Document B54kb4j4jaeV8XB8jrZradErm
ESCAMBIA CHEMICAL CORPORATION INTEROFFICE MEMORANDUM
Tot
Fvmbj
Km
Mr. T. L. Carey
Defeat
J. J. Dorsey, Jr.
Copiot
Summary of Technical Department Monthly Reports - September 1966
October 8, 1966
NEW PRODUCTS
DNT
The DNT plant was completed the last week of September. It was decided, however, to delay the startup of the plant until the Biazzi represen tatives arrived and they had an opportunity to inspect the plant. Many instru mentation and electrical problems were resolved through the intensive efforts of the Construction and Design, Instrument and Electrical groups. Similarly, shortages of equipment were solved by the Construction group with the cooperation of other sections of the plant to provide alternate pumps and other equipment where necessary to complete the plant on time. Full credit and appreciation is expressed to all of the operating, Construction, Design, and Maintenance personnel involved.
It is expected that the plant will startup during the first week in October.
ADE
There was no opportunity to do any work on the ADE project this month because of unexpected problems in amines and the necessary assignment of personnel to the DNT plant startup. R. E. Jones and I am attempting to summarize the engineering phase of the work, while Messrs. Fowlkes and Tolar are attempting to summarize the laboratory phase. The information is here; it is simply impossible to find time with the other problems to do this work at this time. I am afraid it may be necessary to delay summarizing the ADE work until sometime during December.
LABORATORY
Laboratory work during this period has been concerned with the special projects and amines problems over and above routine control work. Training of the DNT personnel and laboratory technicians in DNT analyses has proceeded throughout most of the month.
T e c h n ic a l Sum m a
..4_J
AP00045593
Mr. T, L. Carey
-2-
October 8, 1966
The laboratory group has concentrated on evaluating new MIPA catalysts. At month end a new Harshaw catalyst was tested and installed in the plant which appears to give superior conversion fend selectivity to desired products. This catalyst also is stronger than previous catalysts and appears to be a considerable improvement. It is unfortunate that we did not have the manpower to 8 eek an improved MIPA catalyst during the past 18 months, because it now appears that better catalysts are available which should be evaluated and which could allow a substantial reduction in catalyst costs as well as improved yields and selectivity to desired products.
Catalyst testing of MEA catalyst also was carried out on a crash basis because it is impossible to obtain delivery of new catalyst on other than an extended delivery basis.
ENGINEERING
The DNT plant was essentially completed except for tracing and insulation on the lines leading from the check tanks to storage and loading at month end. Final costs of this project will be approximately $1, 350, 000, depending on the amount of overhead which must be paid Chemical Construction on their work.
The new 600# boiler and water treating facilities are proceeding on the revised schedule with completion expected to be about November 15 to Decem ber 1, depending on equipment delivery.
Details of the various projects are covered in the Engineering report. Separate memoranda are being issued explaining project overruns which have occurred. Most of the overruns can be explained by the accelerated need for the improvement involved which has required overtime, increased labor costs, and changes in the scope of the project since estimated.
SPECIAL PROJECTS
Mr. Rogers issued several evaluation reports on the production of ammonia and methanol from new large plants located either at Pace, Florida or in Texas, or in Louisiana. The lower gas costs for a single facility in Texas or Louisiana are compensated for by economies in adding to the Pace facility when a single plant is built. However, if two facilities are built, substantial economies occur in a Texas or Louisiana location,
GENERAL
The plant Process Improvement group does not have sufficient manpower to accommodate all of the present and projected needs nor does it appear that
AP00045594
Mr, T. L. Carey
-3-
October 8, 1966
the 1967 budget is adequate to sustain the manpower required. Essential work in amines, DNT, and some other plant areas can be handled. Other essential work will probably have to be handled on on a hit-or-miss basis as has been the case for the past two years.
Mr. Ronald Beech joined the Process Development Department at month's end and is assisting with the DNT plant startup.
mdc
AP00045595
SUMMARY OF PROJECT WORK STATUS
Protect No.
Title
Appropriation MS
6501
Water Softener* to Provide Water for Boiler
18. 0
Committed Revised Completion
M* MS
Date
10. I
18. 0
12/1/66
Remark*
Equipment due early Novem ber. Field piping In progress.
6509 6535
6565 6585
Air Condition It Enclose Wet Bay Control Room Ammonia Recovery Preeaure Control Syetem
DNT Plant
' Equipment to Produce IBN ft DEA - Amine*
6.0 3. 3
B70.O 223.9
6604 6605 6613
New 600 pel 100,000 I/Hr. Boiler
320.0
Upgrading Water Treatment
105.0
Produet Coating Syetem - NP
IS. 5
6616 6617
6621 6622 6631 6636 6632
6633 6635 6640 6642 6647
Provide Office*, Locker Room and Storage
Additional Bulk Car Loading Facilities - PVC
14. 3 10.4
Refrigeration Unit for Cooling Solution* Tank* - PVC
Spare Block for Recovery Compreeaore - PVC
Additional Electric Heat and New Converter for #1 Plant
H.P. Water Pump, H.P. Scrubber No. 1 Plant
12.0
14. 3
8.0 15.0
4.0
New Methylaminca Check Tanka
Plant Steam Recorder
Maintenance Shop-Area B
12.4
l.a 26.0
Purchase of Lab Equipment Amtno-Phoi Production
23.4 200.0
6649 6652
Ammonia Reform Cae Guard Veaael
Amine* Plant Expansion*
31.3 1360.0
4.0 6. 0 1.5 3. 3
1323.0 1385.0
218.0
224.0
238.8
320.0
101.3 7.5
105. 0 15.5
none 9.5
14. 3 10.4
10.7 14.2 55.2
1.5
12.0 14. 3 55.2
4.0
15.8
1.2 none
9.9 208. 0
15.8
1.8 26.0
23.4 210.0
27.7 111.3
31. 3 1360.0
10/31/66
Still 95% complete.
11/1/66 ------ > *-->
12/1/66 12/1/66
Indefinite
Waiting for material deliveries Ic available instrument man power.
Production Qmpiete: 9/16/66 Storage Complete: 9/30/66
Production complete; storage by 11/1/66. Tank foundation complete. CBfcl fabricating tank. Piping fabrication in progress.
Field work on schedule. Equipment due second week of Octobe r.
Field piping in progress. Equipment due early Nov.
Elevator received. Job being deferred at requeet of Pro duction.
Approval still pending.
Indefinite 9/30/66
95% complete. Awaiting available manpower for Installation,
Complete.
8/15/66
Complete.
7/29/66
Complete.
Indefinite 7/28/66
Installation dependent on Production's decision aa to proper uae of pump.
Complete.
Indefinite 1/31/67 Indefinite Indefinite
8/31/66
Waiting for ahutdown to imtall
Approval obtained. Construc tion will start immediately.
On* agitator remaina to be Installed. Will be completed when Production releaaea tank for work. Complete.
4/1/67
NH3 column to be delivered by 12/1/66. Condenser* due in December. Engineering in progress.
AP00045596
Summary of Project Work Statue September, 1966
Page 2
Project No,
Title
1580.18829 Independent Raw Water Supply - PVC
Appropriation MS
9.7
Committed Revieed Completion
MS MS
Date
Remark!
3, 6 9.7 10/15/66 Work in progreei.
1580.18339 New Blowdown Tank for Compreeeor Building
1580.13862 Revise Gondenaate Syatem from PVC Dryere
1770-6003 PVC Reactor Reglaulng
2.7 3.0 38.0
3. 7 2.5 23. 1
3.7 3. 0 38.0
8/31/66
Complete.
Indefinite Indefinite
Awaiting delivery of pumpi to complete job.
Spare reaetor being regiaaeed at Glaacote with acheduled hipping date of December 2.
10/5/66 / n*
AP00045597
PHOTOGRAPHS OF COMPLETED DNT PLANT As of September 30, 1966
View of interior of structure showing nitrators in series.
View of completed plant from the Southeast.
AP00045598
1
ESCAMBIA CHEMICAL CORPORATION Interoffice Memorandum
To: Mr. T. L. Carey
Date: October 5, 19^6
From: E. M. Spurlock
Re: Monthly Report - Personnel Department - September. 1966
PERSONNEL
Activity for the Month
Division
No. of Employees
8/31/66
Admin. & General Research Agrl. Chemicals Industrial Chemicals Production
Totals
6515 167 17 Jfl1
731
September Additions
23 15 20
31
September Separations
1 6 92
_7
25
No. of Employees
9/30/66
57
57 163 16
444
737
1966
Budget
56
59 167 * 18 406
706
* This includes 160 as listed on the budget sheet plus 7 temporary employees vho were not shown in number on the budget sheet.
There were 210 walk-in applicants, 154 applications were issued and 6 were received by mall. Sixty-nine applicants were interviewed and 109 were tested.
TRAINING
School was held for the operation of trackmobilee and 2 trackmoblle operators were licensed.
SAFETY
The Corporation has worked 10 days or approximately 43,500 man-hours without a disabling Injury. The various division records are as follows:
Division
Man-hours
Days
New York Office
Research Division Atlanta Division Pensacola Plant Corporation
358,500 850,000 171,000
26,500 43,500
1,883
3,363 143
10 10
The laboratories and the Warehouse completed eleven years without a disabling injury. The Maintenance Department completed three years without
a disabling Injury.
P ersonnel
AP00045599
Monthly Resort SAFETY (Coat'd.)
-2- Oetaber 5, 1966
Medical Section
The Medical Section treated 28 Injuries for Escambia and 25 for
Carroll, performed 16 pre-employment and 13 annual physicals and gave
a total of 44 immunization Injections.
EMPLOYEE RELATIONS
Labor Day picnic vaa held on September 5, 1966 with approximately 800 in attendance.
Six 10-year service awards were presented.
INSURANCE
ve paid a total of 66 claims under our Group Hospitalization program which amounted to a total of $ 10,4o8.8o during the month of August and 84 claims amounting to $ 17,748.84 during the month of September.
Ve settled the following claims during the month of September;
Two claims amounting to $ 88.62 under our Automobile Physical Damage Insurance.
One claim amounting to $ 192,667*3^ for payment In full of Physical Damage portion of Methanol Explosion which occurred on October 24, 1965*
Check ves received In the amount of $ 27,807*00 covering Workmen's
Compensation Second Interim Retrospective Premium Adjustment.
EMSjkc
AP00045600
PRODUCTION MONTHLY REPORT October, 1966
AP00045601
lum inary
ESCAMBIA CHEMICAL CORPORATION
Interoffice Memorandum
To: Mr. H. F. Roderick From: T. L. Carey Subject: Monthly Report for October, 1966
Date: November 10, 1966
The item of major interest this month was the substantial improvement in the production cost of methyl methacrylate. The variance from standard has been running in the range of negative $120, 000 to $130, 000. October was a negative $69. 000. There still is a long way to go but the month showed a very s ignific ant impr ovement.
The N-P plant produced 16. 5-16. 5-0 grade all month and had the lowest actual cost per unit in the history of the plant. These costs were $2. 50 per ton under standard.
The DNT plant started up early in the month and by month's end had made a 96 hour performance run which demonstrated the plant capability of producing specification material at design rates. Unfortunately, our customer Wyandotte, will start taking product at a low rate in January and has tentatively scheduled increasing quantities to full rate at mid-year.
Some of the raw material usage rates are higher than guarantees. These will be studied and recommendations made for negotiations of acceptance with Biazzi.
Amines results still leave a lot to be desired. Maintenance and yields are the biggest problems. A negative variance of $77, 000 had been predicted for October and an actual of $108,000 was made. In an effort to apply more technical assistance to the problems, the overall operating responsibility was transferred from Mr. Dorsey, Director of Engineering, to Mr. J. Kramer, Production Manager. This will apply specific production know-how to the area and allow the technical group under Mr. Dorsey to work on the yield problems directly.
The amines expansion program is coming along well and appears to be on schedule. This project should be complete in March at which time these plants should be on budget.
PVC appears to have overcome its recent problems and with a good product mix a very good production for November is predicted.
AP00045602
Mr. H. F. Roderick
2- -
November 10, 1966
All other plants are In good shape and operating well. November should be an excellent month from the production standpoint.
AP00045603