Document B84La3Ojv4E83VaYoj8M9bx3j

INTER-omCE MEMO TEfJNECG CHEMICALS, IfJC TO F ROM SUEJJEC-T G, Ic Rozand At PiscatavJay J,, T,, Sweeney At FI em,tag ton Bendix VCM Monitoring Data Analysis Flemington Plant November 8, 1975 to November 21, 1975 Dai e December 5, 1975 Copy to N. D,, Bord 1). M. Hershkowitz W. Fc Gabel P. Ac Lobo W. Miringoff F. X. Ritter M. K, Rosen Pc R Scarito F. Toca Attached is the subject analysis. JTS :ms f''3 T. Sweeney^ J COLORITE 006424 Bendi>: Monitoring Data Analysis Fletnington Plant November 8 - November 21, 1975 int ;VTO * Point Location jo- 1 (E-2 -3 Center Aisle, First Floor Remarks: Problem is believed to be the result of reactor washouts - washing frequency has been reduced by 50%. Total 975 Readings (PPM VCM) >5 15 >25 2 jE-4 -5 -6 No. 1 and 2 Slurry Tumps, First Floor Remarks: The problem is the result of the chip basket washouts. The .solution is being carefully studied, and some modi fications have been made.. E-7 -8 Recovery Compressor Room Remarks: Intermittent leaks in vacuum pump and compressor systems. Room to be po.sted as a mask area. JS-K 1 Center Aisle, Second Floor f :-ll l 12 Remarks: General ventilation problem related to reactor ventilation and reactor washout. Engineering estimate is now being prepared covering relocation of reactor ventilation. 975 648 974 -13 -14 -15 Stripper Platform., Panel board area Second Floor Remarks: Problem is believed to be result of intermittent leaks in the recovery room. More data has to be genera Led. the 975 18 3 1 Cv 6 6 / / /-'h6? - \'\/ -O 3 -16 Knock out tanks. Second Floor Remarks: No defined source as vet. -17 West Wall Between Styrene 'lank, Second Floor Remarks: problem is believed to be the result of intermittun1 leaks in Lhe re covery room. More data has to be generated. 325 32 5 19 1 15 1 T^lOO 0 0 0 1 0 1 0 COLORITE 006425 Bendix Monitoring Data Analysis Flemington Plant 'oint No* point Location lE-18 Gelatin Make-up area. Second Floor :E-19 Stairwell, Second Floor Remarks: Problem is believed to be the result of intermittent leaks in the recovery room. More data has to be generated. To tal 650 Readings (PPM VCM) >5 35 >25 L >100 0 GENERAL AREA G-2 Quality Control Lab, Nest Remarks: Inadequate ventilation Engineering re-design in work Priority 1 proje.ct. 320 70 0 VCM Pumps Remarks: Pump seal leakage'- ultimate solution is conversion to "canned" pumps. Engineering is working on the development of a suitable pump. 320 37, 1 - G-10 Tank Car Unloading' Remarks: Ilose disconnect operation Engineering is currently working on m-deslgn - priority 2 project. 320 74 r* 12 PP-2 PILOT PLANT Effluent Lift Pump Area Remarks: Not a work area-does not represei personnel exposure. 276 65 1 ?P-1 Pilot Plant: PP-3 Vi-'-4 remarks; Engineering actively engaged in PP-5 preparing an overall scope: package for a PP- 7 CAR PP-8 1,.. ?P-G Parshall Plume Uell ;emarks: Not a work area-does not repre- or.r r: o:ine 1 exposure.. 2208 276 117 18 rUs 'io 3 COLORITE 006426 1 k ,i ^! 0 1 --L------