UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 4
ATLANTA FEDERAL CENTER 61 FORSYTH STREET SW
ATLANTA, GEORGIA 30303-8960
SENT VIA ELECTRONIC MAIL
Mark Redditt Terminal Manager CITGO Petroleum Corporation 720 South Second Street Nashville, Tennessee 37213 Mreddit@citgo.com
Dear Mr. Redditt:
Enclosed is a copy of the final report generated by the U.S. Environmental Protection Agency's Region 4, North Air Enforcement Section, for the inspection conducted at the CITGO Petroleum Corporation facility, located in Nashville, Tennessee, on July 11, 2022.
If you have any questions, please contact me at 404-562-8134, or by email at Zhong.Baichen@epa.gov.
Sincerely,
Digitally signed by BAICHEN
BAICHEN ZHONG ZHONG
Date: 2022.09.01 16:44:53 -04'00'
Baichen Zhong Environmental Engineer North Air Enforcement Section
Enclosure
CC: John Finke, Nashville Metro Public Health Department
ENCLOSURE A FINAL INSPECTION REPORT
United States Environmental Protection Agency (EPA) Region 4 Air Enforcement Branch Inspection Report
I. GENERAL INFORMATION Facility Name: CITGO Petroleum Corporation Location (Address): 720 South Second Street, Nashville, TN
Inspection Date: 7/11/2022 Type of Inspection (Full or Partial Compliance Evaluation): Partial Compliance Evaluation ICIS-Air Number: TNNDC0004703700061-2022 EPA Investigator(s)/Inspector(s):
1. Baichen Zhong, Environmental Engineer 2. Nicole Radford, Environmental Scientist State/Local Investigator(s)/Inspector(s): 1. Blake McClain, MPHD 2. Brittany Maloy, MPHD Person(s) Contacted at Facility (Name and Title): Mark Redditt, Terminal Manager Report Prepared by: Baichen Zhong
Project Name: CITGO Petroleum Corporation ICIS/Project No.: TNNDC0004703700061-2022
Document Number: AEBFORM-012-R0 Title: Inspection Report Template Effective Date: May 1, 2019
Page 1 of 10
II. FACILITY INFORMATION A. Facility and Permit Information
Facility and Permit Information
Comments
1. Type of facility (e.g., chemical plant, refinery, cement manufacturer, etc.).
2. Air permit number(s) and type of permit (e.g., Title V, PSD, Synthetic Minor, etc.).
3. Air permit issuance date.
4. Air permit expiration date.
5. Facility classification (Major, Synthetic Minor/Conditional Major, Minor).
6. Major source pollutants (if
Bulk petroleum distribution terminal.
The CITGO Petroleum Corporation terminal facility is operating under Synthetic Minor Operating Permit Nos. 61-1, 61-4, 61-6, 61-8, 61-9 61-10 and 61-11. These permits are issued by the Metro Public Health Department of the Metropolitan Government of Nashville and Davidson County. Date of Issuance: July 1, 2022 Expiration Date: June 30, 2023 CITGO Petroleum Corporation is classified as a Synthetic Minor source.
VOCs
applicable).
7. Applicable regulations (e.g., State Implementation Plan, MACT Subpart FFFF, NSPS Subpart EEEE, etc.).
8. Types of air emission points (e.g., tanks, process vents, boilers, etc.).
9. Types of air pollution control equipment (e.g., baghouse, scrubber, afterburner, etc.).
40 C.F.R. Part 63 Subpart BBBBBB
The facility has a fixed roof tank for distillate and floating roof tanks for gasoline, ethanol, gasoline and ethanol blends, and distillate. A loading rack with a Vapor Combustor Unit (VCU) is also present. A VCU is used to control emissions at the loading rack.
Project Name: CITGO Petroleum Corporation ICIS/Project No.: TNNDC0004703700061-2022
Document Number: AEBFORM-012-R0 Title: Inspection Report Template Effective Date: May 1, 2019
Page 2 of 10
B. Process Description (provide narrative or attach description provided by the company or excerpts from the permit)
CITGO Petroleum Corporation is a bulk gasoline facility that handles gasoline, diesel fuel, ethanol, additives, and other volatile organic products. These products are delivered to the facility by pipeline, or trucks in the case of ethanol, and stored in internal floating roof and fixed roof storage tanks. The products are loaded into trailer trucks using loading racks at the facility. Hours of operation for truck fueling are 24 hours per day, 7 days per week. The terminal is manned Monday - Friday during the day.
III. INSPECTION ACTIVITIES Activity
Opening Meeting 1. Date and time entered the facility. 2. Credentials presented to facility
personnel (include name and title). 3. Conducted an opening meeting to
explain the purpose and objectives of the inspection.
4. Discussed safety issues.
5. Discussed which records to be reviewed.
Yes
Comment
No
NA
Y The EPA Region 4 (R4) inspectors conducted the inspection on July 11, 2022 and entered the facility at 1:00 pm.
Y Upon arrival on site, R4 inspectors presented credentials to Mark Redditt, the Terminal Manager during the opening meeting.
Y An opening meeting was conducted, which was led by Nicole Radford (R4). The purpose of the inspection was explained. The facility was also informed that the focus of the inspection would be on compliance with the NESHAP 6B, observing gasoline storage tanks, the loading racks, the vapor control units and the process contact water (PCW) systems.
Y Safety issues were discussed with the Terminal Manager and it was determined that no specific personal protection equipment was required, though eye protection was worn for the duration of the inspection.
Y Records that were needed for review were discussed during the opening meeting and during the closing meeting, where the facility committed to sending the records
Project Name: CITGO Petroleum Corporation ICIS/Project No.: TNNDC0004703700061-2022
Document Number: AEBFORM-012-R0 Title: Inspection Report Template Effective Date: May 1, 2019
Page 3 of 10
6. Discussed the facility walk-through Y and the areas to be observed in the facility.
7. Discussed facility policy regarding Y photographs or video (if applicable).
8. Discussed the use of the infrared
Y
camera, TVA, PID, and any other
equipment.
9. Discussed CBI.
Y
Records Reviewed at the Facility
10. The types of records reviewed and
Y
the time period reviewed.
Project Name: CITGO Petroleum Corporation ICIS/Project No.: TNNDC0004703700061-2022
Document Number: AEBFORM-012-R0 Title: Inspection Report Template Effective Date: May 1, 2019
Page 4 of 10
that were not produced during the time of the inspection. During the opening conference R4 inspectors informed the facility that the main areas of review would be the gasoline storage tanks, the loading racks, the vapor control units and the PCW systems. Region 4 inspectors indicated a digital camera would be used during the inspection. The team discussed facility policy regarding photography and videography. Inspectors indicated that copies of any videos or photographs taken at the facility would be sent to the company. A log of photographs taken at the facility is included in this report. See Appendix A. R4 inspectors indicated that the infrared camera was going to be used during the walk-through of the facility. EPA inspectors indicated that any documents claimed to be Confidential Business Information (CBI) would be treated in accordance with regulations.
1.) At the time of the inspection, the R4 inspectors received the following records: a) the site plans for each of the main areas of the facility; b) a tank inventory; c) Semi-annual monthly leak detection and repair report (September 2021-June 2022); d) Monthly inspection reports for internal floating roof and external floating roof tanks (January - June 2022); e) monthly tank throughputs; and f) VCU preventative maintenance checklist.
2.) The records that were sent following the inspection were:
a) the last American Petroleum Institute (API) test for Tank 1 (Tank 1 was out of service January 2022 due to gasoline found in roof drain. Tank 1 back in service by May 2022).
Facility Walk-Through Observations
11. The process equipment observed
Y On July 11, 2022, at 2:00 pm, the R4
and the associated operational rate
inspectors began the facility walkthrough.
observed (e.g., Furnace 1
The inspectors observed the two-bay
production rate was 5 lbs/hr on
loading rack, the VCU, Tanks 1, 2 and 3,
1/1/15, at 2:00 pm - permit requires
and PCW tanks Nos. 11 and 6.
max rate at 6 lbs/hr).
For the tank observations, there were
Provide the date and time the
emissions observed with the infrared
information was recorded by the
camera from the southeast side of the Tank
inspector.
1 seal and the north side of the Tank 2 seal
along the bottom. Emissions were also seen
Identify the permit limit (if
through the hatch of Tank 3 via the infrared
applicable).
camera. The emissions were recorded in
videos. In addition, a video was recorded
An attachment may be used for a
for the VCU while a truck was loading at
large amount of information.
the loading rack.
Table 2 of NESHAP 6B references the requirements of NSPS Subpart XX [Standards of Performance for Bulk Gasoline Terminals]. NSPS Subpart XX Section 60.502(i) states that no pressurevacuum vent in the bulk gasoline terminal's vapor collection system shall begin to open at a system pressure less than 4,500 pascals. This converts to a pressure of 18.1 in. H2O. No emissions were noted for the pressure relief valve (PRV) with the infrared camera.
12. The type of process parametric
N/A
monitoring observed and the
associated value observed (e.g.,
Project Name: CITGO Petroleum Corporation ICIS/Project No.: TNNDC0004703700061-2022
Page 5 of 10
Document Number: AEBFORM-012-R0 Title: Inspection Report Template Effective Date: May 1, 2019
PCW Tanks/Storage 11 and 6 were observed. No detectable emissions were seen through the infrared camera.
Furnace 1 flux injection rate was 200 lbs/batch at 1/1/15, at 2:00 pm - permit requires max rate at 225 lbs/batch).
Provide the date and time the information was recorded by the inspector.
Identify the permit limit (if applicable).
An attachment may be used for a large amount of information.
13. If process equipment or parametric N/A monitoring equipment was not operating, state the reason by facility personnel why the equipment was not operating.
14. The type of air pollution control
Y The loading rack PRV had a setpoint of 18
equipment, the process equipment it
inches of water.
is controlling, and the associated
parametric monitoring value
A VCU (installed 2005) is used to control
observed (e.g., baghouse pressure
VOC emissions from the loading racks.
drop, temperature, scrubber flow
rate, etc.).
(For example - RTO 1 controlling furnace 1, 1,500 degrees F on 1/1/15, at 2:00 pm - permit requires 1,400 degree F or higher).
Provide the date and time the information was recorded by the inspector.
Identify the permit limit (if applicable).
Project Name: CITGO Petroleum Corporation ICIS/Project No.: TNNDC0004703700061-2022
Document Number: AEBFORM-012-R0 Title: Inspection Report Template Effective Date: May 1, 2019
Page 6 of 10
An attachment may be used for a large amount of information.
15. Continuous emissions monitoring N/A devices and values observed. (e.g., CEMS, COMs, etc.).
Provide the date and time the information was recorded by the inspector.
Identify the permit limit (if applicable).
An attachment may be used for a large amount of information.
16. If air pollution control equipment N/A was not operating, state the reason by facility personnel why the equipment was not operating.
17. Capture and collection system
N/A
(enclosures and hoods)
observations, if applicable (e.g., the
magnitude and duration of emission
escaping capture from the hood).
18. Ductwork transferring the emissions N/A to the air pollution control device observations, if applicable (e.g., the magnitude and duration of emission escaping from the ductwork, holes or deterioration in ductwork, no deterioration observed, etc.).
19. Any existing unpermitted emission N/A points, new unpermitted emission points, or non-permitted construction activities observed. (if
Project Name: CITGO Petroleum Corporation ICIS/Project No.: TNNDC0004703700061-2022
Page 7 of 10
Document Number: AEBFORM-012-R0 Title: Inspection Report Template Effective Date: May 1, 2019
yes, describe in the comments field).
20. Were any visible emissions
N/A
observed? (if yes, identify the
location and equipment).
21. Was a Method 9 reading
N/A
performed? (if yes, identify the
location and equipment).
22. Was the cause of the visible
N/A
emissions investigated and the
information documented?
23. Was a Method 22 performed for
N/A
visible emissions? (if yes, identify
the location and equipment).
24. Identify the cause of the visible
N/A
emissions as explained by facility
personnel, if applicable.
25. Was the infrared camera used? If so, Y See Attachment A for the video log. attach the video log (which includes the equipment ID, and the date and time the video was recorded) and videos to this report.
26. Was the TVA used? If so, identify
N
the equipment monitored and the
results.
Provide the date and time the information was recorded by the inspector. Include actual instrument readings for each piece of equipment monitored above the leak
Project Name: CITGO Petroleum Corporation ICIS/Project No.: TNNDC0004703700061-2022
Page 8 of 10
Document Number: AEBFORM-012-R0 Title: Inspection Report Template Effective Date: May 1, 2019
definition and/or where the infrared camera identified a release.
An attachment may be used for a large amount of information.
27. Was the PID used? If so, identify
N
how the PID was used and the
results.
Provide the date and time the information was recorded by the inspector.
An attachment may be used for a large amount of information.
Closing Meeting
28. Conducted a closing meeting.
Y
29. Summarize any additional
Y
information needed, if applicable?
30. Accept a declaration of CBI, if
N
applicable?
31. Discussed observations.
Y
32. Discussed next steps, if applicable? Y
33. Date and time inspection concluded.
Miscellaneous
Project Name: CITGO Petroleum Corporation ICIS/Project No.: TNNDC0004703700061-2022
Document Number: AEBFORM-012-R0 Title: Inspection Report Template Effective Date: May 1, 2019
Page 9 of 10
A close out meeting was conducted at approximately 4:00 pm CST. The inspection team discussed findings with terminal staff. Additional records including the API 653 inspection report for Tank 1 and the Tank 1 post repair memo were sent to R4 inspectors via email. Facility personnel did not declare or claim any documents as CBI. The R4 inspectors discussed what was seen and observed during the inspection at the closing meeting. It was noted that a copy of the infrared camera videos would be sent to the facility for their review. The R4 inspectors stated that both the infrared camera videos and inspection report will be sent to the company for facility's review for CBI. Following this step, R4 would proceed to finalize and issue a final report. The inspection concluded on July 11, 2022, at 4:15 pm.
34. Include any additional observations, if applicable.
EPA Investigator/Inspector Signature: EPA Supervisor Signature & Title Date Report Finalized:
BAICHEN ZHONG Date: 2022.09.01 16:45:27 -04'00' Digitally signed by BAICHEN ZHONG
___________________________________________
Digitally signed by JASON
JASON DRESSLER DRESSLER
_______________________D_a_te_:_20_2_2_.0_9_.0_2_0_8:_0_8:_34_-_0_4_'0_0' Jason Dressler, Chief, North Air Enforcement Section September 2, 2022____________________________
Project Name: CITGO Petroleum Corporation ICIS/Project No.: TNNDC0004703700061-2022
Document Number: AEBFORM-012-R0 Title: Inspection Report Template Effective Date: May 1, 2019
Page 10 of 10
Attachment A - List of Videos During the July 11, 2022, inspection, EPA Region 4 staff used an infrared camera to record equipment at the CITGO facility located in Nashville, Tennessee. Below is a list and description of the footage.
Table 1: Videos taken during the July 11, 2022, inspection
Image Number
File Name
Date and Time
1
MOV_0432.mp4
7/11/2022 02:09 PM
2
MOV_0433.mp4
7/11/2022 02:12 PM
3
MOV_0434.mp4
7/11/2022 02:21 PM
Description of Image Tank 1 Southeast side of the seal
Additional video of Tank 1 Southeast side of the seal North side of Tank 2 seal
4
MOV_0435.mp4
7/11/2022 02:27 PM
VCU while a truck was
loading at the loading
racks
5
MOV_0436.mp4
7/11/2022 02:31 PM
Tank 3 open hatch