Document BR5R6ZDn8vEw7p2eBBnG3xRpL
17
Glycol II March 1, 1991
Gerald Wagener Bldg. 2511 xc: John BarkBdale, Bldg. 3701
Dow U.S.A
t*-? Dow Chemical Company PO Bo* 150
Plaque"" -e Louisiana 70765-0150
R&D REACTIVE CHEMICALS REVIEW - JANUARY 22, 1991
PROJECT:
Glycol II 2-Yr Process Review
PROJECT REP:
Marcus James, Hal Martin, Steve Cook, Mike Kitt, and Tracey Downing
In reference to your letter dated 1/25/91, we have addressed your concerns:
1. Sample of Dowtherm A/Q will be submitted to the thermal lab for DSC and ARC Test during the 2Q91 - Marcus James
2. We will set-up a meeting with R&D Analytical to discusB the best method of positive identification for our Dowtherm A/Q shipments to Glycol II. Greg Miller, our laboratory technician, will be involved in the meeting. A procedure will be written once a method is established - Hal Martin
3. A meeting with Tech Center, Loss Prevention and Glycol II
personnel is scheduled for the week of March 11th to review operating conditions for EO compression section of plant - Marcus James
4. Plan to contact Hugh McLaurin to see if he has suggestons for a testing procedure to positively identify the oil. Will also contact CPI as suggested - Nathan Davis
5. Reactive Chemicals (ARC) testing performed for carbonate solution and methane stripping gas. No thermal activity detected. Will test carbonate and C-360 lube oil in near future. Will contact CPI about positive means of identification for C-360 lube oil Steve Cook
6. Flammability in air data is documented for the pure component ethylene glycols; however, none has been found for the mixtures. On this subject, the tri-reactor effluent (mix of DEG, TEG, TETRA EG and PENTA EG) is of particular interest. A Bample of this effluent will be submitted to R&D, so that auto-ignition temperature and flash point data can be generated. The need for this information should be on a routine basis - Tracey Downing
Dn A 135808 CONFIDENTS
Gerald Wagener March 1, 1991 Page 2
7. A meeting between plant personnel and Engelhard will be held during the 2Q91, to establish a procedure to de-activate the acetylene hydrogenation catalyst - Hal Martin
If you have any other questions on this matter, please feel free to contact me.
Wayi^e) Turner Plant Superintendent (504)389-8491 nlc
)
00 A 135809 OONFTDFNTTAl