Document BR2GdOZ7gEKrvJp2gY64QY80k

uJtJ'<O09 rf? ~?S INTERNAL CORRESPONDENCE PLAINTIFF'S EXHIBIT UC-4314 UNION CARBIDE CORPORATION n umniiual cl N rfr'-R PO BOX 036 1. SOUTH DTAMU-blUrs), WV UM'iCXJ E. Rucker -- 2009 512 ;oPyr,o j# Agosti - 2009/512 8. H. Avashia, M.D. - 23/512 W. L. Browning - 2009/512 -- R. E. Coyner - 2009/512 C. M. Hutsenpi11ir, Jr. - 77/512 S. E. II1ikainen - 2-228/512 C. P. Maxwell - 701/2 B. R. McMakin - 2009/512 R. J. Romagnoli - 303/101 u""' ............. . AneB August 25, 1987 EM&TS - HS&EA Industrial Hygiene Asbestos Exposure Monitoring , Attached are the results of asbestos monitoring for three days at the Cellosize Unit (Bldgs. 79 and 77) after the contamination of asbestos caused by a Heist blasting operation in the area south of building 77. All samples are well below the action level of 0.1 fiber/cc except the maintenance lunchroom area sample of building 77, collected on July 30, 1987. This sample was suspected of being "contaminated" as no other samples showed high levels of asbestos. In addition, two samples of dust collected off the air conditioner ledge and filter (approx. 3 feet from where the air sample was taken) were reported as nil for asbestos content as reported to this writer by the Institute Plant maintenance coordinator. The air conditioner was operating all day. The personal exposure samples were below the 0.2 fiber/cc permissible exposure level standard per 0SHA 29CFR 1926.58 and the action level of 0.1 fiber/cc as per the same standard. Employees wore no street clothes, two pair of coveralls, headcover, boots, gloves and an AO R57-A HEPA half-face cartridge respirator. They showered before lunch and at the end of the workday before leaving plant. UCC 011365 IH MONITORING - continued 2- - August 25, 1987 Please inform _ of their exposure monitoring results as soon as possible. Have them sign and date this report and return it to M. A. Patel at Building 701-330. If you have any questions or we can be of further assistance call us on extension 6485 or 3750. WORK BY: APPROVED BY: / VES:HJK:MAP:rab 2632P Manhar A. Patel UCC 011366 Date Sanple Type/ Enployee Name ASBESTOS EXPOSURE MONITORING Sanpling Time Air Cone. fiber$/cc TW7\8 fibers/cc Carp. Ref. W2265 W2266 W2267 COMMENTS 7/30/87 AREA 7/30/87 AREA 7/30/87 AREA 7/31/87 AREA 7/31/87 AREA 7/31/87 AREA 7/31/87 8/1/87 8/1/87 8/1/87 AREA 6hrs 17min 0.011 6hrs 20nin >*0.886 6hrs 13min 0.004 9hrs 8nin 0.022 3hrs lmin 0.007 8hrs 40nin 0.004 5hrs 12m'n 0.010 7hrs 40nin 0.008 13hrs 16min 0.008 13hrs 17min 0.003 0.006 0.009 0.013 30 feet west of southwest comer of Bldg. 77 at barricade at breathing zone level. In maintenance lunch rocm of Bldg. 77 on refrigerator at breathing, zone level. Under Cellosize Unit pipe half way on the east-west run at cooler on north side at breathing zone level. In lunchroom of Bldg. 77 on refrigerator at breathing zone level. 30 feet west of southwest comer of Bldg. 77 at barricade at breathing zone level. At doghouse (unloading shack) on south side of Bldg. 77 1 feet east of barricade at breathing zone level. Insulator was HEPA vacuuming equip ment and structure in toolroom of Bldg. 77 and shop area. Insulator was HEPA vacuuming equip ment and structure in toolroom of Bldg. 77 and shop area. Insulator was HEPA vacuuming equip ment and structure in toolroom of Bldg. 77 and shop area. At barricade outside door to maintenance toolroom in Bldg. 77 shop area. *See note in cover letter. 2632P UCC 011367 t t t