Dallas, April [\ , 1991
District Manager-Building Operations & Maintenance - Houston (Bill Nicks) District Manager-Architecture - San Antonio: (Herb Looney) Area Manager-Construction Management - Houston: (Peter M. Mistrot) Area Manager-Architecture - Houston: (Jim White) --tee* Manager-Architecture - San Antonio: (Pete Campos) Area Manager-Network Engineering - Dallas: (Mel West) Area Manager-Network Operations Staff TM Dallas: (Perry G. Lambert) Manager-Architecture - Dallas: (David Keeling) Manager-Architecture - Dallas: (Yadira Lopez) Manager-Architecture - Dallas: (Kathy Schneider) Manager-Buildings - El Paso: (Bettye G. Marable) Manager-Buildings - Ft. Worth: (Ralph McCloud) Manager-Buildings - Dallas: (Marion Solomon) Manager-Building Engineering - Houston: (Charles E. Broussard) Manager-Safety-Network Operations - Dallas: (Larry Peterson) Manager-Architecture - Dallas: (Mike Oliver) Manager-Buildings - Houston: (Ronald H. Brandenberg) Manager-Buildings - Dallas: (J.J. Garza) Manager-BOCC-Technical Support - Dallas: (Becky Brigham) Manager-Removal Operations - Dallas: (Mike Miller) Manager-Safety - Dallas: (Joey Grubbs) Senior Reports Clerk - Dallas: (Susan Papesh)
The next North Texas Building Asbestos Committee meeting will be on Thursday, Mav 16, L99L, at 9:30 a.m., One Bell Plaza, Room 1308, -piXlas, Texas. The meeting will adjourn"~at' 2:30 p.m. Please" schedule your plane reservations appropriately.
Committee members in Houston will be able to join us via teleconferencing facilities located on the 6th floor of 5252 Holister. This is being done to help control expenses during our current economic environment.
Attached are April meeting:
* Member list * Prior meeting attendee list * Individual Action Items * Subcommittee Assignments/Results * Resolutions * Future Topics * Subcommittee Hand Outs
0 'j S 3 9 3
BUILDING ASBESTOS COMMITTEE MEETING COVER LETTER APRIL 4, 1991 PAGE 2 Should you have any questions, please contact me on 214-464-2228.
.vut u nw c* jr
Area Manager-Bldgs. Operations Staff Operations and Maintenance Attachments cc: G.W: Fox
Roberta Ballantyne Bob Jackson
0uS394
BUILDING ASBESTOS COMMITTEE North Texas Area
Correspondence Identification: j-60.0902 - Asbestos-Procedures Building Management Programs Revised: 3/8/91
District Manager-Bldg. Opers. & Mtce. - Houston (Bill Nicks)
3100 Main/r607 (77002)
713-521-6138
District Manager-Architecture - San Antonio: (Herb Looney)
4119 Broadwav/rG60E
512-841-0788
Area Manager-Buildings - Dallas: (Tobev D. Nealy)
I Beil/rPCIO
214-464-2228
Area Manager-Environmental Regulation - Houston: (Peter M. Mistroc)
3100 Main/r6Q9 (77002)
713-521-8976
Area Manager-Architecture - Houston: (Jim White)
3100 Main/r609 (77002)
713-521-7203
Atua Manager-Architecture - San Antonio: (Pete Campos)
4119 Broadway/rG60J
512-841-0797
Area Manager-Network Engineering - Dallas: (Mel West)
I Bell/ri640.08
214-464-5919
Area Manager-Network Operations Staff - Dallas: (Perry G. Lambert)
I Bell/r3225
214-464-8361
Manager-Architecture - Dallas: (David Keeling)
III Bell/r804
214/464-3834
Manager-Architecture - Dallas: (Yadira Lopez)
III Bell/r804
214/464-4762
Manager-Architecture - Dallas: (Kathy Schneider)
III Bell/r804
214/464-6075
Manager-Architecture - Dallas: (Mike Oliver)
III Bell/r804
214-464-4074
Manager-Buildings - Houston: (Ronnie H. Brandenberg)
1310 Richmond/rB23 (77002) 713-520-0698 Manager-Buildings - Dallas: (J. J. Garza)
III Bell/rSB-2A
214/464-4879
Manager-Buildings - El Paso: (Bettve G. Marable)
510 Texas/r115 (79901)
915-542-4670
Manager-Buildings - Ft. Worth: (Ralph McCloud)
L116 Houston/r800 (76118)
817-338-6083
Manager-Buildings - Dallas: (Marion Solomon)
I Bell Plaza/rPBlO
214-464-3400
Manager-BOCC-Technical Support - Dallas: (Becky Brigham)
III Bell/r904
" 214-464-3872
Manager-Building Engineering - Houston: (Charles E. Broussard)
3100 Main/r609 (77002)
713-521-8524
Manager-Safety - Dallas: (Joey Grubbs)
I Be 11/r9lo'
'214-464-8652
Manager-Safety Network Operations - Dallas: (Larry M. Peterson)
I Bell/r3240
214-464-8755
Manager-Removal Operations -
Dallas: (MikeMiller)
I Be.ll/rl903
214-464-6693
Senior Reports Clerk - Dallas: (Susan Papesh)
3 Beii/r804
214-464-66*0
0uS39
BUILDING ASBESTOS COMMITTEE MEETING ATTENDANCE APRIL 4, 1991 IN ATTENDANCE: District Manager-Building Operations & Maintenance - Houston: (Bill Nicks) Area Manager-Buildings - Dallas: (Tobey D. Nealy) Area Manager- Network Engineering - Dallas: (Mel West) Area Manager-Environmental Regulation - Houston: (Peter M. Mistrot) Manager-Architecture - Dallas: (Mike Oliver) Manager-Architecture - Dallas: (Yadira Lopez) Manager-Architecture - Dallas: (Kathy Schneider) Manager-Buildings - El Paso: (Bettye G. Marable) Manager-Buildings - Ft. Worth: (Ralph McCloud) Manager-Buildings - Houston: (Ronald H. Brandenberg) Manager-Building Engineering - Houston: (Charles E. Broussard) Manager-Removal Operations - Dallas: (Mike Miller) Senior Reports Clerk - Dallas: (Susan Papesh)
ABSENT: . District Manager-Architecture - San Antonio: (Herb Looney) Area Manager-Architecture - Houston: (Jim White)
Manager-Architecture - San Antonio: (Pete Campos) Area Manager-Network Operations Staff - Dallas: (Perry G. Lambert) Manager-Architecture - Dallas: (David Keeling) Manager-Buildings - Dallas: (J.J. Garza) Manager-Buildings - Dallas: (Marion Solomon) Manager-BQCC-Technical Support - Dallas: (Becky Brigham) Manager-Safety - Dallas: (Joey Grubbs) Manager-Safety-Network Operations - Dallas: (Larry Peterson)
0'jS39o
INDIVIDUAL ACTION ITEMS APRIL 4, 1991 i. Yadira Lopez is to have copies of the Administrative
Procedures printed and sent to each district for distribution. She will also cover the procedures with the Dallas Architects in a group meeting.
0'j3397
Sub-Committees Established on 7/12/90
1. "CAD" - COMPLETE -
Charles Broussard David Keeling
Pete Campos Mike Oliver (Reported)
GOALS:
1) Standardize symbols for State - COMPLETE
2) Develop CAD layering standards - COMPLETE
3) Network frame planners to receive copies?
Mel to see if they want copies.
Jl-
Cvm
fyln far VI
RESULTS
1) Symbols and layers are standardized. 2) Database will be incorporated into CAD.
2. "Small Glove Bag and Abatement Projects" (Especially outlying areas) - COMPLETE -
J. J. Garza Bettye Marable Kathy Schneider (Reported) Ralph McCloud
GOALS:
1) Plan procedure for handling. 2) Centralization of records -
Exhibits, etc.
PR to review. Exhibit 18 is to be used to on local area for glove bags. Exhibit 18 is to be sent to tenants on major jobs.
RESULTS:
It was determined that the Architects would handle the majority of the glove bag operations. Building Operations will handle only those emergency situations requiring immediate action. In tho~se cases the 'Building Manager will need to forward the appropriate paperwork to the Centralized Record Center immediately upon completion of the project.
G'j5393
Drilling of VAT can be performed by Network:
^providing that an Exhibit 24 is completed and
approved prior to beginning the work;
*the work is done in accordance to the Practice
and laws;
*that a qualified contractor is utilized to do the
work;
*and that all paperwork is completed and forwarded
to the Centralized Record Center immediately upon
completion of the work.
*See "Foam" drilling procedures. - Now an accepted
practice
"'
us?ec-
"Asbestos Action Items" - COMPLETE
J. J. Garza Mike Oliver Kathv Schneider
Bettye Marable Larrv Peterson
RESULTS:
1) Plan developed
2) The committee determined that there should be
three action levels: significant damage, damage, no
damage -
A&M- I
^
3) Kathy is revising the decision tree to reflect 3
Levels -
"Database Establishment and Centralized Bookkeeping"
Susan Papesh Mike Oliver Pete Campos
Dennis Virzi David Keeling (Reported) Charles Broussard
GOALS:
1. Coordinate with Network mechanization for download tovTXESS. after program is developed by Dennis. Mike checking by May I6th meeting . Mot
possible with present computer set up. 2. Electronic transfer/retrieval of information will
be investigated, after program is developed by Dennis. Due by May I6th meeting. 3. Possibility of networking to be investigated, after program is developed. Due by May 16th meeting.
RESULTS: I. A PC based data base is to be used.
G'jS399
2.
3. 4. 5.
6.
** 7.
Downloading certain data to TNESS will be performed ??? Updated input form All costs are to be loaded costs. Inputting data into database after program developed by Dennis is in progress. Database will be in DBASE IV incorporated into AUTOCAD. Charles, Susan and David are to consolidate "form data" and the survey. Report data into one database with multiple reports.. - Done
5. "Management Plan Development"
Yadira Lopez Kathy Schneider (Reported) Ronnie Brandenberg
Charles Broussard Marion Solomon
GOALS:
1) Prepare a management plan for a small C.O. by 2) Establish a time frame by whicETaTl surveyed
buildings are to have plans developed by May 16th meeting
RESULTS:
1) Management Plan Teams will consist of the Building Manager, an Architect or Engineer, and a Planner.
2) The Management Plans will consist of:
MASTER BOOK (GENERIC):
*0 & M Procedures; ^Administrative Procedures; - update *Awareness training records for SWBT employees; *Asbestos Practice;
REMAINDER IN BUILDING SPECIFIC FILES/BINDERS AT MANAGERS OFFICE
^Survey; *Schedule for removal, enclosure, encapsulation, or 0 & M of asbestos areas; ^Letter of notification to tenants (copy); *Air Monitoring Results; *Follow-up survey reports; *Contact list. *? ? ?**
** Both the Master Binder and Individual Building Binders will be kept in the Building Manager's Office.
OuSiGO
6. "Standardized Asbestos Contract" ** Next meeting - COMPLETE
Yadira Lopez (Reported) Jim White Larry Peterson
GOALS:
1) Utilize a standard A1A contract with one page insurance requirements from Risk Management""
2) Reference NIBS (National Institute of Building Sciences) contract
RESULTS:
1. GHQ is preparing a "Shell Document" contract to be used on Asbestos projects.
Committee to follow-up with Legal and GHQ for a scheduled completion date for contract.
Maxim Engineering has reviewed the contract and made comment. These comments are to be discussed with legal and the final contract brought to the 1/17/90 committee meeting.
1-16-91 UPDATE: Currently the AIA contract is the best tool available. More on May 16.
.3 Dallas and Houston uses AIA with additional
insurance requirements for asbestos.
s/v sWr
"Training" Subcommittee
Kathy Schneider Mel West Pete Campos Charles Broussard
Perry Lambert Ronnie Brandenberg Mike Miller
GOALS:
1. Develop and deliver training across Texas for the Asbestos Practice/O&M procedures. (90 day time frame?) - May I6th rough draft of class
2. Modules* for needs of different departments. Covers: 1 - 904 Practice 2-0&M 3 - Management Plant
3. , Present final product to committee. - May or June 4. Determine locations and dates for training.
1. Dallas Houston
/ San Antonio </ Austin y Midland J Lubbock El Paso
Approx. 500-525 persons to be trained from various depart ments. One full day of training at each location 25/class Approx. 32 classes
- Concentrated training - O&M by Trainers - Maneck teaches Trainers
2. Possibility of video taping or teleconferencing to reduce training. (Possibly consultation O&M Procedures on tape.)
3. Flow diagram has been developed for class.
4. Presentation of pilot in 60 days.
0 u 3 40 4
RESOLUTIONS - STATE OF TEXAS
J TV
1 C W/ JV0/TWP , Rs)Six (6) copies of Asbestos survey are to be prepared:
9 for BOM - kr#* Rtf?-
for Arch -
(<5A ) ih** / W-Tx- )
1 for Network Ope7r-a----t-i--o----n--s - 8
#A7Mto1 f-
5!/afwWin//p^wiuK/rOvwf*?ir.. (UftfelWh), gI
fell
m
1 for Safety - M^r - S3W//feY&#nh*Jl CLl<S>foi>i$)^1 <.11^10, [>S-
L for District Asbestos Library - PG/{s'/a-'
1 for ATT (condo buildings only) - Sup'tf -
UW*&9/ '425 <9aMF<^(
j<c
INSURANCE
*****
A) All policies must be approved by Julie Dople. B) Certificates are required on each job and are approved by the
Project Manager.
All managers are to keep track of all asbestos related expenditures.
(Page 33) All buildings where asbestos has been identified requires a notice as employees enter the building that asbestos is present.
Network Engineering is to .receive list of surveyed building from
the Architects. (_/$&
-firt*
Jt/lf is")
6. Architects are to supply a list of surveyed buildings to Safety for six (6) month air monitoring. Safety is to forward air monitoring
results to the Architects.
7., All AIA contracts with Scope of Work need not go through Legal. Only if they are modified.
8. It was determined that the/jArchitects would handle IHEa~g"love bag operations. Building Operations~wiH~Handle only those emergency situations requiring immediate action. In those cases the Building Manager will need to forward the appropriate paperwork to the Centralized Record Center immediately upon completion of the project.
Drilling of VAT can be performed by Network:
Ail
*providing that an Exhibit 24 is completed and approved prior to
beginning the work;
*the work is done in accordance to the Practice and laws;
*that a qualified contractor's utilized to do the work;
*and that all paperwork is completed and forwarded to the
Centralized Record Center immediately upon completion of the
work.
^ VftHv-y ACM/
n
rrvjg&Y
,
* <?tm bm [It
1
pmiwp (sotn/
0
Ail
A/Uv*-
D. 0u3403
.s
*See procedure for using "foam" method. (Ref. Letter from Div. Mgr.-Switching and Div. Mgr. - Switching Engr. dated December 28, 1990. File Subject 219.02, 220.0 and 290.4520.) Building asbestos surveys should include testing of standbygenerator exhaust insulation.
0'j3404
FUTURE TOPICS Developing a schedule for Management Plan Preparation. Asbestos labeling.