Document B8qzgMGz7N5va7QZawK3EkGd4

't EXX-MOR-006267 9sooo72-a*^- ; MEM3R^-i)[iM <a.-668> TO ' Mr. Ken Waldorf PROM E.J. Worrel, Jr. SUBJECT ESSO HOUSTON- Repairs at Newport News Shipbuilding and Drydock So., Dec.i- 6, 1970. ATE FILE NO- Dec. 9,1970 Captain; Me Bride Chief Engr: Bov Boarded vessel at Newport News Shipbuilding and Drydock CoT at 1SOO, I, 1970 for supervision of repairs. The vessel arrived at the yard at 1030, Dec.I, 1970. Dec, The repairs are as eneumerated In the attached job specifications with a further description ofCwhat was done listed below; lthru 10 routine. No change0 II. OK 12. OK 13. OK 14. OK 15. Necessary to remove throttle valve to drill out stud. 16. All hangers were found satisfactory. 17. Pipe located on main deck, stbd side. Brass pipe used. 18. Cancelled, 19* Two of the wipers were found satisfactory with a little adjustment but one required the removal of outer sheathing for accessibility. 20. Cancelled- duplication. 21. Lead gasket renewed,owner furnished. 22. OK. 23 Minor ad ju s tment. 24. Deep tank instead of peak tank. 25. Deep tank instead of peak tank. 4 valves instead of six, 26. OK 27. 4 waterboxes removed instead of 2. Both heaters,wire brushed tubes. 28. OK 29. Should be'1 and timing controls'* instead o^to'.1 This was to one set of 3 boxes. Dead ground also removed from boxes. 30. OK 31. OK 32. OK 33. CK 34. Ground corrected by permanently disconnecting lights as Captain and Chief Mate stated that all of the crew were issued flashlights and that the target light was not used, 35. OK _ 36. OK 37. Angles used to hold temporary ice box on deck. Safety hazard. 38. Brass pipe used. 39. CK 40. This should be Shand and jurs gauging device. OK. EXX-MOR-006268 -ScTb.0072*^ ' MEMORANDUM (A-66S) TO / FROM SUBJECT ESSO HOUSTON- Continued DATE FILE NO. 41. Top cover renewed, 42. OK. 45, OK, 44. (a) OK* (b) adjusted but not tested due to no steam to bow thruster. (c) Seals renewed, but Bird-.Johnson representative indicates that loss of oil could have been from another source, particularly the outer seals of individual blades. The Chief Engr will watch the condition and report. 0 Note: Operation of bow thruster could hot be checked due to steam expansion joint not being installed* 45. CK. 46. CK. Tubes wire brushed. 47. CK except 3" by-pass valve to after deck steam line should be opened in May for further examination and determination if seat is fractured. A hairline was noticed in seat but was not deemed serious enough to remove at this time* f ' In addition the steam , 2-J-" stop valve and the 4" exhaust valve ofrthe Butterwofcth pump turbine were opened and worked. Also the steam valve to the Butterworth Heaters was opened and ground in and packed. A fracture was found in the seat of the steam valve to the inboard feed pump. The valve,which. is welded-in, was removed to the shop and ` lapped -in to the extent that the fracture was removed as proved by dye-checking.The valve was reassembled and welded in place using cer tified welders, then magnifluxed and stress relieved. ^ 48. OK. 4 leaks. 49. 6 tubes renewed. Double roll* Removed and cleaned demister filters on one side. 50. 4"x411 doubler installed* 51. OK. 52. Should be"fiberglass patch" . 1511 of pipe renewed along with 1 flange and 1 elbow 2" size* 53. OK* 54. "0n new spud"should be deleted* The fitting was taken to the shop and dismantled. It was found that both swivel balls were pitted badly and the packing had disintegrated* The balls Yi/ere machined which necessita ted ^tHe-cuttluig-oT-THe6Tr-pipe which was re-welded after machining. The weld was done b>jgc a certified welder and then xrayed. The xray showed a defective weld so the defect was ground from the weld, rewelded xrayed and then stress relieved, Mew packing was ordered but not received prior to the departure of the vessel so blanks were put on the flanges of the steam line of the bow thruster pending the installation of the fitting at a later date. 55. OK Shouldobe"focusle head11. : 56. OK. 4 turnbuckles renewed* '*. 57. OK. 1 'i ii i >,A EXX-MOR-006269 f SUBJECT ESSO HOUSTON- Continued FROM DATE 58. OK plus 1- 2" nipple. Difficult gas freeing. 59. OK. Renewed ov/ner furnished disc. 60. OK. 61. OK. 62. OK. Seat and disc faced. 63. OK. 18" nipple and one flange. Alsorenewed 10* of vent line from diesel storage tank. 1 union. 64. OK. 65. OK. 66. OK. 65. OK. Wire brushed all cooler tubes. 68. Filled condenser above top row offtubes and applied 12# of air pressure. Hugged 19 tubes all in the lower half of the condenser. This makes a total of 39 tubes being plugged. In addition approximately e. 100 tubeswere leaking at the packing and were recaulked. Waterboxes were patched with red hand cement where damaged. Condenser does not have Swedish iron or similar metal anodes but instead has the CAPAC system. 69.- OK. 70. OK. 71. OK. Should be"carbon packing". 72. I dont recall whether this item was done or not. 73. OK. Not only the main condenser but also the injection and discharge piping and lube oil cooler was reworked. 74. These fractures were picked up during the repair to the transverse bulkhead between the port deep tank and the #1 Port carge tank. 75. Not listed. Remove starting lever from top of Auxiliary diesel apd braze broken end and reinstall. Done. 76. Not listed. Open furnace access door of Boiler for exam.of furnace. Note: It was observed tnat the port lower half tube sheet of the main cond- (a) enser is pitting along with the ends of the tubes.At the next shipyard period this condition should be studied for corrective methods. (b) Heavy hard scale on 2 forward superheater tubes.Should be cleaned in May (c) Also that the forward port and Stbd Ballast tanks and the #7 portand Stbd Ballast tanks need a good cleaning and removal of sediment. Vessel arrived with 28,000 bbls of sludge in #4 Center cargo tank which was discharged into a barge along side where the water was separated from the oil.This maneuver was not completed until 0600, Dec. 3, 1970. The plant could not be secured until the completion of the discharge of the sludge and the obtaining of the gas free certificate. In reference to OCMI, Portland Itr of 16 Nov., 1970 the following was correeted at Newport News, Va., and checked by Cdr Brittan of the local Marine Inspection office; cc: Mr. H. A. Thompson EXX-MOR-006270