Document B82qX0w0xNDRjBmxLDr3Q3de4
Interoffice Communication
To : Vinyl Shift Supervisors Fom : J. E. Barton Date : March 20, 1979 Subject : EPA COMPLIANCE
(conoco)
/
The following items need to be done to assure-EPA compliance reguarding VCM emissions.
1. The date must be stamped on the Honeywell recorder charts each morning at 7:00 a.m. When the Honeywell charts are replaced the number of the Honeywell unit is to be written on the bottom of the chart. All used charts are to be turned into me.
2. All recovered VCM receivers are not to be filled above 8Q?.
3. The high pressure alarms on the blowdown tank in each unit will be xeset to 40 psig.
4. The Emergency Kill Procedure has been revised as follows:
Emergency Shutdown
The following parameters are to be the maximum limits on a runaway reaction. The reaction should be killed with AMS if either one of the parameters is exceeded.
Resin
Maximum Temperature
Maximum Pressure
5385, 5425, 5465
142F
145 PSIG
5305
162F
175 PSIG
. A runaway reaction immediately after charge and heat-up indicates that the reactor condenser may be plugged, and that the reaction must be killed.
If AMS will not kill the reaction, use the nitric oxide (N.O,) short stop system. CAUTION: N.O. is a highly poisonous orange-colored gas. A Scott Air Pack, or a "Rocket Fuel" cannister mask must be worn while killing a reactor with the N.O. short stop system.
The runaway reaction must be killed immediately if either one of the pressure or temperature limits listed above are exceeded. If the reaction is allowed to exceed these limits, it may not be controllable and result in a relief valve or rupture disc discharge to the atmosphere.
DTH 000070147
EPA Compliance March 20, 1979 Page 2 ^5. The emergency nitric oxide kill system for all the reactors has been
pressure checked to assure integrity of the systems. These systems will be pressure checked each six months with nitrogen, 6. After every coarse batch produced the reactor condenser will be inspected to determine if it is plugged. If the condenser is found to be plugged, it will be cleaned prior to charging the next batch. 7. Copies of the procedures for the Old Unit, New Unit, and Dryers will be placed on the table between the Lead Operators* desks in the control room. There will also be copies in the Shift Supervisor's office and Operations Supervisor's office for your reference. Please conduct a formal review with your people on the seven items above and the attached Work Practice Controls for the OSHA VCM Standard. Write the review meeting up on the safety meeting form and return it to me. I would like to have all the meetings completed by 4/8/79.
cjt c: CLM, ELK, RAF, Shift Supervisors (5)
DTH 000070148