Document BRBw0eag8jkOdeVppYDg2wQv4

MAR 1 5 1974 PLAINTIFF'S EXHIBIT MR. JOHN L. BESTLL Re: Asbestos Fib r Measurements Asbestos exposures have received increased attention over the past few years because of a growing consensus that a significantly higher incidence of cancer (1-2) has been observed among personnel exposed to asbesto' dust. Intermittent exposures of high concentration levels as well as long term exposures at lower levels have been found to cause malignancies. As a result of tin's developing understanding, new asbestos emission regulations have been promulgated for industries manufacturing or using asbestos materials,and the requirements for process testing and control have been made more rigorous to prevent unnecessary asbestos exposures. Environmental testing is also required under the new regulation. Western Electric employs transite in relatively small quantities as a heat resistant building material for firewalls in telephone central offices, and in other applications. Since transite is 50% asbestos and 50% Portland cement, an inorganic binder, its fabrication does generate asbestos particles which could become an exposure problem. If tiie results from the environmental measurements are found to be high, periodic medical examinations of employees working in the area will be needed at an estimated cost'to the Company of several hundred thousand dollars per year. Therefore, measurements which show that the concentrations ore low could benefit the Company by a direct cost avoidance. in tiie iciuficaticn of transite panels, sections are custom sawed witii small portable power tools to fit individual openings between floors in the central offices. Tiie panels thus serve as fire stops between the floors. Since each opening may be different, it is not practical to pre-form thorn to the exact final dimension and so eliminate the need for on-site fabrication. Tiie sawing operation generates a considerable amount of particulates which mostly fall onto tiie floor or, for tools equipped with filters, are collected by vacuum filtration. These particulates are removed and discarded. Additional protection is afforded tiie operator by a mask which is worn while the panel is being sawed. These provisions reduce tiie potential risk of asbestos fibers inhalation, but does not eliminate the possibli1ity, since other employees may be exposed in nearby areas. CONFIDENTIAL 003544 !'iR. JC!i:4 I.. BESTLL 2. TI,.-> (Jegreo of risk involved in fabricating the transite panels and w!.-tiier additional protective steps will be required in the future has heretofore been unknown. It was the purpose of this proj<ct to determine the magnitude of the potential exposures and to make any necessary recommendations. The asbestos measurements described in this report, were made by the authors at a central office in Columbus, Ohio. Mr. F. X. Worden coordinated the project and Mr. A. Skirptunas arranged for the sampling to be done for various sawing operations. Sampling and Measurement Methods T,' e sampling was done by drawing the environmental air through op^n face filters, 35mm in diameter, at a rate of 2,0 liters per minute. The sampling rate for a personnel sampler worn by the operator was 1.6 liters per minute. Type AA white, nongrid, glass-fiber filters were used. The counting was performed by commercial laboratories using 430X phase contrast microscopic examinations. Both tie sampling and fiber counting were done in accordance with the appropriate EPA and OSliA regulations. Samole Collection The sample sites were located relative to the sawing operation as depicted in Figure 1. The positions of the filter holders are given in Table 1 for each sample period. Each of the sample periods is for a sawing operation, as described in Table 2. The collected samples were sent to a commercial laboratory (Johns Manville Corporation) for counting. The results are given in Table 3. For sample periods A and B, the levels are lower than C-E because in the latter three periods, the sample positions were closer to the operator than- for the first two. Thus, they better represented-the actual exposure of the operator. The personnel monitor indicated a higher concentration level in general than the other positions. As expected, the concentration level was higher for positions 24" from the floor than for corresponding positions 36" high. Seven out of nineteen samples were in excess of the 1S76 TLV and one exceeded the present TLV. Since the operator wore a filter to remove t >e asuestos, lie was not exposed to high concentrations. However, CONFIDENTIAL 003545 *4 r,S. JOHN L. I3ESTEL in view of the potential hazard of smaller particles, control steps should be initialed to reduce the chance of inadvertent exposure. These steps should include prefabricating the panels by wet-cutting in all possible cases,and the installation of vacuum pick-ups on each saw used. If practical, panels with'knock-out segments could be precut in order to reduce the amount of on-site fabrication. Conclusion Tests have been made near areas where the fabrication of transite (50% asbestos) takes place. The results indicate tha. it is possible to be exposed to concentrations in excess of the 1976 TLV if simple precautions are not taken. Since it is unknown how much of the asbestos exists as particles smaller than 5 pm, it is recommended that additional tests be made te determine the total particulate content in the vicinity of the fabrication site, and to test for fibers larger than 2.0pro under conditions in which vacuum pick-ups are used. JED:RPM:DC Copy to: A. Skirptunas-Central Region J. P. Dunn. M.D.-222 Udwy. F. X. Worden-222 Bdwy. W. K. Hammel M. W. Saga! CONFIDENTIAL Q03546 -CONFIDENTIAL f Sample Period 1 A 5 ft. on right 3 ft. from floor Same as Period A C 3 ft. on right 15" from floor D Sane as Period C E Same as .Period C Table 1 Sample Positions SAMPLE STATIONS 2 on table 3 ft. in front 1.5 ft. from floor 3 5 ft. on left 3 ft. from floor 4 On Operators Lapel i Same as above 3 ft. on left 2 ft. from floor Same as Period A O O CO <1 Table 2 # Operating Conditions for Asbestos Sampling Sample Period A. B C D E Position/Situation Sample Time (min.) Reciprocating Saw HDMC-214. First used old blade SEELECT WE-3149. Second blade WE-R-314A First panel cut in 41 min. window open 74,62 Background during lunch break 67.4 Saber saw WE R* 4339, window closed . 65.2 Saber saw, second run 27.3 Reciprocating saw, second run 30.0 CONFIDENTIAL 003548 Sample Period A B C D E Table 3 Asbestos Concentrations Sample Station 1 2 3 4 T 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Concentrations 1 (fibers/cc) 1.9 0.2 0.3 1.9 0.1 0.1 2.5 0.4 2.9 3.5 2.4 1.3 1.7 2.8 0.9 5.2 1.2 2.4 CONFIDENTIAL 003549 Figure I. SAMPLE STATIONS FOR ASBESTOS AT THE COLUMBUS CENTRAL OFFICE t ', i - OzW wH>H O z (x/) z tU~ m CONFIDENTIAL zo _ cHo > t>o Z 1mu" 003550