Document B8jgwnq8RJzpv9Y6MM911pg9w

tetsopOl r CHECK STARTING #2 DH STILL rev 07/90 ACTION STEPS (all caps) COMMENTS (below steps) X. WARM THE 50# STEAM HEADER AND OPEN BY-PASS TO REMOVE CONDENSATE. 2. START FEED PUMP AND ESTABLISH FEED FLOW TO THE COLUMN. Normal feed flow is 25 - 30 gpm. 3. ALLOW LEVEL IN COLUMN TO BUILD TO OPERATING LEVEL AND START BOTTOMS PUMP. Recycle still bottoms to feed tanks. 4. PUT DH STILL LCV ON AUTOMATIC @ 50%. 5. OPEN STEAM FCV AND BLOCK TRAP BY-PASS WHEN ALL CONDENSATE IS DRAINED. 6. PUT STEAM FCV AT AUTOMATIC AT ABOUT 2000 LBS/HR. 7. SAMPLE STILL BOTTOMS AND SWITCH BOTTOMS FORWARD TO THE DH PRODUCT TANK WHEN "DRY". "Dry" is considered any moisttre < 100 ppm. SL 00)40) CONFIDENTIAL: to protective Order of No. -