Document B5OdgoyEYbRe2XkaM3V7bLL9j

PLAINTIFF'S EXHIBIT DUP-1415 NEWS LETTER. APRIL m3 NEW STANDARD ON ASBESTOS ISSUED Enginwring Standard S4T, Measurement and Control of Asbestos Dust Expoitire, baa been included in tbe April issue. Tbe standard provide* information and guidance on tbi* subject. It ba* been in preparation for over two yean by tbe Safety A Fire Protection Subcommittee with tbe assistance of Haskell Laboratory. Thefollowing general information may assist in tbe atudy'and u*e of tbi* tandard. Tbe standard provide* guidance for any Company operation in which there may be exposure to asbestos dun, and conform* with OSHA regulation*. It i* expected that each plant will eitabliah (pacific rule* regarding any operation which create* a*be*toe du*t *o that personnel exposure is held within tbe prescribed limits. Sufficient dust sample counts must be made to bow that exposure is within these limits. Company-wide specific rules, with two exceptions, are not yet feasible. Tbe Safety A Fire Protection Subcommittee will consider such rules at a later date if and when sufficient data are available. The two exceptions cover demolition and removal of asbestos insulation, and asbestos spraying. Both re quire supplied air respirators and special clothing. Tbe standard assumes tbe dust concentration limits requiring such equipment will be exceeded whenever these operations are performed, an -assumption also incorporated in the OSHA regulations. The assumption may prove incorrect for saaB jobs or for work han dled under carsfully controlled conditions. Again, tbe subcommittee will welcome monitoring data for future consideration of revisions. Medical requirements, suefa as examinations, records, and control included in OSHA regulations, have been noted but are not detailed in tbe standard. Tbe Employee Relations Department bas asked that these activities be bandied by its Medical Division directly with the departments and plants involved. Engineering Standards Program 1972 Annual Report RESTRICTIONS LIFTED ON WELDING SPECIFICATIONS Several items in the 1972 Annual Report to the Engi neering Standards Committee in March should be of interest to News Letter readers: 1972 production totaled 869 new, revised, or reaf firmed standards. At year end, there were 2,801 stand ards in use of which 96 percent have bad complete reviews within tbe last five years. Portions of standards which are Requirements of tbe Occupational Safety A Health Act (OSHA) were printed in red starting in February 1972. A total of 187 were issued in 1972. Estimated annual savings through the use of standards increased 12 percent redacting primarily increased de sign and construction activity. Tbe Engineering Standards Committee consists of 21 members representing every industrial department plus Central Research. Employee Relations, Engineer ing, and Remington Arms. They establish policies, provide general guidance, and administer the program within their departments. Sixty-nine plant coordinators promote tbe use of standards and provide valuable liaison at tbe plant sites. In addition, subcommittee membership now totals 80 from the industrial departmenu, 118 from Engineering, and 19 from other staff department For several years, approximately 75 percent of tbt welding specifications (SW--W Series) have contained a clause restricting their use to Company. personnel only. These 86 standards contained procedures and processes which had been developed by Du Pont research or practices and were considered proprietary. A recent re-examination of these standards and of the general level of technology in tbe welding industry bas indicated a need to change this policy. Most commercial practices now incorporate tbe information previously con sidered proprietary. As a consequence, these standards are being revised to remove the restriction and encoiitage their use both in equipment procurement and in contract work. Tbe revision issues were begun in January 1973 and will be completed during tbe year. In tbe interim, users are encouraged to use tbe specifications where appropriate, waiving tbe restriction and adding tbe following in tbe body of tbe order or contract: "The intent of this procedure is to assure welds of acceptable quality in Du Pont work. Vendors, contrac tors, or other users outside of Du Pont who apply this procedure are responsible for tbe quality of their welds. Adherence to applicable codes is required." Possible questions on this change should be directed to: K. E. Finger, Standards Section, telephone 8--121--3875. Pag* 2 DUP 1120511 DU 055323 NEWS LETTER, JULY 1973 BUY -- Guytd Stacks Revised Recently. * failure occurred in a "'i" diameter aleel strand guy wire at tie field-fabricated termination where the strand was bent around a thimble. Terminating steel strand by bending around a thimble should be discontinued until the cause of the failure has been determined. If steel strand is used, it should- be terminated by using open strand sockets. Terminations requiring thimbles for steel strand have been deleted from BUY. The use of preformed guy grips has also been suspended pending investigation. The termi nations for wire rope are acceptable as shown in the standard. The A & C Section, Design Division, Engineering Department, has initialed a test program to determine the cause of failure. All plants having stack guys of steel strand with thimble and clip or preformed guy grip terminations should make a visual inspection of the cable termination for damage. Any that are found defective should be re placed using the socket method. Consultation on stack guy problems or inspection should be referred to the appropriate A & C Section Supervisor. It would be appreciated if all stack guy failures were reported to A & C Design. Other minor revisions have been made to BUY for clarification. When the testing program is completed, the standard will be reviewed and, if appropriate, use of the deleted terminations for steel strand will be reinstated. WhVr* W Art - (Uuv'swJhMa* April 1959 -- that's whan our "old friend" first oppsorsd in the Naws Latter. Sines that time, he hot been busy Leaping up. with tha developments in the stondords that have occurred in these past M years. This will be his last oppearance. He retires with this issue. Asbestos Insulation Substitutes In April 1972, Code 502, Insulating Cement and Code 502.1. Insulating and Finishing Cement were revised to include only asbestos-free materials (see SN500M). Included in the May 1973 issue was a revision to Engineering Material Specification.SNIWJM,Preformed Block and Pipe. This specification now includes only asbestos-free inhibited and uninhibited calcium-silicate insulation for Codes 102 and 102.1. The manufacturers' new materials were validated by the Process Insulation Subcommittee after on-site evaluaUon and extensive testing at the Engineering Test Center. Suitable asbestos-free replacement products for Code 130. Asbestos Board and Code 715, Asbestos Cloth are under development by manufacturers and are being re viewed and tested by the Company. The replacement of these two products will eliminate all of the materials in the insula tion standards which could create an asbestos dust problem. ----------------- -------------____ _ STANDARDS ISSUED In'TuIy , INCLUDING OSHA PROVISIONS B22S. B9Y. DE10C. S24B. S5C, SW20.5W. SW20.22W In keeping with the limes, he is being repioetd by two young men -- both soger to learn and to absorb all of the information covered by the standards, They will appeor from time-to-time in the News letter -- discovering that -- It's in the Standards DUP 1120512 Pa^ 3 DU 055324