Document B8noQ8eOQYe9yrr9RaBgO3JZw
ELECTRONIC MAIL CONFIRMATION OF EMAIL RECEIPT REQUESTED
Larry Carr, President Coahoma County Utility District PO Box 1488 Clarksdale, Mississippi 38614 larrycarr6056@gmail.com
Re: NPDES Permit No. MS0045187, Reconnaissance Inspection Report
Dear Mr. Carr:
The U.S. Environmental Protection Agency, Region 4, and the Mississippi Department of Environmental Quality (MDEQ) inspected the Farrell Publicly Owned Treatment Works (the facility) located off Farrell Road in Farrell, Mississippi on February 1, 2022, for compliance with its National Pollutant Discharge Elimination System (NPDES) permit and the Clean Water Act (CWA).
The inspections findings and recommendations are provided in the enclosed Reconnaissance Inspection Report. If you have any questions about the inspection report, please contact John C. Goodwin at 404-562-8488 or via email at goodwin.john@epa.gov.
Sincerely,
Digitally signed by
Castillo, Jairo Date: 2022.04.01 Castillo, Jairo
12:29:45 -04'00'
Jairo Castillo, P.E., Chief Enforcement and Compliance Division Water Enforcement Branch
Enclosure
NPDES No. MS0045187
MO/DAY/YR 2/1/2022
United States Environmental Protection Agency Region 4
Reconnaissance Inspection Report
SECTION A: National Data System Coding
Inspection-Type
Inspector
ROS
John C. Goodwin
SECTION B: Facility Data
Name and Location of Facility Inspected (For industrial users discharging to POTW, Entry Date/Time
also include POTW name and NPDES permit number)
Farrell POTW, Farrell Road, Farrell, Mississippi
10/13/2021 1:30 PM Exit Date/Time
10/13/2021 3:15 PM
Names of On-site Representative(s)/Title(s)/Phone and Fax Number(s)
Other Facility Data
J Thomas Robinson, Operator, 662-541-2863
N/A
Bailey Long, MDEQ Inspector, 601-961-5591
Name, Address of Responsible Official/Title/Phone and Fax Number Larry Carr, President of Coahoma County Utility District
Contacted
Yes
No
Facility-Type Publicly owned treatment works
Permit Effective Date 6/19/2019 Permit Expiration Date 5/31/2024
SECTION C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit
Flow Measurement
Operation &
CSO/SSO (Sewer
Maintenance
Overflow)
Records/Reports
Self-Monitoring Program Sludge
Pollution Prevention
Handling/Disposal
Facility Site Review Compliance Schedules
Pretreatment
Multimedia
Effluent/Receiving Waters
Laboratory
Storm Water
Other:
SECTION D: Summary of Findings/Comments (Attach additional sheets of narrative and checklists as necessary)
Failure to report DMR; exceedances of Ammonia Nitrogen, Total Suspended Solids, and biochemical oxygen demand (BOD5).
Name(s) and Signature(s) of Inspector(s)
John C. Goodwin
Goodwin,
Digitally signed by Goodwin, John
John
Date: 2022.04.01 13:41:27 -04'00'
Tristan Odekirk
Odekirk, Tristan
Digitally signed by Odekirk, Tristan Date: 2022.04.01 13:36:22 -04'00'
Signature of Management QA Reviewer
Jairo Castillo
Digitally signed by
Castillo, Jairo Date: 2022.04.01 Castillo, Jairo
12:30:01 -04'00'
Agency/Division/Phone Number USEPA/ECAD WEB/(404) 562-8488
USEPA/ECAD WEB/(404) 562-9295
US EPA/ECAD WEB/(404) 562-9257
Date 4/1/2022
Date 4/1/2022
Date 4/1/2022
Page 2 of 8
United States Environmental Protection Agency Region 4
Reconnaissance Inspection Report (Continued)
Section D: Summary of Findings / Comments
On February 1, 2022, the EPA and MDEQ conducted a Reconnaissance Inspection (RI) at the Coahoma County Utility District - Farrell Publicly Owned Treatment Works (POTW). EPA met with MDEQ official, Bailey Long and facility official, Mr. J Thomas Robinson and held an opening conference explaining the reason for the inspection. The inspectors conducted a physical site inspection; reviewed documents; discussed Discharge Monitoring Reports (DMR) submittal and the future operation of the facility. The following is a summary of the RI findings and observations.
I. Records/Reports
A review of EPA's Enforcement and Compliance History Online (ECHO) database shows "Failure to report" on the DMRs. Mr. Robinson informed the inspectors that Larry Cook, Sr., was the previous operator and no prior logs or documents were made available to him from Mr. Cook. Mr. Robinson became the operator of the facility in October 2020. There were two quarters with discharge since Mr. Robinson's start at the facility. As noted in MDEQ's 2019 inspection report, MDEQ informed Mr. Cook that all records should be kept for three years and that DMRs must be submitted on time. EPA's ECHO database identified the eight quarters prior to Mr. Robinson's arrival for Failure to Report DMR - Non-Receipt.
II. Facility Site Review
The Farrell POTW consists of a two-cell lagoon system in series with a depth of 6 to 8 feet. The POTW treats the septic overflow of approximately 200 citizens via one pump station. It was not known when exactly the facility began operation. The POTW is designated as a Minor Municipal NPDES facility with a design flow of 0.3MGD. The lagoon system is located on fenced 1-2 acres. The lagoon system utilizes a chlorination and dechlorination station with chlorine and sodium sulfate tabs (Figure 1). The discharge point has a V-notch weir to stairway aeration to a drainage ditch that eventually leads to the Yazoo River (Figure 2).
There was some vegetation growth noted with tree trunks of 1 to 3 inches around the lagoon banks that needed to be addressed (Figures 3 & 4). No floating solids were observed during the inspection. There was no discharge at the time of inspection. Mr. Robinson informed the inspectors that no discharge had been recorded in the previous year. There was a turtle carcass that had become wedged in the lagoon's line to the chlorination station. The last quarters of discharge were recorded in October 2020 to March 2021, according to Mr. Robinson. A foamy liquid was observed prior to the discharge point at the weir. When the area floods, the ditch backs up to the chlorination station.
The pump station was inspected and there is still washout underneath the pad as noted in the 2019 MDEQ inspection (Figure 5). No evidence of any spills was noted, and the pump(s) were operable.
There were only two sampling documents available for review. The chain of custody was not completed by the person taking the sample and relinquishing it. The Permit was not available for review. The DMRs are signed by Charles Fitz, Secretary of Coahoma County Utility District #2. The operating logs did not indicate the person conducting the inspections.
Page 3 of 8
The EPA recommends that the facility submit any outstanding DMRs, if possible. The vegetation around the lagoon needs to be maintained. The pump station base should be maintained to prevent any damage to the structure. The chain of custody for sampling events should be properly documented. Operating logs should identify the operators performing routine inspections.
Section E: Photos
Figure 1: Chlorination Station
Page 4 of 8
Figure 2: Discharge point to ditch with foamy liquid before V-notch weir.
Page 5 of 8
Figure 3: Vegetation growth that needs maintenance at cell 2.
Page 6 of 8
Figure 4: Additional vegetative growth on cell 1.
Page 7 of 8
Figure 5: Washout at pump station pad.
End of Report
Page 8 of 8