Document B8M8R11YwYGY5qD7BGRyvwOzo
ABD00175219
VCM SURVEY REPAIR LIST
LOCATION type
DESCRIPTION
REPAIR CONCENTRATION STATUS
NM V(L) Manway into the New Module FVCM Receiver 100 ppm
Complete
NM F(G) At RX-743 on top of the Condenser on the North side next to Bleeder Valve 590
50 ppm
Complete
NM F(G) At RX-743 on top of the east side Condenser Recovery Line Flange between Valve and Condenser
120 ppm
Complete
NM F(L) Under Elowdown Tank on top of South Filter upstream of the New Module Blowdown Tank
75 ppm
Complete
OM F(L) East of Pressure Gauge 145 on the top vertical Flange connected to the vent on top of the South Batch Water Stripper
100-150 ppm
Complete
CM F(t) North of the VCM Condenser in the Old Module on the valve on top of the West Header
500 ppm
Complete
OM F(G) At RX-400 on the Flanged top
500 ppm
Complete
OM V/F(G) On the Vent Line leking from the bottom the Flange below the Pressure Relief Valve, between the 3" Tufline VAlve with the 3" Flange
100-200 ppm
Complete
TF V(L) The upper most valve above the pump at the north VCM pump at the Tankfarm
800 ppm
Complete
F - Flange L - Liquid Service V - Valve G - Gas Service