Request For Capital xExpendltures/Retirements
DIVISION OR COMPART
Organic Chemicals
LOCATION
]
Chicago Plant
Dept.
J.o. CONTROL POINT
097
JOB Tine
1
Purchase and install lead
carbonate pump
REPORTING CLASSIFICATION
Cl
OAT APPROVED
12/11/79
JOB ORDER NO.
OC-4886
SUMMARY OF AMOUNTS
DESCRI PTtON
LOCAL CURRENCY
ESTIMATED PROJECT COST
d is ma n t l e me n t e x p e n s e
*utsn`U-*BS
500--
-------------
TRANSFER: EQUIPMENT GROSS AMOUNT FOR APPROVAL
$356 ~
LESS TRANSFER EQUIPMENT
L ESS SALVAGE P R TR ADS-IN ALLO WANCE NET CASH REQUIRED (g o f -3027)
$5356
RETIREMENT DATA
DISMANTLEMENT LESS SALVAGE
1,600 500
TOTAL - CHARGE RESERVE
2,100
DESCRIPTION AND REASONS REQUIRED
ECONOMICS as called for in General Procedure Memo #3
Attachment C. (Attach calculations)
ECONOMICS PERIOD
net sal es
NAT {p r o f it /s a v in g s ) .TOTAL INVESTMENT
% ROI (o n t o t a l in v e s t .) INTERNAL RATE OF RETURN PAYOUT OF NEW FIXED CAPITAL
REV*#
1
REVISION DETAIL (GROSS AMOUNTS)
CUM. AUTHORIZATION
Funds of -------------------------------------------- -------- ------------------- ------- --$5356 are requested to purchase and Install an air operated lead carbonate pump.
O-'
o
6-77
NA 3006 REV, 6-77
OC-4886------12/11/79 Page 2 of 4
DESCRIPTION AND REASONS REQUIRED
Proposed Work and Cost
Funds of.............
.. . .. ............... .. . ................................................ $5,356
are requested to purchase arid install an air operated lead carbonate pump.
Present Situation and Justification
Basic lead carbonate is made in two carbonating tanks and pumped into a holding tank above the drum dryer. It is then dried, ground and further processed as required. The pumping operation to the holding tank above the drum dryer is accomplished by the use of a steam pump installed in 1966. The pump is badly worn. It leaks carbonate slurry on the floor and into the sewer system, aggravating the plant's effluent problems.
An overhaul will cost $2,618. The resultant repair is judged to
be short-lived. This pump is near the end of its useful life and
the plant has no other pump to use as a replacement in case of
failure.
'
A trial, air-operated diaphragm pump, the same as will be purchased, was tested recently with success in lead carbonate service. Also, the plant uses a similar design air pump in lead phthalate-sulfate processing. Its design is far more economical to maintain than the old steam pump.
Commercial Factors
This order supports a plant budget for lead stabilizers as follows:
Sales (k lb./$)
1979 Budget
Pounds Dollars
P.O.S.
9 Months 1979
Pounds Dollars
P.O.S.
8,650 4,512 1,548 (34%)
6,419 4,405 1,195 (27.1%)
r. YWT 34-0006335
C 1TA IV A JV*- Z X>
004886 12/11/79 Page 3 of 4
Details; of Proposal The plant will purchase one Wilden Model M-15-S air operated double diaphr'am pump, with spare parts and necessary three inch plumbing to install. Present steam pump will be scraped.
\ Contingent Future Commitments This proposal will not require additional funds to complete.
Alternatives Considered Repair phe present steam pulftp. This was rejected because of the high cost of parts, labor, and limited useful life. The new pump will be more economical to maintain.
Risks No operating risks are involved.
Summary This is a replacement of a physically exhausted pump with a better pump.
CYWI 24-0006336
iOF- 30*7 REV. 7/62 u'*^ 7/62
DETAIL SHEET
SHEET NO.
JOB ORDER NO.
COMPANY
American Cyanamid Company
ITEM OR
CODE NO.
DESCRIPTION
OC-488612/11/79 Page 4 of 4
11-20-79
LOCATION
Chicago,111,,
EQUIPMENT OR
MATERIALS
ENG. MECH.
SVC.
1 Ailr operated pump 2 Piping 3 Spare parts 4 Dismantlement 5 Shipping charges 6 Illinois state and use tax
3190 500 197
50 219
500 500
200
3390 1000
197 500
50 219
4156
1000
200
$5356
Dismantlements Carbonate Pump
Acq. Date Acq.Cost Disposition
6/71
1,600
Scrap
CYWT 24-0006337