NEWARK PLANT PIGMENT COLOR RESEARCH REPORT
Final Report
NEWPORT PUNT ASSISTANCE - CPC
Jjmm, 1 - DECEMBER 31, 1952
period Covered
FILE. DATE,
5/20/54
rt
d
tiJ 4497
DUP050069719
Copsr tot
#1 - Numerical File 2 * Research File (223*4) 3 - library File (223*4) 4 - V* H* Chalupeki, Newport 5 - B. F* ELenke, Newport 6 - J* S* Tolly/A. Siegel, Newark 7 - J* H. Cooper* Newark S * #14 Bldg, file* 9 *> M, A* Perkins, Jaokson lob*, Orofasi
10 - W* jr. Clen, Chambers Works, Orehew 11 * Extra 12 - Extra
Serial SO* Co mr No*
KK-54-9 /
NEWARK PLANT C8SKIGAL OIVZSKEM3CLORS
Final Report
TITLEt NEWPORT PLANT ASSISTANCE - CPC PERIOD COVERED! JANUAHT, 1 - DECEMBER 31, 19$2 CHARGE* BCK-33
DUP050069720
5|f
pv * 5a >
<
1
This report is a continuation of KH-52-9, and covers asaiatanoo work for tbs period danuary to Decsober, 1952. expansion of tbs CPC plant (project 9199) wee ooBpleled.
A neir product "Honaatral" Blue ERF was added* using a modification of the Blue LB process in the same equipment. this product was developed to west the demand for a flocoulation resistant CPC Bine* and was released as a lake ooded BP-366-D.
A number of process changes were introduced during this period, in
the interest of bettor quality and/or lower operating costa. Paste
(ess
Appendix II), which significantly increased the plant milling capacity, the wee
of EF* type crude for chlorination and BO Milling* and simplification of bine
and green finishing processes (elimination of was extraction each) were the major
contributions to dm coat redaction prograau Quality improvements were gained '
by better operating control end by the process changes indicated later In this
report.
A. A--CPA
Daring the period 2/7/52 to 4/15/52 the 4-CPA (A-chlorphthalio acid) batch else was changed several tinea in an effort to reduce the chlorine content of 13 crude from a k*f>% average to the goal of 4.1$. ftr weighing and each hatch of 4-CPA, and correlating these data with blue crude analysis, it Was established that 40 lbs. of organic chlorine per batch of 4-CPA would prodose LB ofadc of the desired chlorine content. On 4A5/52, this process (1-C) became ctandard and remained unchanged until the LB batch else was increased, fibre detailed information can be found in the plant standard job procedures 1A, IB and 10.
Starting 2/1/52, tbs use of dry instead of molten urea was adopted to eliminate the possibility of yield and/or quality loss due to decomposition of the urea during the Waiting process.
In April the amount of copper chloride used per synthesis was increased to 1Q5 of theory as insurance against yield loss. At the asms time, 10 lbs. of 5C HaOH was added to 12 consecutive hatches mi a trial basis la an effort to improve yield. The results of the HaOH trial were inconclusive.
DUP050069721
In June the quantity of phthalie anhydride used par synthesis was increased from 84? lbs. to 856 Iba., the area increased from 1500 lbs* to 1600 Xbi** the ammonium molybdate increased from 2.5 to 5 lbs., and the load (anti oxidant} increased from 3 to 6 lbs* - all to improve synthesis yield* At the same tine, the sequence of rev material additions to the synthesis battle was changed (see SJP-2C), ao that area mm added after the Hater in the 4-CPA vaa boiled off* bat before the other eheadoale were introduced* This change uaa nade because the occurrence of four "guped* syntheses during April and Kay
mm attributed to oxidised kerosene* and ittRM poatulated that the early addi
tion of urea ueuid lower the temperature of the kerosene* while the later addi tion of the OuClj would reduce the possibilities of oxidation.
In Sovsmber a series of syntheses was nade using 3-1/2 hours instead of the standard 4 hours hold tine at teiuperature (195* 5*C). Sana yield loss oocurred end was associated with the shorter holding tide; therefore* the change waa discontinued. It mm agreed at this tine to try adding 27 lbe. of flake caustic to each synthesis for one month to determine df the yield improvement reported by the Semi-work* could bo realised* there was a 3% yield increase attributed to the use of eaustlo} however, the simultaneous occurrence of eons redness and dullness in H-623 led to the temporary discontinuance of the use of caustic* the addition of caustic in the synthesis mm restmed in January, 1953* at which time no quality degradation was observed.
c* gyifftt^op
Starting in February* 1952* a campaign of 20 batches was nade using 1} an increased quantity of ioe (5000# vs 300017 for hydrolysis and 2) adding the ice after the kerosene decantation instead of after the two subsequent water decantations* Ibis Hcold hydrolysis0 procedure was triad as a naans for improving 18 quality, the occurrence of severe pelletization during or subsequent to hydrolysis was attributed to this process change} therefore. There was no improvement in quality associated with the trials of "bold hydrolysis0
In the interest of obtaining 18 crude of higher purity* the crude ex traction tin* was increased from 2 to 4 hours (at 95*0), the filtration temperature increased from 7D*-80*6 to 95*C, god the press washing tine increased fron 3 to 4 hours* Share was no significant improvement in purity} therefore, on 6/5/52 the filtration temperature was reduced to 75*-85"C. to increase the life of the press wood* end the extraction tine decreased to 2 hours to relieve the extraction tank bottleneck*
With the hope of Improving crude purity and/or quality* 20 lba* of Triton X-100 was added to 6 batches prior to hydrolysis} there ms no purity or quality iaproveswnt noticed*
DUP050069722
4
-3 *
Two hatches were acid hydrolysed (no oaustio added after sulfation
ad decantations) to collect plant operating and quality data. The final pH of the washed crudes was 3.0 - 3*3} therefore, 10 lbs. of trl-eodimi phosphate
was need per hall alii charge to'inhibit poseible eorroeion. Ho proeessing
difficulties Were encountered, end the solvent allied products were equal to
current products. This work was undertaken as part of a cost reduotion program the goal being roughly |1.5/cwt. savings due to osdssion of KaOH. The equip* went aodifioations needed to panalt adoption of this process (sold slurry at high temperature) oould not be justified by the savings involved} therefore, no further work wae done.
The praotioe of drying unwashed crude (after hydrolysis} was dis continued in June, 1952, after several fires in the crude driers were attributed to this procedure.
0. folvaftk^Ufig
hy January, 1952, X, L, ind M mills were put into service. These were the last of the new mills installed aa part of the 9199 project. The initial performance of J, X, L, and M wae unsatisfactory} weak (106)100) dull material waa product! repeatedly, even at reduced milling rates (314#/21 hours vs. 3&2#/21 hours). The use of improperly oleaned shot and/or mills was sus pected, and a cleaning program waa started. Several millings of blanc fixs/ acetone and s</acetone were tried without suooees. In addition to being in effective ec a shot and/or mill cleaner, the blanc fixe residue in the mill wae diffioult to femove. Washing the shot with "Duclene" (inhibited HC1) waa alao unsucoeasful. ^The final approach waa to mill a tri-sodium phosphate/water solution and discharge the balls on to an inclined screen which in turn dis charged into drums of TSP/water solution. As the idiot traveled downlibe in clined screen, they ware washed with a water spray. One such operation was found to bo adequate, and after a few chargee of blue erode were milled, the mills were oonli4ered aooeptsble
In ianuary, the problem of 19 weakness (105)100) at the standard milling conditions (362 lbs. crude end 21 hr* milling cycle) wae referred to the Chemical Division* The first approach wae to return to the old standard milling conditions of 314 ltoa. loading and 21 hr. oyolo. however, at theae oonditions the quality averaged 106)100} therefore, the milling cycle was increased to 30 fare, at the 314 lhe./30 hr. eandltione, the ball mill quality averaged 97)100} packed lot quality averaged 100)100.
Quality fluctuations persisted, however} therefore, in an effort to achieve hotter uniformity of mill quality, the stool shot loadings were adjusted to 24,000# (+ 4jf) per mill* This was subsequently reduced to 21,000# per mil on 4/18/52. One extra 100 gallon acetone flugb was added act the and of eaob
mill discharge, since teste showed roughly 50 of pigment remained in the mill
after the standard flushing (l dilution plus 1-100 galloa flush).
DUP050069723
4
In May, the milling conditions were ohanged from 3141/30 hour* to 362#/30 hours for increased productivity. A Tory slight strength ices was
again changed in June sad July for increased production, and 3|2#/26 hours was used aost of the tine. Average quality dropped from 97 to #*100 from Hay to July*
In July, two trials were usds of increased sill loading) seven peaked lots mars mads at 4101/36 hours, and three paoksd lota at 4301/26 hours* ths quality at 410#/36 hours averaged lOELtlOO, and at WQ#/26 hours the average was 102*100. Hires store paoksd lots in August at 430#/26 hours also averaged 102*100.
A statistical study was suds of IB milling for the period 4/15-10/1/52 sad the results summarised in a memorandum report issued 11/12/52 (Appendix )* this study indioatsd ths four mager milling variables to be milling time, plimanfc loading* mill speed, end pigaent^purity, and a formula Mae developed for the re* l&tionship of these variables to pigment strength. (See report for details.)
Due to a drop in packed lot quality at 362#/26 hours (11 lot average * 102*100, September * October), the mill loading was changed to 3621/30 hours (24 lot average * 99*100), hut returned to 362#/26 hours for extra production.
For a two week period at a mill loading of 362#/24 hours, the nUl dilution at 1 and 6 hours was omittedj all the acetone was put into the mill at the start. A strength loss of 1/2-1$ was attributed: to this change, and it was therefore discontinued*
in
>
E.
In March, alkaline extraction of milled LB was resumed in an effort to improve quality* Approximately 1-2# strength was gained} however, the s traction was discontinued in April to reduce costa. Substituted for the alkaline
extraction was a press wash with dilute ammonia, and this procedure is still in use*
Material produced in January was rcugS|M( weak, red and dull primarily
due to the use of asm mills J, K, L, K and/or rusty Shot (see LB milling). During
the same period A, B, and C adlla were producing satisfactory material} therefore,
4vkb*o4Mit pwwuoMnk vuu k * MnaiaWMaaIdiw--j #
oin*? winti mi rw i imit o mVksa iiiWsmi m,a A a w I a 1 amtsi
*11 a s B
in4 m Ai ot Wmi
piiw
(after extraction and drying), and acceptable quality use attained.
DUP050069724
5
In th# April-Hay oanpaign (13,000#) th* first 8 peeked lot* 104*100 dull; therefore, th* willing conditions Her* changed from 345" to 314#/40 houre. the balance of the oaapaign (15 lota) averaged 103*100 fti grata, ve intense. The use of dry araa in the synthesis ana atarted with this campaign, and baa been continued ever aim*.
tba 15,000 lb. Jam campaign wi Billed 3l4#/40 bra* with an average paekai lot quality of 105*100, intanaa* Also, on* peeked lot (247) wna aada from gf type eruda, adllad 3141/40 bra*) tba quality waa v groan, and dull taraat-d^7-0 (lot 373)* During thia oaapaign dilute anaemia praaa waahing waa liitltufced and ia ctill in uaa*
During tba July-August oaapaign tba uaa of a 90/00 blend of eruda waa triad a* a weans of increasing tba B0 Billing rata* It had boon daannatratad by lab* Billing that "BP" eruda davalopad atrangth aor* than "KF" oruia, and that a 90/00 blend of ttgpn/agy* erudo gave the rata of atrangth development without adversely affaoting any color propertiea. } the results of thia pint trial ware a* follow* t
at 314#/40 hrs. (209 HEFM/8Q9 D crude * 99 a groan, aa interna (1009 KPn eruda * 102 equal
at 362#/40 hr* . (209 wBFM/809 "KF" crude - 100 are rad, vs dull (1009 "KF" crude * 103 va rad, a dull
These plant data eonfiraod tba laboratory data} tba uaa of tba 20/B0 | bland of eruda gave a eigaLfioant Increase in Billing rata which, together with tba uaa of tba lower oost "BP" eruda, reduced the coat of aolvacil adllad Hu* B0*
Baaed upon thia information, the Noveeber campaign was and* using a 20/8Q bland of crude and Billing 3621/40 bra*} average quality Waa 99*100, equal* Two packed lota wade exolueively tram "BP* eruda, allied 3451/45 hr*., ware rated 94*100, green and dull*
Bee Appendix ill for tabulation of Blue BO quality data*
The firat aynthaaia of Blue BHF (lot 431) waa aada in Kay, 1959, and no unusual operating problem ware encountered.
She eruda waa allied 30 houra with a 362f pigment loading wad shipped to Bewark aa peeked let B-623 (3), lot 568* By rubout, rexaus H6S9 atandard, thin lot waa 101*100 araen* intanaa*
DUP050069725
6
The second Blue BHF campaign wae ante In Julju Five syntheses were made and finished in 12 mill charges as 5 packed lofts. A frsah shlpsmut (lob 3) of Monsanto 4-eulfophthalic anhydride m used} two of ths syntheses were 5% 4-sulfo, and the other thraa wars 756. The plant had trouble pumping aaeh finished synthesis slurry from the kattXa to ths sulfation tank due to ths sandy netora and rapid settling tendency of tha pigment* After consultation with B.8.D. a spacial pumping procedure was sat up and is still in ms* fhs operation cannot ho considered completely satisfactory, however, slnoo it requires excessive opsrator attention* Tha final packed lot quality was satisfactory, as Judged by flush-out at Kewark.
In Soveaber, ths plant dsoidsd to awks a seoond trial campaign of fitus HtF to determine if any operating problems othsr than posting difficulties cadet. They fait that ths pumping prUblsa oould ho overcome. This campaign was ultimately mads in January, 1953# and ths results reported in the plant Quality' Control report isousd 2/L9/53*
A. Chlorination
Soring the month of March attention was dirsotsd toward elimination of tha excessive blueness of tint (blue to v blue)* Antimony odds ("Ttaonax") and antimony trichloride wore both evaluated in ths plant as replacements for ths aluminas ohloride catalyst, and in April antimony odds was used almost ex clusively. Both lab and plant quality indicated a significant reduction in blusnssa, presumably as a result of this change. The initial reaction violence associated with the use of Sb-jOa catalyst was overeppas by "reverse" addition of ingredients) i.e., adding the CPC and the catalyst is tha sulfur ohloride (in the autoclave).
A series of 18 chlorinations was snds in Kay using a 3 hour hold tins at temperature (4 hours standard), 10 with sulfur ahlerld# of 68.7i*axlmum ohlorins content, and 8 in ths rang" 68*7-69*656 chlorine* She 10 at 68.756 chlorine wars blue in tint) whereas the 8 at average 69*156 chlorine war* equal -to standard* -This work was discontinued to eoaosnbrets on ths rotary d^ysr '.. WtCnaXdMBMI
la May the use of *BP" type (unsulfated) chlorine-free crude for chlorination was adopted as standard procedure, and standard quality anl perfor mance ware maintained at a lower ingredient cost) `see BM-52-9 for dMrrw;.-
DUP050069726
-7-
As past of the program to alleviate the plugging of the rotary dryer sapor line* lengthened dryercyolss and pelletisation of the erode in the rotary dryer, the followlngsere triads
1. the quantity of SbjOo catalyst was radooed from 13-1/2# to
10# sal than to 7# Ow p
- Ho improvement In
dryer performance was noted, nor any quality shift asso~
elated with these changes*
2, The chlorination alee was reduced 1535} no improvement noted*
3* 2QQffaalt (Sad) in the rotary dsyer, prior to dropping the charge from the autoclave, failed to reduce palletisation or improve drying characteristics.
4. irnffotl,..
5, A longer steam drying cycle was also tried without success *
6* Finally, six chlorination* were made using AKXU catalyst, and a significant improvement in dryer performance was noted (less vapor Ilia pluggaga and less pellets)*
Additional work on this problem was deferred until repairs to the absorption towers and rotary dryer exhaust system were completed (7/26-8/9} vacation shutdown) Seeause ef the more violent reaction, when using Aide instead of SbgQa catalyst, additional trials using Aid* were delayed until the wind use consistently blowing sway from Newport to avoid any possible funs complaints* assumed use of A1GU in Ootober, significantly improved dryer per* forsmmej however, eome blueness^and dullnses occurred (later attributed to the use of eged AlCl*) and the ewiteh back to SbjO* was mado* Meanwhile, modifications of the rotary dryer vapor and exhaust system sufficiently im proved the rotary dryer performance so that the use of SbgQ was permanently adopted, because of its bettor storage properties and more easily controlled rate of motion. The problem of pellet formation in the rotary dryer me never overcome. Each charge was sofeeasd (+ 1/8" holes), and the peltate sent to Newark for pulverisation and than back to Mswport for extraction and sllling,ete
S, ffiWm
In March, a new lump standard (B-624, S.W, 1480) was set vtp to replace AOT-7%-0, S*M, 2609 ae the Bewport shipping standard, By rubout, s,tf 1480 was natsd 100*100, a intense, versus 8,V, 2609*
As part of a coat reduction program, 8 plant packed lota (914 inclusive) were processed without a final acid extraction (following s ' milling.and.distillation), Newport and Newark quality svaluat:*-- J--* no quality loss due to this ohenge) therefore, following a a May, the proceee ohange was permanently adopted on 6/9/52,
DUP050069727
8 Starting in July, the plant willing operations mr studied* The pignast loading par will charge was increased Craw 400# to 480# and Ham to 450# (24 hoar grilling cycle) to stlllse the finishing faollitiea at capacity. There me a wjr alight ( lit) strength loaa aaaooiatad with thia change} howerer, tha inoraaaad loading ana oontinuad to gain production* A study of plant finishing indicated tha alkaline aactraotion follow ing aoatona distillation aright ha unnecessary. Two abort campaign* la the plant, pressing and washing tha slurry treat the still altar aoatona distilla tion, oonfirwed thla| Kswport and Kaark quality were found to be satisfactory In all applications Therefore, In tha Intaraat of coat reduction, thia prooeaaing ohanga was adopted in Koveaber* Soring Daoaatoar the first trials of thebe willing # wade in tha green mills* Thia work la reported in detail in a report issued by J* tf* Kinnich, 2/17/53*
DUP050069728
oopy
APPENDIX I
2. I. DD POST OS NEMOURS & OO.
INCORPORATED
PIQKENT3 DEPARTMENT
CCi 2* Boases - Vila*
2* Booge - * 2* Tully - Newark
. H. H* Chalepaki * Rwpt.
Hi ||iiM, 2* Cooper * * 2 Mlb) &* *
V* Wtariah m n 12.4, 3*1
Newport, Delaware November 12, 1952
QF.gLtffi imw MW!
MiKtetttn
As put of a program to improve bios ball Billing (strength and/or productivity), a statistical study of milling variables was undertaken. The quality data of approximately 200 plant mill samples were tabulated, together with such available operating and analytical information as might be expected to be related to tinting strength, and these collective data were subjected to a atatiatioal analysis. Ry simple cad multiple oorrelation methods four variables were found to be significant, and a formula wee developed to show their respective (end collective) relationship to ball mill strength.
Of the eight variables studied only four were found to be significant} these were (in order of decreasing effectiveness) 1) milling tins, 2) pigment loading, 3) mill speed, sad 4) 2 extracted solids* These four variables collect ively accounted for 822 of the total variation of ball mill strength) their respective effects any be summarised as feUcuei
1. Increased milling time fvoai 21 to 30 hours increased strength by 3*62 units. Provided everything else remained constant, this would asaa a strength increase ofO.4 units for every extra hour of willing over 21 hours.
2. Increased pigment loading from 314# to 342# caused a 'Strength'
lose of 1.34 unite, or a lose of 12 for every additional 36# of pigment over 314#*
3. Increased adU speed tvm 20,7 to 22*3 BPH caused a 1*12 increase la strength, or roughly a 12 Increase for every 1*5 BHt over 20.7.
DUP050069729
? 2
4* 3jaoreased purity {% extracted solids) tram 87-93# cawed a strength low of 0*4 units, or 0*5# strength loss for every 7*5% increase in % extracted solids over 87.0#.
t
the fornula derived for predicting hall nill strength, wing the above four variables, tan
8 115.6 1.34 (L) * 3.62 (T) . 0.67 U) 0.06 (*)
where $ * ba|l
strength
L pigwent load (1 314#, 2 - 362#, etc.)
T willing tine w * 21 hours, 2 * 30 hours, etc.)
R SB! (we actual figures)
$ - % extracted solids, adnw 60.0
N
(See disowsion for applied estasg&e.)
Using this forsula final ball will strength can be predicted within 1.2# of the actual valw, provided the values for the four variables are wtthiiofreasonable liwlts (See disowsion.)
The above formula was wed to prepare the following tsble showing
predicted
strength for Variations in willing tlwe and pigwant lading,
assuming an average RIH (21.5), 10*1 acetone to pigaent ratio in the wills,
and average crude quality and purity.
Strength
Mllliw_Tiwe;
Plswent Loading -Lbs.
Hrs.
331 3,62 mjaas*
21
99.5
100.9 102.2 103.6 104.9
24
9S.4
99 .a 101*1 102*5 im*$
26
(97.5)
98.9 100*2 101.6 102.9
30
95.9
(97.3) 98*6 100.1 101.3
34
94.3
95.7 (97.0) (98.4) ,99.7,
39
92*3
93.7 94.9 (964) (97.6!
44
90.7
92.1 93*4
%&
96.0
Calculated from data far beyond the Unite wed during derivation of the forsula and therefore not within the accuracy of the fornula m 1,2%
strength deviation from actual valw). ( ) goal figure to produce pack His
in the range 99-100il00, weaning roughly 2# strength low ins to finishing operations.
DUP050069730
3
Dm variables correlated daring the period of this study (4/15/52 to 10/1/52) and their respective ranges vers*
tine (21 and 30 hours)
- hallo - (20,50000#* two 24,000#)
Mill
, - Mml - (O33U4#f an4d 3W)
Mill speed (BPK) - (20*7 to 22*3 SIM)
Crude posit? (% extracted solids) - (87 - 93%)
% chlorine In crude - (3.7 * 4*53)
# kerosene lot erode - (0*7 * 1*330
Quantity of %S04 need in sulfation (39" and 41*)
Within the above ranges, variables 2, 6, 7 and 8 were found to he Insignificant, whereas 1, 3, 4 and 5 had significance factors veil above the sdnimum required for 93% correlation. In using the derived formula (see it would he reasonably safe to use flguree outside the ranges shown; however,
ears should he taken not to do this with all the factors sLsultaneously.
7b simplify the oaleulitlons the numbers 1 and 2 were assigned to seen of the variables (leading and thee); therefore.
Assuming 97*100 hall mill strength is required, wh pignut loading could he tolerated, aswiping 1) use of crude with 9i*$C extracted solids, 2) BIM mill speed, and 3) 24 hour Billing
oyole.
S - 115.6 1*34 (4) - 3*62 (T)* - 0*67 (S) 0.06 (#)
97 -135*6 1*34 (1) * 3.62 (1.45) - 0.67 (24) 0.06 (11.5)
X. - 1.52 or 339# lead would be
*T - 1.45 1 4/9. since 1 * 21
2 -30 how
At - 9.
DUP050069731
-u*
Since the derivation of this formula ita prediction* have been cheeked several tines against actual plant data and found to be veil uithin the prediction accuracy of J* 1.2 strength units) therefore, its use, as pre viously specified, can be recommended.
EFKJrsad
E. F. KLEHKE, JE. CHEMICAL DIVISI0I7
DUP050069732
APPENDIX II e . x* d u parr b e Nemo u r s & co.
INCORPORATED
PIGMENTS DEPARTMENT
CCj C. Roeeee - Mils. G. J. Higgins - Files J. W. Mirmioh - (2) J* N. Tully-J, H. Cooper Res. Fils - Newark E. F. KLenke, Jr.
Newport, Delaware February 17, 1953
PASTE ("OKI") MILLING OF CPC PIGMENTS ............___________________________________
The pasts willing technique was first established in the plant
in late Noveotoer 1952* Because of our oversold condition, the first goal
in utilising this technioue was to establish that 0oabination of
load--
Mil hours aost compatible with other stops in the finishing area for nunrimaa
HUPttV
Because the blue still capacity permitted capitalisation on only snail reductions in milling tins, efforts were directed towards establishing a larger Mil loading* As a result of this work a 550 pound will charge (150$ of standard), with a 30 hour Mlllng cycle (12556 of standard) was adopted. This combination produced satisfactory quality at a rats that could have con sumed wore crude than available in December and January.
Various other coobinations of loads and < 11 <i^g times were 'evaluated to establish tentative quality litre!*. This information is listed in Table I.
The else of the green finishing press forbade immediate utilisation of increased Mliing rates fay increasing mill loads bsyond 450 pounds} there fore, the efforts to improve green milling rates were directed to reduiing milling hours* Recently the green press has been enlarged and investigation of inoreased mill loads in proceeding. Green mining data is list#! lit Table II.
.1. Establish optimum oontoination of paste and wet (Newark Seed-works)
2 Establish optimum degree of wetness in paste g
(Newark Smi-worke)
DUP050069733
2
3. Determine effect of 2 kerosene orude on e&llabilltjr. 4. investigate 2-step aoetone addition during wet grinding. 5. Determine production rates possible bjr pasts grinding
along--no net grinding* 6. Inproved xsill discharge and drainage. 7. Replacement of aoetone with safer* Isas expensive liquids.
JWMiad
J. V. MUNICH QUALITY CONTROL SUPERVISOR
DUP050069734
ki
M`M: ix
I
DUP050069735
ITable om itted from copies. 9 and 10 o f th is re p o rt
9C
lg --m h
tI
a *
$ i8 $
i if
. 4'
n
Regis'0-*
!IJ a ! i
A A
A AM
8: g & 85 8: &
1 3^^ 8 ^
I ( *0 <J n0 sO 'O
I II % I S 8 fi
11
I
5
.*
i& 2 CO 4* ow
1) H
o> t0POuHo>. & V*
+1 +1
1
rH
iE-*
DUP050069736
SiifaUistk
DUP050069737
&1
grated aa
Cooper to
the ?.
Sswport reference standard B. Chalopeki, 3(3;/53
fo r
BT-297-DKJ
(B in e
BG8)