Document B5wBzYR2x7wOpQE8vO4dad1zk
DRAFT STANDARD MAINTENANCE PROCEDURE
NO.: PAGE: EFFECTIVE: REVIEWED/REVISED:
D-l 2 1 of 5 05/04/85 10/14/86
UNION CARBIDE CORPORATION Solvents and Coatings Materials Division
Texas City. Texas
SUBJECT: REMOVAL AND HANDLING OF AS8ESTOS CONTAINING MATERIAL
1.0 PURPOSE
1.1 To protect the health and safety of employees directly Involved and others who may be exposed to dust/fibers In the immediate area of asbestos-containing material removal or demolition.
1.2 To provide a standard method of safe removal and handling of asbestos-containing material in compliance with Plant Procedure I-B-8 and OSHA Standards.
1.3 To provide a standard method of disposal of asbestos-containing material from the plant. In accordance with E.P. Department guidelines.
2.0 SAFETY
2.1 Breathing asbestos dust may cause cancer and lung disease.
3.0 EXPOSURE LIMITS
3.1 Employee 8-hour time-weighted average (TWA 8) exposure to airborne concentrations of asbestos fibers shall not exceed (0.2) fibers, per cubic centimeter of air.
4.0 PROCEDURE
4.1 A Hazardous Work Permit will be secured for any work with asbestos.
4.2 Where feasible, a negative pressure enclosure will be established before asbestos removal begins.
4.3 Caution signs will be posted at all approaches to areas where removal, demolition or handling of asbestos-contalntng material Is being performed.
UCC 006371
STANDARD MAINTENANCE PROCEDURE
NO.: PAGE: EFFECTIVE: REVIEWED/REVISED:
D-02 2 of 5 05/04/85 10/14/86
UNION CARBIDE CORPORATION Solvents and Coatings Materials Division
Texas City, Texas
SUBJECT: REMOVAL AND HANDLING OF ASBESTOS CONTAINING MATERIAL
4.3.1
The signs will conform to 20" x 14" vertical format.
R
4.3.2
The signs will state:
DANGER ASBESTOS CANCER AND LUNG DISEASE HAZARD AUTHORIZED PERSONNEL ONLY RESPIRATORS AND PROTECTIVE CLOTHING ARE REQUIRED IN THIS AREA
4.4 An appropriate barricade, using green tape, will be erected around the perimeter of regulated areas as a supplementary, protective measure to discourage unauthorized entry.
4.5 Insofar as practicable, demolition, removal or handling of asbestos-containing material will be performed while the material Is in a sufficiently wet state to prevent emission of airborne fibers exceeding the exposure limits.
4.6 Removed Insulation will be wetted and placed directly into labeled plastic bags or other suitable containers.
4.7 In cases where this is not practicable, place plastic sheeting beneath the job site, mist spray the removed Insulation with water, then place in plastic bags.
4.8 Vacuuming will serve as an effective alternate cleanup method.
4.9 Where a portable change facility is provided, entry to and from the regulated area must be through the change facility.
UCC 006372
STANDARD MAINTENANCE PROCEDURE
NO. : PAGE: EFFECTIVE: REVIEWED/REVISED:
D-12 3 of 5 05/04/85 10/14/86
UNION CARBIDE CORPORATION Solvents and Coatings Materials Division
Texas City. Texas
SUBJECT: REMOVAL AND HANDLING OF ASBESTOS CONTAINING MATERIAL
R 4.10 Containers used for disposing of removed asbestos material will bear a caution label readily visible and legible which states:
DANGER CONTAINS ASBESTOS FIBERS
AVOID CREATING DUST CANCER AND LUNG DISEASE HAZARD
4.11
All external surfaces will be maintained free of accumulation of asbestos fibers. Scaffolds used for this work will be cleaned.
4.12
Asbestos waste, scrap, debris, bags, containers, equipment and contaminated disposable clothing for disposal will be collected and sealed In impermeable bags or other closed Impermeable containers and placed in place in an area to where damage to the containers would be at minimal.
4.13
All pipe or equipment Insulated with asbestos containing will be stripped before taking to Salvage or Investment Recovery.
5.0 PERSONAL PROTECTIVE EQUIPMENT
R 5.1 Respiratory Protection - Employees engaged in the spraying <wetting-down) of asbestos, the removal; in the demolition of pipes, structures, or equipment covered or insulated with asbestos; and in the removal or demolition of asbestos insulation or coverings shall be provided with respiratory equipment as follows:
UCC 006373
STANDARD MAINTENANCE PROCEDURE
NO.: PAGE: EFFECTIVE: REVIEWED/REVISED:
D-l 2 4 of 5 05/04/85 10/14/86
UNION CARBIDE CORPORATION Solvents and Coatings Materials Division
Texas City. Texas
SUBJECT: REMOVAL AND HANDLING OF ASBESTOS CONTAINING MATERIAL
5.1.1
An air purifying respirator may be used to reduce exposure below permissible limits, when the celling or the 8-hour time-weighted average (TWA 8), airborne concentrations of asbestos fibers are reasonably expected to exceed no more than ten times the PEL limits. This consists of a half face dual cart. Respirator with type "H" filter.
5.1.2
An air powered purifying respirator will be available at employee's request.
5.1.3
A pressure-demand, supplled-air respirator shall be used to reduce exposure below permissible limits when the ceiling or the 8-hour time-weighted average airborne concentrations are reasonably expected to exceed 10 times those limits.
SDeclal Clothinq - The supervisor shall provide and require use of special clothing, such as coveralls or similar whole body clothing, head coverings, gloves, and foot coverings for any employee exposed. Contaminated clothing should not be stored in lockers. A daily change Is mandatory, more frequently, if conditions warrant.
Hyqiene Facilities and Practices-
5.3.1 5.3.2 5.3.3
A portable clean change facility will be provided as necessary, adjacent to and connected to the regulated areas.
For the purpose of small, short term operations, an HEPA vacuum or glove bag may be used.
A permanent change area Is provided for employees use as a follow-up for small short term operations as necessary.
UCC 006374
STANDARD MAINTENANCE PROCEDURE
NO.: PAGE: EFFECTIVE: REVIEWED/REVISED:
D-12 5 of 5 05/04/85 10/14/86
UNION CARBIDE CORPORATION Solvents and Coatings Materials Division
Texas City. Texas
SUBJECT: REMOVAL AND HANDLING OF ASBESTOS CONTAINING MATERIAL
R 6.0 TRAINING
6.1 All employees entering a regulated area will be trained prior to and annually thereafter on:
6.1.1 Methods of recognizing asbestos.
6.1.2 The health effects associated with asbestos exposure,
6.1.3 The relationship between smoking and asbestos in producing lung cancer.
6.1.4
Operations that could result in exposure in asbestos, the importance of necessary protective controls to minimize exposure including, as applicable, engineering controls, work practices, respirators, housekeeping procedures, hygiene facilities, protective clothing, decontamination procedures, emergency procedures, and waste disposal procedures, and any necessary instruction in the use of these controls and procedures:
6.1.5 The purpose, proper use, fitting instructions, and limitations of respirators.
6.1.6 The appropriate work practices for performing the asbestos job.
6.1.7 Medical surveillance program requirements.
6.1.8 A review of this standard, Including appendices.
6.2 All other Maintenance employees will be trained every three years.
6.3 Training records will be maintained by the Maintenance Department with a copy to the Safety Department.
ID#0084y/1vh
UCC 006375
UNION CARBIDE CORPORATION TEXAS CITY PLANT PLANT PROCEDURE
NO: PAGE: DATE:
I-B-8 2 of 3 12/15/86
SUBJECT:
HANDLING ASBESTOS MATERIALS
A. PROCEDURE (Continued)
(R) 9. Disposal containers must be labeled as follows and disposed of under the direction of the Environmental Protection Operations group leader at Building 249.
DANGER CONTAINS ASBESTOS FIBERS
AVOID CREATING DUST CANCER AND LUNG DISEASE HAZARD
(A) 10. Where feasible. Installed asbestos shall be visibly labeled In the same manner as disposal containers In Section A.9.
B. RESPONSIBILITIES
1. The Owning Department must:
a. Prepare notifications to the H&EA department of both planned and emergency activities involving asbestos containing materials.
b. Identify materials containing asbestos prior to Initiation of work (asbestest or dispersion staining microscopy required to eliminate insulation from being considered as asbestos).
2. The Health Safety and Environmental Affairs Department must:
a. Monitor plant compliance with EPA and OSHA regulations.
b. Provide notification to EPA and TACB for those activities for which notification is required.
c. Provide asbestos Identification test methods and required training.
3. The Medical Department must provide annual physical examinations to employees with potential exposure to asbestos.
C. DEFINITIONS
Asbestos - Any material containing more than IX asbestos fiber (insulation, excluding foam glass and fiberglass, will be presumed to be asbestos until verified by lab test not to be).
Regulated Area - Any area within an "asbestos" barricade where demolition activities are In progress.
0. CRITERIA AND EXCLUSIONS
This procedure Is based on regulations and policies including Safety and Health Technology Manual SH 256, 40CFR. Part 61.140, 29CFR. Part 1910.1000.
#0184s
UCC 006376
UNION CARBIDE CORPORATION TEXAS CITY PLANT PLANT PROCEDURE
NO: PAGE: DATE:
I-B-8 1 of 3 12/15/86
SUBJECT:
HANDLING ASBESTOS MATERIALS
POLICY
Repair or demolition of material containing asbestos must be performed In a manner that controls potential employee exposure and contains the material for disposal.
A. PROCEDURE
1. Planned repair or demolition activities where asbestos may be Involved must be reported to the Health & Environmental. Affairs Department by use of the attached form, one month before the work Is planned to start.
2. Unscheduled emergency activities Involving asbestos must be reported as soon as possible.
3. Notification to the Environmental Protection Agency and Texas Air Control Board will be provided by the H&EA department when required under the regulations.
4. Asbestos removal will beperformed only with the material
adequately
wetted until It Is collected and bagged for disposal. Personnel must wear
respirators, disposable coveralls, head and foot coverings, and gloves.
See Maintenance Procedure D.ll for detailed procedures.
5. Asbestos material will not be dropped from elevations during handling activities but instead will be either lowered In sections for removal at grade level or transported to grade In dust tight chutes.
6. AJN asbestos must be picked up at the end of each work day and equipment with exposed asbestos covered to prevent release of fibers.
(R) 7.
Areas where there Is a potential for employee exposure to asbestos will be barricaded and posted with signs like this:
DANGER ASBESTOS CANCER AND LUNG DISEASE HAZARD AUTHORIZED PERSONNEL ONLY RESPIRATORS AND PROTECTIVE CLOTHING ARE REQUIRED IN THIS AREA
8. All employees Involved In handling asbestos, or entering regulated areas, must be trained annually and must follow work practices outlined In Maintenance Procedure D.ll.
UCC 006377
Plant Procedure 1-8-8 Attachment #1
UNION CARBIDE CORPORATION TEXAS CITY PLANT
NOTICE OF INTENTION TO DEMOLISH OR RENOVATE A STRUCTURE OR FACILITY CONTAINING ASBESTOS MATERIAL
1. Description of the facility:
2. Estimate of approximate amount of friable asbestos materials present: (Area in sq. ft. or linear ft.) _____________________________________________ Estimation technique used:'___________________________________________________
3. Location of facility: 4. Scheduled starting day: _______________________________________________________
Scheduled completion day: ____________________________________________________ 5. Nature of planned demolition or renovation: ______________________________
Method to be used: 6. Name of person that prepared the form:
Location and telephone number: Date:
NOTE:
This form must be completed and delivered to the EP Department (Bldg. #1) at least 30 days ahead of the scheduled starting day of the planned demolition or renovation, or as soon as possible following an emergency renovation operation.
April/1985 ID#0184s/jah
UCC 006378