Document BLNgBVrgDXY7GGDrVV19qm4J

3Eisa.a-n--a-*H PLAINTIFF'S EXHIBIT hiiHU un f DTJP-2905 \ Co E. I. ou Pont de Nemours S Company ><aC8*Mrf* vVlLMINGTON. DELAWARE 19398 CNC;seai>: OEnTt(,r -ouvicbs iutuoiNa 1C U ........... :i = 5vuc.t-'.cr.icc-? J. Xlasse.-.-Du Pont of Kingston S.3. O'Shea-Ou Pont of Mississauga Ifr-3r----- no a C:t'. a.naca, : ar.ada, March 26, 1984 PRESENT: L. T. FREELAND - CHAIRMAN - POLYMER PRODUCTS - BEAU.' J. H. BERTELS - TEXTILE FIBERS - COOPER RIVER K. A. CHEN - CSP - CHAMBERS WORKS - BUILDING QCL J. F. DOUGHTY - POLYMER PRODUCTS - WASHINGTON WORKS E. J. KAHAL - PETROCHEMICALS - SAVANNAH RIVER - 3UILDING L. F. PERCIVAL - CRSD - HASKELL F. HURLOCK - STANDARDS SECTION ABSENT: R. L. BARNHART - PETROCHEMICALS - VICTORIA R. C. COOLEY - EMPLOYEE RELATIONS - NEMOURS w. C. HAAF - F5FP - BRANDYWINE BUILDING G. J. SZURLEY - P4EP - PARLIN p. W. WORMLEY - CRtD - EXPERIMENTAL STATION 402/3052B VISITORS: J. G. LOSCHIAVO - POLYMER PROOUCTS - WASHINGTON WORKS H. A. SMITH - POLYMER PRODUCTS - MONTCHANIN S62S STANDARDS SECTION - AIR QUALITY & OCCUPATIONAL HEALTH SUBCOMMITTEE MINUTTS F THE MEETING HELD TUESC .Y, MARCH 20, 1934 AT 9:30 A.M, IN ROOM 12423, NEMOURS BUILDING APPROVAL OF MINUTES The minutes of the September 27, 1983, meeting were approved. STANDARDS ISSUED IN APRIL sT2t S93 REVIEW ITEMS 1. S2H - Respiratory Protective Equipment (12/78) - L. F. Percival Percival will send marked copy to Hurloclt for distribution to subcommittee for final review at May meeting. OSHA sections should be indicated on draft for review. 2. S4T -Measurement and Control of Asbestos Dut Exposure (10/79) - r. c. Cooley "" Subcommittee reviewed Cooley's revised draft attached to distribution letter dated 3/12/84. However, sections 4 and 5 were incomplete and there was doubt whether this draft represented the latest agreed to revisions which were in Standards composition. Since the meeting, DUP 0907309 W' DU 028410 Air Quality s. Occupational Health Subcommittee Minutes 2 March 26, 1334 composition has completed latest draft with Cooley's meeting comments and redis to return comments to Cooley by 4/13/84. 3. 35? - Proposed Standard on Lead - L. F. Percival/w. C. Haaf Standard distributed for comment on Serial Letter No. 4766. Replies have been received and comment letter is being prepared. 4. S12T - Strategy for Work-Space Samplinq for Exposure to Chemicals (10/79) - K. A. Chen --------------------------- ---- Standard was issued in April. Chen will continue to monitor for future required revisions. 5. S14T - Polychlorinated Biphenyls (PCSs) - j. F. Doughty Subcommittee reviewed Doughty^s revisions to standard based on the 103 review comments received per Serial Letter No. 4753. Doughty will send final revisions for standard and comment reply iecter to Hurlock the week of April 2, 1984. Pinal draft will be reviewed by Oougnty only and issued. The new "PCB Guidebook," dated February 1984, developed by the Maintenance Engineering Group, ESD, Engineering Department was discussed. Hurlock will send Doughty a copy to review against 6. J3K - Compliance Testing of Emission Sources (11/79) - K. A. Chen Reaffirm and issue. J4K - Certification of Analyzers (11/79' - L. T. Freeland Reaffirm and issue. 3 . - Air Monitorir.z - for Farticulates (11/79) - J. G. Loschiavo Loschiavo will send revised draft to Hurlock by July 1 for distribution to subcommittee for review at September meeting. 9. JIN - Odor Threshold (11/79) - E. J. Kahal Kahal will send revised draft to Hurlock by April 13 for distribut to subcommittee for review at May meeting. .10 J1J - Selected References on Air Pollution (8/80) - P. W. Wormley Recommendation tor reaffirmation or revision at May meeting. .11 J6M - Noncontinuous stack sampling for Sulfur Dioxide (8/80) j. h. Bertels Bertels will send revised draft to Hurlock by July 1 for distribution to subcommittee for review at September meeting. .12 J3J - Conversion Factors (9/80) - R. L. Barnhart Barnhart will send minor revision to Hurlock and issue. 13. JIM - Measurement of Visible Emissions (11/80) - J. H. Bertels Bertels minor comments reviewed by subcommittee and given to Hurlock. To be sent to composition, final draft reviewed by Percival only, and issued. DUP 0907310 DU 028411 Air Quality i Occupational Health Subcommittee Minutes 3 March 26, 1334 14. S3H - Fit Testing of Pesoiraccrv Protective Scuicme'-* -i =- Li F. Percival" ' 1 1' 1--:-- Percival'3 comments reviewed by subcommittee and given to Hurlcc To be sent to composition, final draft reviewed by Percival onlv and issued. 15. 313T - Hardware for Work-Space Sampling ar.d Analytical Methods (11/30) - W. C. Haaf " ~ Recommendation, for reaffirmation or revision at May meeting. 16. S2T - Exposure Limits for Airborne Contaminants - L. T. Freeland Freeland will send revised draft to Hurlock by May 15 for distribution to subcommittee for review. Comments to be sent to Hurlock by June 15. Comments to be sent to composition and issued. 17. J5L - Calibration Gas Standards for Ambient Air Monitoring - L. T. Freeland ~" " Recommendation for reaffirmation or revision at May meeting. GENERAL The subcommittee requested a booklet be assembled containing the latest issues of all the Air Quality & Occupational Health standards for each member. Copies will be available for the May meeting. ADJOURNMENT The meeting adjourned at 3:45 p.m. NOTE: MEETING CHANGES i The next meeting of the Air Quality & occupational Health Suboo-m:-. is rescheduled to Tuesday, Mav 9, 1934, at 8:30 a.m. in Room 5725, Montchamn Building. The August meeting has been rescheduled to Tuesday, September 13, . at 8:30 a.m. in Room 5725, Montchanin Building. The November meeting remains unchanged and is scheduled for Thursda .November 1, 1984, at 3:30 a.m. in Room 13067, Du Pont Building. FH: kf DUP 0907311 DU 028412