Document B5Xx16r6w39wRZ70R97aBK6Rm
Monsanto
CONFIDENTIAL
* iNANf * LOCATION' E. E. Stewart. W. G. Krummrlch Plant
Mil Muter mMNCI
TO :
January 3, 1973
STATUS - PCB
POLLUTION CONTROL PROGRAM
Mr. J. R. Savage
General Offices
B2SL
'
cc 0. L. Bratsch C. F. Buckley
V. C. Engman
P. E. Helsler 0. A. Hippe
P. B. Hodges - G.O. (E1SP) A. E. Lelsy/R. M. MeCutchan
W. R. Richard - 0.0. (T3A)
This Is the January 1, 1975 status of PCB pollution control program.
I. PCB LEVEL IN SEWERS
December losses at 1.8 #/day from the operating depart ment and the Incinerator area are about 40$ of the November losses. The Waste Treatment Influent and Effluent losses of 5 end 4 #/day are slightly lower than last month. These numbers Indicate about a 3 #/day background. Do not expect significant major improvement beyond these values unless specific projects are provided to eliminate known small losses. (1 #/day Is equivalent to about 0.001 ppb In the Mississippi River.)
Aroclor sewer, loss control data are attached.
A. Aroclor Department - PCB losses from the department decreased from 4.36 #/day to 1.63 #/day during the month. The November value reflected a 75 lb one-time loss. There were no major losses in December. Addi tional reductions are possible by eliminating air blowing In the continuous aeration process step. A premise has been prepared to eliminate this step in the process.
B. Incinerator - Measured losses decreased to 0.17 #/day. This is a significant reduction when compared with last months 0.65 #/day. Efforts will be directed during 1st quarter to attain the desired goal of 0.05 #/day. Incinerator on-stream about
91% of the time.
IN 10 N*V. 1/71
HONS 029751
Mr. J. R. Savage
STATUS " pCB POLLUTION CONTROL PROGRAM
Page 2
1/3/75 WOK
I, PCB LEVEL IN SEWERS (cont'd)
.
C. Total Plant ~- Influent losses at 5 #/day are the same as last month. During the month record lows of 4 #/day were seen. A comparison with losses from the manufacturing and Incinerator areas would Indicate a background of about 3 #/day from the entire plant and Sauget village system.
D. Treatment Plant Effluent - Measured losses of 4 #/day slightly lower than 3 #experienced last month. 4 #/day
Is equivalent to about 0.004 ppb In the Mississippi River.
II. PROJECT STATUS
Project 3972 - "Reroute North Basin Sewer" - To reroute
effluent from department North Settling Basin such that all sewer flow from the department will flow from one point.
Project about 90% complete. Electrical supply to pump
remains to be completed early in January.
Project 3956 - "Alterations to HC1 Distribution System" to eliminate possibility of sewering Dept. 246 HC1 off-gas. EDC 5/1/75. This will be reviewed to determine how to expedite. Objective to prevent sewering off-gas will be realized, but water savings will not be possible until
. smaller Jet be installed to handle reduced air blowing and related tank vents. Premise prepared to meet total objective.
III. PROGRAM STATUS Re Engman/Bratsch 4/24/72
1. HC1 Off-Oas
A. Aroclor - Continuing to coordinate production with chlorosulfonlc acid production to prevent sewering off-gas at Dept. 246.
B. Beginning design on project "Ihstall PCB Off-Gas Scrubber" $73,000 capital, $4,000 expense.
2. Blow Tank Off-Gas
Premise prepared to permit elimination of air blowing and provide means for removing water vapor from Inter mediate storage tanks vapor space. This Is part of
water reduction project. About $6000 capital and $6500 expense. Required for water reduction as related to chemical treatment of plant waste stream at sauget village treatment plant.
HONS 029752
Mr. J. R. Savage STATUS - PCB POLLUTION CONTROL PROGRAM
1/5/75 Page 5 WGK
III. PROGRAM STATUS (cont'd.) 5. Aroclor Department Catch Basin
Project 3972 about 90# complete. Completion expected in January.
4. Incinerator Scrubber
No work planned.
5. Incinerator Catch Basin
'
No activity to reduce losses in December.
6. Rip Track Washer
No activity to reduce losses in December. Loss data
at the WTP Influent does not indicate major losses from the Rip Track Area.
WGK STRATEGY
Continuing in-plant program to reduce to lowest technical achievable level. River samples being analyzed to get profile
data with regard to PCB content. Inquiry made by Federal EPA via Jack Hume concerning- PCB's. Hume/Bratsch, 12/19/72 memo "Meeting 12/14 with Federal EPA."
Edward E. Stewart Technical Services Department
/tm att
MONS 029753