAINING PROGRAM MINIMUM REQUIREMENTS All employees who handle asbestos must be trained before initial assignment and annually thereafter. The OSHA asbestos standards and all training materials are available to employees upon request. Information will be presented in a manner the employee can understand. The following items must be included in the training program: 1. The health effects associated with asbestos, 2. The relationship between smoking and exposure to asbestos in producing lung cancer, 3. Methods of recognizing asbestos, 4. The quantity, location, manner of use, release, and storage of asbestos and the specific nature of operations which could result in exposure to asbestos, 5. The engineering controls and work practices associated with the employee's job assignment, 6. The specific procedures implemented to protect employees from exposure to asbestos, such as appropriate work practices, emergency and clean-up procedures, and personal protective equipment to be used, 7. The purpose, proper use, and limitations of respirators and protective clothing, 8. The purpose and a description of the medical surveillance program required by the OSHA Standard, 9. A review of the OSHA Standard, including appendices. NOTE: Training Requirement Guidelines A. Initial Training 1. View Asbestos video tape (VT87-I129B) 2. Complete Asbestos Training Guide (IPT) B. Annual Retraining 1. View video tape on OSHA standards (VT87-1129A) 2. Complete Asbestos Training Guide (IPT) Call 409-238-2620 to schedule videotapes and/or 409-238-2467 to obtain the Asbestos Training Guide (IPT). L*18*122013 -3- SECTION IV ACTION LEVEL DEFINITIONS An airborne concentration of asbestos of 0.1 fiber per cubic centimeter (f/cc) of air calculated as an eight (8)-hour time-weighted average. ASBESTOS Chrysotile, amosite, crocidolite, tremolite, anthophyl1ite, actinolite, and any of these minerals that has been chemically treated and/or altered. AUTHORIZED PERSONNEL Any person authorized by the employee and required by work duties to be present in regulated areas. CLEAN ROOM An uncontaminated room having facilities for the storage of employees' street clothing and uncontaminated materials and equipment. COMPETENT PERSON One who has been trained and retraired annually in an EPA approved course and is capable of identifying existing asbestos hazards in the workplace and has the authority to take prompt corrective measures to eliminate them. The duties of the competent person include at least the following: establishing the negative-pressure enclosure, ensuring its integrity, and controlling entry to and exit from the enclosure; supervising any employee exposure monitoring required by the standard; ensuring that all employees working within such an enclosure wear the appropriate personal protective equipment, are trained in the use of appropriate methods of exposure control, and use the hygiene facilities and decontamination procedures specified in the standard; and ensuring that engineering controls in use are in proper operating condition and are functioning properly. DECONTAMINATION AREA An enclosed area consisting of an equipment room, shower area, and clean room, which is used for the cecontamination of workers, materials, and equipment contaminated with asbestos. The decontamination area may be adjacent and connected to the regulated area or located remotely. DEMOLITION The wrecking or taking out of any load-supporting structural member and any related razing, removing, or stripping of asbestos. 8 *-!8*1Z60 1 S -4- SECTION IV DEFINITIONS EMPLOYEE EXPOSURE Exposure to airborne asbestos that would occur if the employee were not using respiratory protective equipment. EQUIPMENT ROOM tCHANGF ROOM! A contaminated room located within the decontamination area that is supplied with impermeable bags or containers for the disposal of contaminated protective clothing and equipment. EXCURSION LIMIT (ELI An airborne concentration of asbestos of 1.0 fiber per cubic centimeter (f/cc) of air as averaged over a sampling period of thirty (30) minutes. FIBR A particulate form of asbestos 5 micrometers or longer, with a length-to-diameter ratio of at least 3 to 1. FRIABLE ASBESTOS Any material that when broken, crushed or pulverized releases asbestos fibers. HIGH-EFFICIENCY PARTICULATE AIR fHEPAl FILTER A filter capable of trapping and retaining at least 99.97 percent of all monodispersed particles of 0.3 micrometers in diameter or larger. MINI-ENCLOSURE An enclosure constructed of 6-mil polyethylene sheeting to restrict access to the area where small-scale, short duration asbestos maintenance or renovation work is to be performed. The enclosure must have a contiguous change room. NEGATIVE PRESSURE ENCLOSURE An enclosure for large-scale long duration projects constructed of 6-mil polyethylene sheeting and ecuipped with a ventilation system (which discharges through a HEPA filter) capable of creating a negative pressure of 0.02 inches of water inside the enclosure. Where feasible, a decontamination area should be contiguous to the enclosure and should be the only means of egress. PERMISSIBLE EXPOSURE LIMIT (PEL) No employee shall be exposed to an airborne concentration of asbestos in excess of 0.2 fibers per cubic centimeter of air as an eight-hour time-weighted average (8 hr. TWA). -5- 6*l8n2201S SECTION IV DEFINITIONS REGULATED AREA An area established by the employer tc demarcate areas where airborne concentrations of asbestos exceed or can reasonably be expected to exceed the permissible exposure limit. The regulated area may take the form of a temporary enclosure, or an area demarcated to restrict access and minimize the number of employees potentially exposed to asbestos. REMOVAL The taking out or stripping of asbestcs or materials containing asbestos. RENOVATION The modifying of any existing structure, or portion thereof, where exposure to airborne asbestos may result. REPAIR Overhauling, rebuilding, reconstructing, or reconditioning of structures or substrates where asbestos is present. SMALL-SCALE. SHORT-DURATION ACTIVITIES The tasks such as, but not limited to: the removal of small quantities of asbestos-containing insulation on oipes prior to repair; the removal of small quantities of asbestos-containing insulation on beams or above ceilings; the replacement of an asbestos-containing gasket when mechanical removal is required; the installation or removal of a small section of drywall material containing asbestos; or the installation of electrical conduits, pipe, or cable tnrough or proximate to asbestos-containing materials. SURFACTANTS Chemicals added to water to improve its wetting ability. -6- o s e v G c u is ASBESTOS CONTENT >0.1X I OOCUMENT RESUtTS ANO RETAIN RECORDS I TRAIN PERSONNEL ON ASBESTOS SECTION III TOAH I FURTHER INSPECT FOR MATERIAL CONDITION ANO VISUAL FIBER RELEASE ASBESTOS AWARENESS HANDLING REQUIREMENTS OWNER RESPONSIBILITY* INSPECT ALL AREAS I TAKE SAMPLES OF SUSPECT MATERIALS AND SEND TO ANALYTICAL SERVICES 409-238-1199 _________________ I_________________ ASBESTOS CONTENT <0.1X I DOCUMENT RESULTS AND RETAIN RECORDS I NO FURTHER ACTION REQUIRED IS8*l2c,UlS MATERIAL IN POOR CONDITION OR VISUAL FIBER RELEASE EVALUATE AND 0EC1DE FOR REMOVAL AND/OR REPAIR I CONTACT INSULATION SERVICES 409-23B-7036 OR INDUSTRIAL HYGIENE SERVICES 409-238-1281 FOR ASSISTANCE I MAJOR REMOVAL/DEMOLITION OR RENOVATION REQUIRED NAME PROJECT SUPERVISOR. SCOPE. JOB. ANO (IF REQUIRED) PREPARE NOTIFICATION LETTER TOAH SECTION VII I ROJECT SUPERVISOR SHALL: CONTACT ENVIRONMENTAL SERVICES 409-238-2414 25 DAYS BEFORE WORK TO BEGIN 1 CONTACT INSULATION SERVICES TO BID JOB OR ARRANGE FOR DOW PERSONNEL I WHEN CONTRACT AWAROEO. CONTACT ENVIRONMENTAL SERVICES 409-238-2414 ANO ICENTIFY SUCCESSFUL BIDDER I HAVE PRE-JOB REVIEW WITH SAFETY DIRECTOR. OWNER RERESENTAT1VE. CONTRACTOR COMPETENT 3ERSON. INDUSTRIAL HYGIENE. DOW OR CONTRACTOR PERSONNEL TO DO JOB I DECIOE ON JOB PROCEDURES AND ARRANGE AUDIT AND MONITORING. COMPLETE ASBESTOS SAFETY CHECKLIST. I OWNER SHALL: DOCUMENT AND RETAIN RECORD IF ALL ASSC3TCS REMOVED. I DOCUMENT AND SET UP MAINTENANCE PROGRAM IF ANY ASBESTOS REMAINING -7- MATERIAL IN GOOD CONDITION. NO FIBER RELEASE DOCUMENT. LABEL AND SET UP MAINTENANCE PROGRAM TOAH SECTION VI I MINOR REMOVAL AND/OR REPAIR REQUIRED REVIEW SECTION X TOAH TO SEE IF JOB FALLS INTO GLOVE BAG OR SMALL-SCALE. SHORT DURATION ACTIVITY. IF SO USE CORRECT A$BESTGS ABATEMENT MINIMUM REQUIREMENTS DOCUMENT REMAINING ASBESTOS & SET-UP MAINTENANCE PROGRAM REFERENCES 1. TEXAS OPERATIONS SAFETY STANDARD T!C 2. TEXAS OPERATIONS ASBESTOS HANC60CK (TOAH) 3. EA-56U PURPLE ECO*. 4. OSHA STANOAROS 23C.rR 1910.1001 & 29CFR 1926.53 5. ENVIRONMENTAL STANDARO ES-314 SECTION V ASBESTOS AWARENESS ASBESTOS DO'S AND DON'TS This section is provided as general guidance when working with or near asbestos-containing materials. DO 1. Get positive identification. Sample and have analysis performed at Analytical Services, phone 409-226-1199. 2. Take sufficient samples. Some vessels, equipment, etc. may contain more than one type of insulation. Asbestos materials may be covered by refractory, siding, or insulation. 3. Consult the appropriate section of this handbook if asbestos is present. Materials containing more than 0.1% by weight must be handled as asbestos. 4. Put all asbestos waste (old insulation, transite, mastic, dust collector solids, disposable clothing, gaskets, packing, shingles, Haveg piping, furnace refractories, pump packing, pipe gaskets, brake shoes, etc.) in approved containers for disposal. The containers must be properly labeled to warn of the asbestos hazard and sent to the designated asbestas landfill. 5. Inform all personnel in the general area that asbestos work is in progress. DO NOT 1. Use materials containing asbestos (i.e. insulation, fireproofing, transite siding, Haveg piping, weatherproofing, and cooling tower materials) where an adequate alternate exists. MAJOR MANAGER APPROVAL IS REQUIRED WHEN USING ASBESTOS MATERIALS IF A SUITABLE ALTERNATE IS KNOWN. 2. Use asbestos labeled bags for disposal of general trash because of landfill permit requirements. 3. Sandblast or hydroblast materials containing asbestos. When sandblasting or hydroblasting adjacent areas, protect the asbestos materials from overblast. Examples of items to be protected are transite walls, pipe insulation, fireproofing, etc. 4. Use compressed air to remove asbestos materials. For example, do not clean brake drums and clutch housings with compressed air. This procedure may fill the surrounding atmosphere with asbestos fibers. An acceptable method is to use an approved vacuum. Dispose of the debris in approved containers and send to the designated asbestos landfill. -8- SECTION V ASBESTOS DO'S AND DON'TS (Cont'd) 5. Eat, drink, smoke, chew gum/tobac.co products, or apply cosmetics in a regulated area or a decontamination area. 6. Dry sweep asbestos materials. 7. Spray asbestos-containing materials. 8. Use hand-operated or power-operited tools (such as but not limited to saws, scorers, abrasive wheels and drills) without local exhaust ventilation if the use of these tools would cause asbestos exposures to personnel in excess of 0.2 fiber cc. 8 hr. TWA. 9. Hang plants or pictures on structures covered with asbestos-containing materials. 10. Sand asbestos-containing floor- tiles. 11. Damage asbestos-containing materials while moving furniture or other objects. 12. Install curtains, drapes, or d'viders in such a way that they damage asbestos-containing materials. 13. Dust floors, ceilings, molding; or other surfaces in asbestos-contaminated environments with a dry brush. 14. Use an ordinary vacuum to cleai up asbestos-containing debris. 15. Remove ceiling tiles below asbestos-containing materials without wearing the proper respiratory protection, clearing the area of other people, and observing asbestos removal waste disposal procedures. 16. Remove contaminated ventilatior. system filters without wetting. Do not shake. NOTE: Items 5 through 16 a*-e directly from the OSHA Asbestos Regulations. -9- GS8*irf<;0 IS ST0?.2U85U SECTION V SOME ASBESTOS-CONTAINING MATERIALS IN BUILDINGS SUBDIVISION_____________ GENERIC NAME________ ASBESTOS(%) DATES OF USE BINDER/SIZING Surfacing material sprayed-or troweled-on 1-95 Preformed thermal batts, blocks, and insulating products pipe covering - 85% magnesia 15 calcium silicate 6-8 Textiles cloth blankets(fire) felts: blue stripe red stripe green stripe sheets cord/rope/yarn tubing tape/strip curtains: theatre,welding 100 90-95 80 90 95 50-95 80-100 80-85 90 60-65 Cementitious concrete-like Paper products extrusion panels: 8 corrugated(transite) 20-45 flat (transite) 40-50 flexible 30-50 flexible perforated 30-50 laminated 35-50 (outer surface) roof tiles 20-30 clapboard and shingles: clapboard 12-15 siding shingles 12-14 roofing shingles 20-32 pipe 20-15 corrugated: high temperature 90 moderate temperature 35-70 indented 98 mi 11 board 80-85 1935-1970 sodium silicate, Portland cement, organic binders. 1926-1949 1949-1971 magnesium carbonate calcium silicate 1910-present 1920-present 1920-present 1920-present 1920-present 1920-present 1920-present 1920-present 1920-present none cotton/wool cotton cotton cotton cotton cotton/wool cotton/wool cotton/wool 1945-present cotton 1965-1977 1930-present 1930-present 1930-present 1930-present 1930-present Portland cement Portland cement Portland cement Portland cement Portland cement Portland cement 1930-present Portland cement 1944-1945 unk.-present unk.-present 1935-present Portland cement Portland cement Portland cement Portland cement 1935-present 1910-present 1935-present 1925-present sodium si 1icate starch cotton and organic binder starch,lime,clay -10- SUBDIVISION SECTION V SOME ASBESTOS-CONTAINING MATERIALS IN BUILDINGS GENERIC NAME________ ASBESTOS(%) DATES OF USE! BINDER/SIZING Roofing felts smooth surface mineral surface shingles pipeline 10-15 10-15 1 10 Asbestos -containing compounds ' caulking putties 30 adhesive(cold app1i ed) 5-25 joint compound roofing asphaU 5 mastics 5-25 asphalt tile cement 13-25 roof putty 10-25 plaster/stucco 2-10 spackles 3-5 sealants fire/water 50-55 cement,insulation cement,finishing cement,magnesia 20-100 55 15 Asbestos ebony products 50 Flooring tile and Sheet Goods vinyl asbestos t -e 21 asphalt/asbestos tile 26-33 sheet goods/resilient 30 Wallcovering vinyl wallpaper 6-8 Paints and coatings roof coating air tight 4-7 15 1910-present 1910-present 1971-1974 1920-present asphalt asphalt asphalt asphalt 1930-present 1945-present 1945-1975 unk.-present 1920-present 1959-present unk.-present unk.-present 1930-1975 1935-present 1900-1973 1920-1973 1926-1950 1930-present linseed oil asphalt. asphalt asphalt asphalt asphalt asphalt Portland cement starch.casein, synthetic resins caste'- oil or polyisobutylene clay clay magnesium carbonate Portland cement 1950-present 1920-present 1950-present polyvinyl chloride asphalt dry oils unk.-present none 1900-present asphalt 1940-present asphalt S S 8 *l2 2 0 iS -11- SECTION V ASBESTOS AWARENESS SUBJECT: Example pictures of past asbestos uses. Partial listing of examples that we must handle according to the guidance provided in this manual. Figure 1. Many of our daily jobs involve repairing flange leaks, replacing valves, etc. The old insulation that is removed in many cases will contain asbestos. -It- 9 S 8 *i6 ^ u lS St: l'^ ASBESTOS AWARENESS SUBJECT: Example pictures of past asbestos uses. Partial listing of examples that we must handle according to the guidance provided in this manual. Figure 3. There still remain some asbestos blankets that need disposal. Figure 4. Also used in past years was fiberglass insulation mixed with asbestos fibers. LS8*l2<i0iS SECTION V ASBESTOS AWARENESS SUBJECT: Example pictures of past asbestos uses. Partial listing of examples that we must handle according to the guidance provided in this manual. Figure 5. Structural fireproofing oft?n contained asbestos materials. Figure 6. Asbestos insulation blocks in combinations with refractory materia 1 s exist in many of our boilers an,-) furnaces. 8 S 9 V 6 u 1S SECTION V ASBESTOS AWARENESS SUBJECT: Example pictures of past asbestos uses. Partial listing of examples that we must handle according to the guidance provided In this manual. Figure 7. Transite which contains asbestos has been extensively used in the past in many applications in Texas Operations such as cooling towers, buildings, warehouses, etc. Asbestos is also present in cemesto board and asbestos siding shingles which were also used in various type buildings. Figure 8. Our most extensive use of asbestos in the older plants was the thousands of square feet used on piping and equipment insulation. -15- 6S8:l6 i0 iS SECTION V ASBESTOS AWARENESS SUBJECT: Example pictures of asbestos uses. Partial testing of example that we must handle according to the guidance provided in this manual. Friable, fluffy sprayed-on material Friable, cementitious sprayed-on or troweled material (acoustical plaster) 098*i2201S Nonfriable wallboard with friable sprayed-on material behind Pipe lagging Figure 6 Examples of asbestos-containing materials found in buildings -16- SECTION V ASBESTOS AWARENESS SUBJECT: Example pictures of asbestos uses. Partial testing of example that we must handle according to the guidance provided in this manual. -1 $10224861 SECTION VI ASBESTOS MAINTENANCE PROGRAM MINIMUM REQUIREMENT An asbestos maintenance program must be initiated in all facilities that have asbestos-containing materials. Such a program shall include: 1. Inspection of buildings and process areas to determine the presence or absence of asbestos containing materials. 2. Development of an inventory of all asbestos-containing materials in the facility. The inventory may be a blueprint, diagram or written description which identifies the location and approximate amount of asbestos. Records must be maintained until the asbestos-containing materials are removed. 3. ' Maintenance of all labeling of asbestos-containing materials or block signs in the facility. 4. ' Prompt clean up of any asbestos contamination. 5. Examination of all asbestos-containing materials semi-annually to detect deterioration. If deterioration is found, the material must be repaired or removed. Call Insulation Services (409-238-7036) if assistance is needed. 6. Written procedures for handling asbestos materials during the performance of maintenance, demolition and renovation activities. 7. Training for personnel who may be required to handle asbestoscontaining materials as outlined in the Training Section of this Handbook. (See page 3) 8. Documentation of compliance with this program. -18- 2 9 8 *l2 ^ u iS SECTION VII ASBESTOS WORK IN PUBLIC BUILDINGS The Texas Department of Health adopted new rules which became effective on October 1, 1988. These rules apply for all asbestos work in "public buildings". "Public buildings" are defined as all buildings "capable of public occupancy" except for "those buildings or portions of buildings to which all access is strictly and entirely controlled or prohibited because of process or functions dangerous to human health or safety.." The procedures outlined below must be followed for all jobs involving asbestos in public buildings: 1. Notify Environmental Services (409-238-2414) 2. Contact Insulation Services frr assistance in assessing the job and in locating a licensed contractor to do the work. (409-238-7036) -H- 9 8 'i2 < ;u iS SECTION VIII NOTIFICATION OF DEMOLITION OR RENOVATION WORK It is the responsibility of the superintendent/owner to contact Environmental Services (409-238-2414) 25 days prior to the start of any reportable asbestos project. Jobs to be reported are: (1) Demolition which involves the removal of friable asbestos material. (2) _ Renovation in which the cumulative amount of friable asbestos removed in a calendar year exceeds 260 linear feet on pipe or 160 square feet on other facility components. (3) Any asbestos work in "public buildings" Reference: Texas Operations Environmental Standard ES314 -20- *1 9 8 ^1 )1 $ SECTION IX HAZARD COMMUNICATION 1. Labels: Labels may be affixed individually to items or a warning sign may be placed at the entrance to the block or area. All products that contain asbestos in concentrations that exceed 0.1% by weight must be labeled. Labeling must be done in accordance with the requirements of 29 CFR 1910.1200 (f) of OSHA's Hazard Communication standard. 14" x 20* Asbestos Hazard Signs Dow Stock #01-03374-020 3" x 5" Asbestos Hazard Labels Dow Stock #01-03372 White "Danger" on red oval on a black field - Black block lettering STP??_U865 SOME MATERIALS IN THIS BLOCK MAY CONTAIN ASBESTOS CONSULT SUPERVISION FOR SPECIFIC INFORMATION WHEN WORKING WITH ASBESTOS AVOIO CREATING DUST ASBESTOS IS A CANCER & LUNG DISEASE HAZARD I 14" x 20" Asbestos Hazard Labeling Area Sign Dow Stock #01-03374-010 White "Danger" on a red oval on a black field - Black block lettering -21- SECTION IX HAZARD COMMUNICATION 2. Regulated Area Sion: Warning signs must be posted to demarcate a regulated area and must be posted at such a distance that an employee can read the - signs and take necessary protective steps before entering the regulated area. ASBESTOS CANCER AND LUNG DISEASE HAZARD AUTHORIZED PERSONNEL ONLY RESPIRATORS AND PROTECTIVE CLOTHING ARE REQUIRED IN THIS AREA 14" x 20" Asbestos Hazard Sign Dow Stock #01-03374 White "Danger" on a red oval on a black field - Black block lettering 9 9 8 T i;i;u is 3. Asbestos Disposal Containers: All containers used for disposal of asbestos waste must have an approved label. Special purpose, 6 mil, polyethylene bags with the appropriate label are available through Dow Stock #17-30522. -22- SECTION X PACKAGING OF ASBESTOS WASTE FOR DISPOSAL 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. The recommended container is a 6-mil thick polyethylene bag. These bags are available through Dow Stock #17-30522. Other acceptable containers are polyethylene lined cardboard containers or polyethylene lined metal containers (drums, dempster boxes, or dino boxes). Polyethylene bags labeled with an approved asbestos label must be used only for bagging asbestos waste. When using bags, minimize the amount of void space or air in the bags to minimize their bursting during stacking and disposal. All containers used for asbestos waste must be sealed to make them leak-tight. Torn bags must be rebagged (double bagged) rather than repaired by taping. Disposable clothing worn during asbestos removal, packaging, and disposal must be placed into properly labeled polyethylene bags and disposed of as asbestos waste. An open-top fiber or steel drum containing a polyethylene liner may be used to accumulate small quantities of bagged and sealed asbestos waste (brake shoes, b'-ake dust, garlock gaskets, etc.). The drum must have an approved warning label, be labeled for asbestos waste use only, and the top must be kept on except during deposit of waste. All dempsters used for unbagged asbestos waste must contain a disposable polyethylene liner obtained from, or approved by, Environmental Operations. Dempster boxes must not be fil;ed higher than the top of the walls. Dempster liners must be lapped over and secured for temporary closure whenever the job is discontinued for a prolonged period (overnight, holiday, weekend). Dempster liners must be securely closed before transport of the dempsters; the sides and ends are to be lapped over and then secured. Proper lapping and sealing procedures are provided in instructions by Environmental Operations. Tie-downs for dempster liners must not be attached to the dempster boxes. All dempster boxes used for asbestos waste packaging and transport, and all packages of asbestos waste (including dempster liners) must be labeled with an OSHA-approved label. Note: Call 409-238-1176 for information. Z.98*j<iculS -23- SECTION XI ASBESTOS GASKET AND PACKING HANDLING MINIMUM REQUIREMENTS STORAGE FACILITY Preformed gaskets, packing and gasket fabrication materials will be stored in a clean storage area. The storage area will be cleaned regularly with a HEPA filter vacuum to prevent accumulation of debris. REMOVAL Spiral-wound gasket removal shall comply with the glove bag or small-scale short-duration minimum requirements if wet methods ' cannot be used. If other gaskets or packing to be removed are not adhered to the sealing surfaces and can be removed by hand without breaking apart, remove and package for disposal according to Section IX of this manual. If the gasket or packing is adhered to the sealing surfaces so that mechanical means are used and this operation creates particles in the air or surrounding area, then as a minimum, the asbestos abatement minimum requirements for glove bags or small-scale short-duration jobs shall be used. All asbestos residue must be removed from gasket sealing surfaces on valve and pipe before transporting from gasket removal site. CUTTING GENERAL: 1. Employees who work with asbestos must receive training in asbestos hazards before the initial assignment and annually thereafter. 2. Personnel in the general area must be notified that asbestos work is in progress. 3. A specific job procedure must exist and be followed. SAFETY: 1. Safety equipment required by the job location must be worn. 2. An approved respirator must be worn during cutting and cleanup. Employee must have completed the mandatory fit test. Contact 409-238-3536 for information. 3. Disposable coveralls with attached boots and hoods must be worn for cutting and cleanup operations. Coverall boots may be worn over shoes or inside rubber boots. If monitoring shows the potential asbestos exposure levels are consistently below 0.1 fiber/cc on an 8 hour TWA or short-term exposures below 1 f/cc averaged over a sampling period of 30 minutes, disposable coveralls need not be worn. 4. Vacuum and local exhaust ventilation systems must be equipped with HEPA filters. -24- ST 022U 868 SECTION XI ASBESTOS GASKET AND PACKING HANDLING MINIMUM REQUIREMENTS SAFETY: 5. Personnel monitoring must be done at the beginning of each job unless personnel wear supplied air respirators, or previous personnel monitoring of similar jobs shows short-term exposures below 1 fiber/cc averaged over a sampling period of 30 minutes or 8 hour TWA exposure potentials less than 0.1 fiber/cc. Contact Industrial Hygiene Services 409-238-1281 for information. 6. Local exhaust ventilation must be provided for hand operated or power operated tools (such as but not limited to saws, scorers, abrasive wheels, and drills). The efficiency of local exhaust ventilation systems must be verified by Industrial Hygiene Services. WORK AREA: 1. Gasket fabrication area must be identified as an asbestos handling area. 2. Gasket cutting table will be fabricated such that asbestos material or dust cannot collect or contaminate the table. 3. Work area must be cleaned after each job. Vacuum to remove any loose material or dust. Dispose of any scrap material in a sealed plastic bag with the proper asbestos label and clean unused fabrication material for storage. A job procedure must be followed when changing HEPA filters. 4. Dispose of coveralls and other contaminated clothing using labeled plastic bags. 5. After area is clean, vacuum work clothes and remove and clean respirators for storage. -25- 698*i2201S SECTION XI TRANSITE AND ASBESTOS SHINGLES HANDLING MINIMUM REQUIREMENTS Transite sheeting or asbestos shingles should not be modified (cut or drilled). An alternate material should replace the transite sheeting or shingles needing modification and any cutting or drilling should be made on the alternate material. MAJOR MANAGER APPROVAL IS REQUIRED WHEN USING ASBESTOS MATERIALS AS REPLACEMENT FOR TRANSITE SHEETING OR ASBESTOS SHINGLES. Requirements: 1. A competent person must supervise all large-scale jobs to assure proper procedures are followed. 2. Employees who work with asbestos must receive training in asbestos hazards before the initial assignment and annually thereafter. 3. Personnel in the general area must be notified that asbestos work is in progress. 4. A specific job procedure must be written and followed. An asbestos safety check list must be completed for each large scale job. 5. Safety equipment required by the job location must be worn. 6. An approved respirator must be worn. Employees must have completed the mandatory fit test. Contact 409-238-3536. 7. Disposable coveralls with attached boots and hoods must be worn during removal and cleanup operations. If the removal is being done with the use of heavy equipment such as a crane or front-end loader, the necessary protective clothing should be specified in the job procedure. 8. Personnel monitoring must be done at the beginning of each job unless personnel wear supplied air respirators, or previous personnel monitoring of similar jobs shows short-term exposure potentials below 1 f/cc averaged over a sampling period of 30 minutes or 8-hour TWA exposure potentials less than 0.1 fiber/cc. Contact Industrial Hygiene Services 409-238-1281 for information. 9. Transite and asbestos shingles must be wetted before removal. 10. A regulated area must be established and asbestos warning signs posted to restrict access to authorized personnel only. 11. Drinking water must be kept outside regulated area. 12. Disposable clothing and respirator must be removed each time before exiting the regulated area. A change area must be designated just inside the regulated area. 13. Broken pieces of transite and/or shingles must not be crushed by the movement of the heavy equipment. 14. Broken transite and shingles must be wetted before being picked up. Material must be placed into labeled polyethylene bags or containers approved by Environmental Operations. Bags or containers must be lowered to the ground, not dropped. 15. Before leaving the regulated area at the end of the day or job, broken transite and shingles must be placed in an approved container. 16. All equipment removed from the regulated area must be decontaminated. -26- ST0224870 SECTION XI TRANSITE AND ASBESTOS SHINGLES HANDLING MINIMUM REQUIREMENTS (CONT'D) 17. Disposable coveralls and gloves must be placed in an approved container at the end of the day or job. 18. After work is completed a thorough inspection and cleanup of the area must be conducted. 19. All materials used to establish the regulated area must be removed. '20. Bags or containers must be transported to the dempster or collection area. -27- l L8*i 22U1S SECTION XI TRANSITE AND ASBESTOS SHINGLES CUTTING, DRILLING, OR ABRADING MINIMUM REQUIREMENTS Transite sheeting or asbestos shingles should not be modified (cut or drilled). An alternate material should replace the transite sheeting or shingles needing modification and any cutting or drilling should be made on the alternate material. MAJOR MANAGER APPROVAL IS REQUIRED WHEN USING ASBESTOS MATERIALS AS - REPLACEMENT FOR TRANSITE SHEETING OR ASBESTOS SHINGLES. REQUIREMENTS: 1. Employees who work with asbestos must receive training in asbestos hazards before the initial assignment and annually thereafter. 2. Personnel in the general area must be notified that asbestos work is in progress. 3. A specific job procedure must be written and followed. 4. Safety equipment required by the job location must be worn. 5. An approved respirator must be worn. Employees must have completed the mandatory fit test. Contact 409-238-3536. 6. Disposable coveralls with attached boots and hoods must be worn during removal, cutting, drilling, abrading and the resulting cleanup. Coverall boots may be worn over work shoes or inside rubber boots. 7. Vacuum and local exhaust ventilation systems must be equipped with HEPA filters. 8. Personnel monitoring must be done at the beginning of each job unless personnel wear supplied air respirators, or previous personnel monitoring of similar jobs shows short-term exposures below 1 f/cc averaged over a sampling period of 30 minutes or 8 hour TWA exposure potentials less than 0.1 fiber/cc. Contact Industrial Hygiene Services 409-238-1281 for information. 9. Water for wetting must contain a surfactant. 10. Local exhaust ventilation must be provided for hand operated or power operated tools (such as but not limited to, saws, scorers, abrasive wheels, and drills). The efficiency of the local exhaust ventilation system must be verified by Industrial Hygiene Services. 11. A regulated area must be established and asbestos warning signs posted to restrict access to authorized personnel only. 12. Area must be cleaned of existing asbestos contamination and other debris. 13. Portable objects must be removed to prevent contamination. 14. Coverings must be placed over remaining objects and underneath the work area. Scaffold landings must be covered. 15. Mini-enclosures or negative pressure enclosures must be used for jobs whenever feasible if the potential exposure level may equal or exceed 1 fiber/cc averaged over a sampling period of 30 minutes or 0.2 fibers/cc 8 hour TWA (local exhaust ventilation or other engineering control methods may eliminate the need for enclosures.) -28- ST0224872 SECTION XI TRANSITE AND ASBESTOS SHINGLES HANDLING MINIMUM REQUIREMENTS (CONT'D) 16. Material that is being cut, drilled, etc. must be wetted down and/or local exhaust ventilation used. If wetting is not compatible with the process, or materials/equipment may be damaged, or local exhaust ventilation reduces the potential exposure below 1 fiber/cc averaged over a sampling period of 30 minutes or 0.2 fibers/cc as an 8 hour TWA, wetting may be eliminated. 17. Material removed must be placed into labeled polyethylene bags or containers approved by Environmental Operations. Bags or containers must be lowered to the ground, not dropped. 18. After work is completed a thorough inspection and cleanup of the area must be conducted. Vacuum the work area as required. 19. All tools removed from the regulated area must be decontaminated. The specific job procedure for the job must address the decontamination of HEPA vacuum cleaners and changing of the HEPA filter in vacuum cleaners if a vacuum cleaner is used during the job. 20. Disposable coveralls, exposed area of skin and respirator must be vacuumed and boots must be decontaminated each time before exiting the regulated area. 21. Disposable coveralls, must be disposed of in a sealed asbestos waste bag. 22. Work clothes must be vacuum off. 23. All materials used to establish the regulated area must be removed. 24. Bags or containers must be transported to the dempster or collection area. -29- ST0224873 SECTION XI ASBESTOS ABATEMENT MINIMUM REQUIREMENTS GLOVE BAGS. GENERAL: 1. Employees who work with asbestos must receive training in asbestos hazards before the initial assignment and annually thereafter. 2. A specific job procedure must be written before beginning the job. SAFETY: 1- Safety equipment required by the job location must be worn. 2. An approved respirator must be worn during material removal and cleanup. Employee must have completed the mandatory fit test. Contact 409-238-3536 for information. 3. Vacuum equipment must be equipped with a HEPA filter. 4. Water for wetting must contain a surfactant. REMOVAL: 1. The glove bag must be fitted to the pipe or structure where asbestos work is to be done. Insert the necessary tools into the bag. Attach bag to the pipe or structure and seal all openings with tape. The bottom seam of the bag must also be reinforced with tape to prevent leakage from the bag that may result from a defect in the bottom seam. 2. An opening must be made in the bag away from the work area. A spray nozzle must be inserted through this opening and the area to be worked sprayed until it is thoroughly wetted. Continue wetting dry material as it is exposed. Dry material in the bottom of the bag must be wetted. Wetting of materials may be eliminated if water is not compatible with the process or materials or equipment may be seriously damaged. 3. After removal of the layer of asbestos containing materials, the pipe or surface must be cleaned with a wire brush and wet wiped until no traces of asbestos containing material can be seen. 4. Exposed asbestos must be encapsulated at terminations. 5. Tools must be wetted and cleaned. Place the tools such that they may be removed after the bag is twisted and sealed. 6. A vacuum hose must be inserted through the opening used for wetting and used to remove any air from the bag that may contain asbestos fibers. The bag must be squeezed as close to the top as possible, twisted and sealed with tape to keep the asbestos materials safely in the bottom of the bag. 7. Remove the bag from the work area and remove tools. 8. The top portion of the bag and the opening used for wetting must be resealed with tape. 9. Disposal of the glove bag must be in an approved container. -30- ST0224874 SECTION XI ASBESTOS ABATEMENT MINIMUM REQUIREMENTS SMALL-SCALE SHORT-DURATION PROJECTS WHEN GLOVE BAGS ARE NOT USED. GENERAL: 1. Employees who work with asbestos must receive training in asbestos hazards before the initial assignment and annually thereafter. 2. Personnel in the general area must be notified that asbestos work is in progress. 3. A specific job procedure must be written before beginning the job. SAFETY: 1. Safety equipment required by the job location must be worn. 2. An approved respirator must be worn during material removal and cleanup. Employee must have completed the mandatory fit test. Contact 409-238-3536 for information. 3. Disposable coveralls with attached boots and hoods must be worn during cleanup and removal operations. Coverall boots may be worn over work shoes or inside rubber boots. 4. Vacuum and local exhaust ventilation systems must be equipped with HEPA filters. 5. Personnel monitoring must be done at the beginning of each job unless personnel wear supplied air respirators, or previous personnel monitoring of similar jobs shows short-term exposures below 1 f/cc averaged over a sampling period of 30 minutes or 8 hour TWA exposure potentials less than 0.1 fiber/cc. Contact Industrial Hygiene Services 409-238-1281 for information. 6. Water for wetting must contain a surfactant. 7. Local exhaust ventilation must be provided for hand operated or power operated tools (such as but not limited to, saws, scorers, abrasive wheels, and drills). The efficiency of local exhaust ventilation systems must be verified by Industrial Hygiene Services. REGULATED AREA: 1. A regulated area must be established and asbestos warning signs posted to restrict access to authorized personnel only. 2. Area must be cleaned of existing asbestos contamination and other debris. 3. Portable objects must be removed to prevent contamination. 4. Coverings must be placed over remaining objects and underneath the work area. Scaffold landings must be covered. Materials must not be dropped to the ground. Pre-job planning must include provisions for keeping deteriorated material in place after jacketing is removed. 5. Mini-enclosures or negative pressure enclosures must be used for jobs whenever feasible if the potential exposure level may equal or exceed 1 f/cc averaged over a sanpling period of 30 minutes or 0.2 fibers/cc 8 hour TWA (local exhaust ventilation or other engineering controls methods may eliminate the need for end osures.) -31- 9 L 8 * i2 m s SECTION XT ASBESTOS ABATEMENT MINIMUM REQUIREMENTS LARGE SCALE, LONG DURATION PROJECTS. GENERAL: 1. The Superintendent/owner must contact Environmental Services (2414) a minimum of 25 days prior to starting asbestos removal work and specify a project supervisor. 2. The project supervisor must provide a written Safe Work procedure specific for each job which includes as a minimum the require- .. ments listed below. 3\ The project supervisor must meet with the industrial hygienist, safety director for the area, and personnel performing the job to discuss the Safe Work procedure and arrange for audit and monitoring. 4. The project supervisor must arrange to have a "Competent Person" for the job if the work is performed by Dow employees. If work Is contracted, the contractor must provide a "Competent Person" to supervise the job. 5. Employees who work with asbestos must receive training in asbestos hazards before the initial assignment and annually thereafter. 6. Personnel in the general area must be notified that asbestos work is in progress. SAFETY: 1. Safety equipment required by the job location must be worn. 2. An approved respirator must be worn during material removal and cleanup. Employee must have completed the mandatory fit test. Contact 409-238-3536 for information. 3. Disposable coveralls with attached boots and hoods must be worn during cleanup and removal operations. Coverall boots may be worn over work shoes or inside rubber boots. 4. "Street clothes" must not be worn underneath disposable coveralls. 5. If work clothing is worn underneath, it must be left in the "dirty room" of the decontamination facilities. Contaminated clothing for laundering must be contained in a sealed asbestos waste bag and laundered in a manner which will minimize the release of asbestos fibers. Personnel laundering asbestos contaminated clothing must be informed of this requirement. 6. Vacuum and local exhaust ventilation systems must be equipped with HEPA filters. 7. Personnel monitoring must be done at the beginning of each job unless glove bags are used or personnel wear supplied air respirators or previous personnel monitoring of similar jobs shows short-term exposures below 1 f/cc averaged over a sampling period of 30 minutes or 8 hour TWA exposure potentials less than 0.1 fibers/cc. Contact Industrial Hygiene Services 409-238-1281 for information. 8. A decontamination area must be provided. It must be contiguous to the regulated area if feasible. Egress to the regulated area must be through the decontamination area. 9. Water for wetting must contain a surfactant. -34- ST0224878 ST022U879 SECTION XI ASBESTOS ABATEMENT MINIMUM REQUIREMENTS LARGE SCALE, LONG DURATION PROJECTS (Cont'd) SAFETY fCONT'D) 10. Local exhaust ventilation must be provided for hand operated or power operated tools, such as but not limited to, saws, scorers, abrasive wheels, and drills. The efficiency of local exhaust ventilation systems must be verified by Industrial Hygiene Services. 11. An Asbestos Safety Checklist must be completed for each job. REGULATED AREA: 1. A regulated area must be established and asbestos warning signs posted to restrict access to authorized personnel only. 2. Area must be cleaned of existing asbestos contamination and other debris. 3. Portable objects must be removed to prevent contamination. 4. Coverings must be placed over remaining objects and underneath the work area. Scaffold landings must be covered. Materials must not be dropped to the ground. Pre-job planning must include provisions fu. keeping deteriorated material in place after jacketing is removed. 5. Glove bags, mini-enclosures or negative pressure enclosures must be used for jobs whenever feasible if the potential exposure level may equal or exceed 1 f/cc averaged over a sampling period of 30 minutes or 0.2 fibers/cc as an 8 hour TWA. (Local exhaust ventilation or other engineering control methods may eliminate the need for enclosures.) REMOVAL: 1. The materials must be wet down before, during, and after removal to prevent airborne emissions. Materials must be thoroughly wetted, but not to the point that they crumble and turn to mush. Wetting of materials may be eliminated if water is not compatible with the process, or materials/equipment may be seriously damaged, or local exhaust ventilation reduces the potential exposure limit below 1 f/cc averaged over a sampling period of 30 minutes or 0.2 fibers/cc as an 8 hour TWA. 2. Material must be removed and placed into labeled polyethylene bags or containers approved by Environmental Operations. Bags or containers must be lowered to the ground, not dropped. 3. The surface from which asbestos has been removed must be wetted and cleaned. 4. Exposed asbestos must be encapsulated at terminations. 5. After asbestos removal, a thorough inspection and cleanup of the area must be conducted. Pick up and dispose of coverings and double bag contaminated or broken bags. Vacuum work area as required. 6. All items removed from the regulated area must be decontaminated. A job procedure must be followed when changing HEPA filters. 7. All materials used to establish the regulated area must be removed. 8. Bags or containers must be transported to the dempster or collection area. -35- SECTION XI TYPICAL DECONTAMINATION AREA LAYOUT WORK AREA DOUBLE FLAP i------------------- -------------------------- r=j EQUIPMENT/DIRTY CHAtIGE ROOK DOUBLE FLAP f I / ------------------- ! [ I I | SHOWER DOUBLE FLAP CLEAN ROOM DOUBLE FLAP nz-------------- 0-88*lZ201S -36- I 88*ii201S SECTION XI DECONTAMINATION AREA (CONTIGUOUS TO WORK AREA) 1. REMOVE GROSS CONTAMINATION FROM SUIT. 2. REMOVE PROTECTIVE CLOTHING IN EQUIPMENT/DIRTY CHANGE ROOM AND DEPOSIT IN LABELED IMPERMEABLE BAGS. 3. WEAR RESPIRATOR INTO SHOWER AREA. 4. SHOWER BEFORE ENTERING CLEAN ROOM. 5. PUT ON STREET CLOTHES. 6. EXIT DECONTAMINATION AREA. -37- SECTION XI DECONTAMINATION AREA (At a Remote Location) 288*i 2gu.LS 2. REMOVE CONTAMINATED CLOTHING. 3. PUT ON CLEAN SUIT AND PROCEED TO DECONTAMINATION AREA WEARING RESPIRATOR. 4. DEPOSIT CLOTHING IN DIRTY CHANGE ROOM. 5. WEAR RESPIRATOR INTO SHOWER AREA. 6. SHOWER BEFORE ENTERING CLEAN ROOM. 7. EXIT DECONTAMINATION AREA. ENTRY 1. ENTER DECONTAMINATION AREA THROUGH CLEAN ROOM. 2. REMOVE AND DEPOSIT "STREET CLOTHES" IN LOCKER 3. PUT ON PROTECTIVE CLOTHING AND RESPIRATORY PROTECTION (STRAPS UNDER HOOD). 4. PROCEED TO WORK SITE AND ENTER ENCLOSURE/REGULATED AREA THROUGH EQUIPMENT ROOM. 38- 8 8 f!4 6 U lS SECTION XI EXAMPLES OF NEGATIVE PRESSURE SYSTEMS AB DF, Decontamination Facility; EU, Exhaust Unit; WA, Worker Access; A, Single-room work area with multiple windows; B, Single-room work area with single window near entrance; C, Large single-room work area with windows and auxiliary makeup air source (dotted arrow). Arrows denote direction of air flow. 'ircled numbers indicate progression of removal sequence. -39- SECTION XI ASBESTOS ABATEMENT MINIMUM REQUIREMENTS AUTOMOTIVE CLUTCH AND BRAKE REPAIR GENERAL: 1. Employees who work with asbestos must receive training in asbestos hazards before the initial assignment and annually thereafter. 2. Do NOT use compressed air to remove asbestos materials or dust from brake drums or clutch housings. 3. Place polyethylene sheeting underneath the work area. SAFETY REQUIREMENTS: 1. Safety equipment required by the job location must be worn. 2. An approved respirator must be worn during material removal and clean up. Employees must have completed the mandatory fit test. Call 409-238-3536 for information. 3. Barricade area with yellow tape or rope to limit access. REMOVAL 1. Two methods can be used to reduce exposure to asbestos fibers. The Enclosed Cylinder/HEPA Vacuum System Method and a wetting method. A. The Enclosed Cylinder/HEPA Filter Vacuum System Method consists of three components. * A wheel-shaped cylinder designed to cover and enclose the wheel assembly * A compressed-air hose and nozzle that fits into a port in the cylinder, and * A HEPA-filter vacuum used to evacuate airborne dust generated within the cylinder by the compressed air. B. The wetting method consists of spraying water containing a surfactant to loosen the asbestos containing residue and to capture the resulting airborne particles in the water mist. * Begin spraying the asbestos-containing parts at a sufficient distance to ensure that the asbestos particles are not dislodged by the velocity of the water spray. * When the asbestos particles are thoroughly wetted, the spray will be brought closer to the parts and the parts will be sprayed as necessary to remove grease and other material.* * The parts must then be wiped with disposal rags or towels which must be placed in a labelled plastic bag and sealed while they are still wet. -40- ST 0 2 2 4 8 8 4 SECTION XI ASBESTOS ABATEMENT MINIMUM REQUIREMENTS AUTOMOTIVE CLUTCH AND BRAKE REPAIR (Cont'd) 2. Replaced brake shoes or pads, clutch plates, disposable rags or towels, polyethylene sheeting and other contaminated materials for disposal must be handled as asbestos waste. 3. When the job is completed, a thorough inspection must be made to ensure all asbestos contaminated materials have been picked up. Vacuum work area as required. A job procedure must be followed when changing HEPA filters. -41- S 8 8 *l2 2 0 iS SECTION XII ASBESTOS SAFETY CHECKLIST ST0224886 JOB DESCRIPTION LOCATION DATE PRE-JOB REQUIREMENTS: L. Environmental Services contacted (ph 409 238-2414)? Yes__ No Name:__________________ __________ Date: _____ Dow Project Supervisor: 2. Safe Work Procedure Written? Yes No Date: 3. Project Review Held? Industrial Hygienist: Date: Safety Director: Date: Competent Person: Date: Craftsmen: Date: Safe Work Procedure Approved: Yes No Hygiene Monitoring Required: Yes No Audit Required: Yes No Auditor Assigned Phone: JOB REQUIREMENTS: 1. Safe Work Procedure Reviewed: Yes No 2. Regulated Area Established and Signs Posted: Yes No Negative pressure enclosure established: Yes No Decontamination Area Established: Yes No 3. Personnel Trained: Yes No 4. Block Personnel Informed: Yes No 5. Auditor Notified: Yes No 6. Amended Water Available To Control Dust: Yes No 7. Has packaging of asbestos debris been decided upon? Yes No 8. Has Disposal Of Asbestos Debris Been Arranged: Yes No 9. Arrangements For Clean-up Made: 10. Safety Equipment Required: Yes No Safety equipment required by the location Approved respirator __current fit test __ clean shaven Disposable coveralls with hood and boots __ gloves 11. Arrangements for laundering work clothes Yes No 12. Vacuum cleaners and local exhaust ventilation systems equipped with HEPA filters Yes No Note: Work may commence when Safe Work Permit issued. 13. Final cleanup complete Yes No 14. Job complete: Dow Project Supervisor: Date: 15. Send comDleted checklist to Industrial Hygiene Services B-101. -42- SECTION XIII ASBESTOS ABATEMENT AUDIT CHECKLIST Job Description __________________________________ Date: Location:Removal by: Company Name Regulated Area Established and Signs Posted: Polyethylene or other coverings over floor & objects: YES NO YES NO Decontamination Area Established: Contiguous Remote: Location: YES NO Entry to work area only through decontamination area YES___ NO___ Neaative Pressure Enclosure Established: Floor Covered Walls Covered Area Ventilation OFF All Edges Sealed Penetrations Around Pipes and Conduit Sealed Entry Curtains Negative Pressure Achieved (-0.02" water) YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES___ NO___ Protective Equipment: Disposable Coveralls with Hood and Boots Coveralls Unzipped, Torn, or Cut Coveralls Used One Time Approved Respirator Type Used Clean Shaven Straps Under Hood Safety Equipment Required by Location: Hard Hat Safety Glasses Goggles YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO /) --1 O IN3 r\i e" oo ao --j -43- SECTION XIII ASBESTOS ABATEMENT AUDIT CHECKLIST 5. Work Practices: Material Worked Wet Material Kept Wet Until Bagged & Sealed Material Too Wet, Mushy Insulation Broken Intentionally Material Dropped to Ground Removed Material Promptly Bagged Bags Torn or Left Open Visible Emissions HEPA Filtered Vacuum Used Smoking, Eating, Drinking, Chewing, Cosmetics Personnel Decontaminated Each Departure Shower Used by All Personnel Exposed Asbestos at Terminations Sealed with Encapsulant Work Area Cleaned After Completion 6. Personnel Monitoring Initial Monitoring Daily Monitoring Area Monitoring Contractor Dow COMMENTS: YES___ NO YES___ NO. YES___ NO' YES___ NO YES___ NO YES___ NO. YES___ NO. YES___ NO YES___ NO. YES___ NO. YES___ NO. YES___ N0_ YES__ NO_ YES__ NO_ YES__ NO_ YES__ N0_ YES__ NO_ ST0224888 SIGNATURE: ___________________________________________ Industrial Hygienist/Safety-Director cc: Project Supervisor Area Owner Safety Director Industrial Hygienist Manager, Industrial Hygiene Services Revised 10/20/88 db -44- APPENDIX A RECOMMENDED PROTECTIVE EQUIPMENT The equipment listed below has been judged to be the best for asbestos protection but is not necessarily the only equipment available. Other types of respirators are identified in Appendix C of the Texas Operations Respiratory Protection Manual (2/88). The equipment listed below represents the preferred equipment based on current technology and knowledge at the time of publication of this Asbestos Manual. Equipment which is not listed below or in Appendix C of the Respiratory Protection Manual should not be purchased or used unless the Texas Operations Protective Equipment Committee (1281) has evaluated the equipment. Respirator users must be trained, fit tested and medically certified prior to using a respirator. Training & fit testing can be scheduled by contacting Industrial Hygiene Services (3536). Medical certification is conducted by the Occupational Health Department (3598). All respirators can be ordered through the Dow Stores (3401), or via Purchase Order. I. RESPIRATORY PROTECTION FOR ASBESTOS Airborne Asbestos Manufacturer VSP Number ResDirator Cartridqe < 2 fibers/cc Half-Mask Air Purifying AO 5 STAR - Silicone smal 1 medium large _ 01-04175-000 01-04175-010 01-04175-020 01-040680-500 AO 5 STAR - Rubber smal 1 medium 1 arge Wilson 6100 - Silicone smal 1 medium large MSA Comfo II - Fubber smal 1 medium 1 arge _ 01-04173-000 01-04173-010 01-04173-020 01-04280 01-04282 01-04284 _ 01-04122 01-04124 01-04126 01-040680-500 01-04285 01-04252 CO --1 O .o r-o CO OO CO -45- I. RESPIRATORY PROTECTION FOR ASBESTOS (Cont'd) Airborne Asbestos Manufacturer VSP Number Respirator Cartridae < 10 f/cc Full Face Air Purifying - < 20 f/cc Scott-O-Vistal Scott-0-Vista2 Scottoramic AO 7 STAR 01-04335 01-04335 01-04420 01-04190 Powered Air Purifying Respirators Racal BE7/P3 01-04805 < 200 f/cc Supplied Air Pressure Demand (Full Face) Scottoramic 01-04625 Scott-O-Vista 01-04630 SCBA Pressure Demand (Full Scott IIA Scottoramic (30 minute) Scott 2.2, Scott-O-Vista (30 minute) Scott 4.5, Scott-O-Vista (60 minute) Scott Case Face) 01-04520 01-04510 01-04512 01-04666 II. RESPIRATOR CARTRIDGES FOR A COMBINATION OF ASBESTOS & CHEMICALS 01-04193 01-04195 01-04193 01-040680-500 01-04810 NA NA NA NA NA ST 0 2 2 4 8 9 0 Respirator Manufacturer American Optical 5 & 7 STARS MSA Comfo II Cartridge Protects Aaainst: Organic vapors & asbestos Acid gases & asbestos Organic vapors, acid gases & asbestos Ammonia, amines & asbestos Organic vapors & asbestos Acid gases & asbestos Organic vapors, acid gases & asbestos Ammonia, amines & asbestos Part Number R51HE R52HE R53HE R54HE 464029 464028 464027 464026 Supply Source Safety Shoe 233-0605 Safety Shoe 233-0605 1This Scott-O-Vista facepiece uses a twin cartridge adapter (Scott Part No. 802451-01) which is purchased separately from the facepiece (VSP Number 01-04342) 2jhis Scott-O-Vista facepiece uses a single canister adapter (Scott Part No. 802472-01 which is purchased separately from the facepiece (VSP Number 01-04340) -46- II. RESPIRATOR FOR A COMBINATION OF ASBESTOS & CHEMICALS (Cont'd) Respirator Manufacturer Cartridge Protects Aoainst: Part Number Supply Source Scott-O-Vistal - Willson 6100 Organic vapor & asbestos Acid gases & asbestos Organic vapors, acid gases & asbestos Ammonia, amines & asbestos Organic vapors asbestos Acid gases & asbestos Organic vapors, acid gases & asbestos Ammonia, amines & asbestos 642-OV-H 642-AG-H Vallen 265-8176 642-OA-H 642-AM-H T41 Briggs-Weaver T46 233-5451 T45 VSP 01-04286 T44 1This Scott-O-Vista facepiece uses a twin cartridge adapter Scott (Part 802451-01) which is purchased separately from the facepiece itself. (VSP number: 01-04342) III. CLOTHING Tyvek disposable Paper Coveralls with attached Hood and Boots Small Medium Large Extra Large 01-03551-001 01-03552-001 01-03553-001 01-03554-001 I 68*1661)18 -47-