Bendix VCM Monitoring Data Analysis Flemington Plant November 8, 1975 to November 21, 1975
Dai e December 5, 1975
Copy to
N. D,, Bord
1). M. Hershkowitz W. Fc Gabel P. Ac Lobo W. Miringoff F. X. Ritter M. K, Rosen Pc R Scarito F. Toca
Attached is the subject analysis.
JTS :ms
f''3 T. Sweeney^
J
COLORITE 006424
Bendi>: Monitoring Data Analysis
Fletnington Plant
November 8 - November 21, 1975
int ;VTO * Point Location
jo- 1 (E-2 -3
Center Aisle, First Floor
Remarks: Problem is believed to be the result of reactor washouts - washing frequency has been reduced by 50%.
Total 975
Readings (PPM VCM)
>5 15
>25 2
jE-4 -5 -6
No. 1 and 2 Slurry Tumps, First Floor
Remarks: The problem is the result of the chip basket washouts. The .solution is being carefully studied, and some modi fications have been made..
E-7 -8
Recovery Compressor Room
Remarks: Intermittent leaks in vacuum pump and compressor systems. Room to be po.sted as a mask area.
JS-K 1 Center Aisle, Second Floor f
:-ll
l
12 Remarks: General ventilation problem
related to reactor ventilation and
reactor washout. Engineering estimate
is now being prepared covering relocation
of reactor ventilation.
975 648 974
-13 -14 -15
Stripper Platform., Panel board area Second Floor
Remarks: Problem is believed to be result of intermittent leaks in the recovery room. More data has to be genera Led.
the
975
18 3
1
Cv
6
6
/
/
/-'h6?
- \'\/
-O
3
-16 Knock out tanks. Second Floor
Remarks: No defined source as vet.
-17 West Wall Between Styrene 'lank, Second Floor
Remarks: problem is believed to be the
result of intermittun1 leaks in Lhe re covery room. More data has to be generated.
325 32 5
19 1 15 1
T^lOO 0 0 0 1
0
1 0
COLORITE 006425
Bendix Monitoring Data Analysis
Flemington Plant
'oint No*
point Location
lE-18 Gelatin Make-up area. Second Floor :E-19 Stairwell, Second Floor
Remarks: Problem is believed to be the result of intermittent leaks in the recovery room. More data has to be generated.
To tal 650
Readings (PPM VCM)
>5 35
>25 L
>100 0
GENERAL AREA
G-2 Quality Control Lab, Nest
Remarks: Inadequate ventilation Engineering re-design in work Priority 1 proje.ct.
320
70
0
VCM Pumps
Remarks: Pump seal leakage'- ultimate solution is conversion to "canned" pumps. Engineering is working on the development of a suitable pump.
320
37, 1
-
G-10
Tank Car Unloading'
Remarks: Ilose disconnect operation Engineering is currently working on m-deslgn - priority 2 project.
320
74 r*
12
PP-2
PILOT PLANT Effluent Lift Pump Area
Remarks: Not a work area-does not represei personnel exposure.
276
65 1
?P-1 Pilot Plant: PP-3 Vi-'-4 remarks; Engineering actively engaged in PP-5 preparing an overall scope: package for a PP- 7 CAR PP-8
1,..
?P-G
Parshall Plume Uell ;emarks: Not a work area-does not repre-
or.r r: o:ine 1 exposure..
2208 276
117
18
rUs
'io 3
COLORITE 006426
1
k ,i
^!
0 1
--L------