Document B8DgR0XY4gq8288ZZraD2L1Qw
Monsanto
rOM i N A M f A LOCAHONi
K. E. Boucher, W. G. Krummrich Plant
DATE '
.
SUBJECT
;
R* ERENCE
Novemb er 25, 1975
MCS 1238 PROJECT--PROCESS FLOW SHEET REVIEW-- NOVEMBER 13, 1975
c<^ B. C . Bosse A. E. Leisy W. L. Smull
TO T. N. Carrico
R. J. Crump W. J. Crabtree W. C. Engman G. L. J ohns on R. L. Heider A. C. Lewis R. L. Nelson T. R. Vehige
The following changes will be made based on comments received during the MCS 1238 process flow sheet review on November 13, 1975.
DWG. TSD-12694
,'
1. Will plan to use -polishing filter at the 11-4 unloading dock for MIPB.
2. Position of eductor versus LI in #2 intermediate tank will be checked.
3. An overflow for conservation vent on #2 inter mediate tank will be included. Dip pipe for #2 intermediate tank will be removed. A sight glass in siphon break will be included.
4. Condition of the floor at the south end of the lean-to will be checked.
5. Galvanized pipe will be used for the N2 supply line.
DWG. TSD-12695
1. Scheme for drumming finished goods will be simplified by only circulating at the tank when drumming.
2. ` One valve will be tagged "FOR REWORK ONLY."
3. Valves at #10 storage tank not accessible will be chain operated.
DSW 294964
STLCOPCB4065479
MCS 1238 PROJECT PROCESS FLOW SHEET REVIEW NOVEMBER 13, 1975.
Page 2 11/25/75 WGK
DWG. TSD-12696
iPyj ,,/l.
l. /Vt./7
Line between #4 mix tank and porocel column can be blown back to mix tank.
A restriction orifice will be included in the direct recircu lating line at #4 mix tank.
^3<"" Length of dip pipe in #4 mix tank in recirculating line having the in-line mixer will be minimized to 14 feet.
A bypass around the FCV for the porocel column will be included..
5. Coil in //4 mix tank will be replaced with platecoils no higher than two feet from the bottom of the tank.
6. The proposed spool at the top of the molecular sieve will
not be necessary.
.
/ tm
Kenneth E. Boucher Technical Services Department
*
DSW 294965 STLCOPCB4065480