Document B50Vpbn1r6Y64k1BX1YRK1bNm
O'O'" ^
Pap?gcorr,e - St. Louis
June 10, 1971
PCD ENVIRONMENTAL PROBLEM MAY STATUS REPORT
cc H. S. Bergen C. J. Smith
: p. J. A Marrh - Brussels w. S. Clark
J. R. Durland - Tokyo
E. V. John R. E. Keller - Queeny
R. M. Kountz . T. L. Gossage
S. Park
W. R. Richard J. R. Savage E. P. Whef Ler P. B. Hodges
MARKETING:
Safeway Stores, San Jose, California - converted small FR
system to Thermlnol 66.
.
Jiffy Fry Foods, Crookston, Minn. - questioning our edict to replace all FR systems in the food Industry by way of their parent company (Foremost-McKcsson). They claim It
is Impossible to contaminate system in spite of fact they presently have about 5000, cases of french fries under test that may be contaminated toith Thermlnol FR-1. We are push ing them to convert In June/July slack period.
MCS 1016, distilled Aroclor 1142, has been officially designated as Aroclor 1016.
ENGINEERING:
.
CEA 2415 - Waste Incineration
The department check-out and water batching was com pleted and waste aroclor feed to the incinerator was started during the week of May 26. Until personnel could get a good feel of operations, feed rate was held to about 60% of design and temperature was main tained at about 2,200F. At these conditions and with a feed material rich in mineral oil, the aqueous stream
from the scrubber to the sewer was within specification. The vapor stream to the atmosphere from the scrubber was also within specification. The schedule is to shut down briefly this week for correction work on the natural gas piping and the water quench tube.
MONS 0993 70
-2-
CBA 24.17 - Aroclor Distillation Aroclor 10l6
Due to a recent process change in the monochlorobiphenyl process and quantity needed, extensive changes were requireu and this has delayed drafting. The modified Engineering Flow Diagrams are now complete and drafting is moving rapidly on the piping isometrics which will be followed by the steam tracing drawings. It is still anticipated that the project will be mechanically com plete by the first of August. Construction has continued on all elements of the project not affected by the monochlorobiphenyl variance.
CEA 2451 - NC-Phosphate
process design was virtually complete when an associated project CEA 2371 was cancelled. We are now modifying the NC phosphate project to pick up some required facilities which were included in CEA 2371. current plans are to complete the design and then wait for plant construe.ion manpower for the installation which is expected in early 1972. Installation of facilities for the interim run in June is nearly complete.
Research obtained a laboratory centrifugal extractor to prove we can adequately wash the product. These tests were successful after several experiments.
CEA 7817 - Monoisopropylbiphenvl
Currently, this product is being custom manufactured for our one customer's evaluation, with the antici pation that a contract will be obtained for long-term supply, an evaluation grade capital cost and manufac turing cost estimate was made for several alternates and submitted to the Business Group. 'Engineering is now awaiting a decision by the Business Group.
JAPAN:
The response to PCB has been very abrupt In Japan and all use of an Aroclor 1242-type fluid has been terminated in NCR cap sules for copy paper. Furthermore, Imports of Pydraul have also been subjected to critical review and Pydraul 312-A is demanded Instead of Aroclor products which contain "PCB". All this leaves MKK with substantial capacity for biphenyl and^Aroclor but very low demand. We also are limiting sales to closed systems", which primarily Involves transformers and ballast condensers.
HONS 099371
-3-
EUROPE:
1. Legislation, effective January 1972, in Sweden will ban ' the use of PCB's, except under license. Licenses will bo
granted for electrical uses ouch as capacitor Impregnation.
2. We discussed with Dr. Lennart Hvnnerz of the National Swedish Environment Protection hoard the concept of ecologically acceptable' PCB products. His view was that such pioducto, if approved, would be licensed in prefer ence tc other PCB products for specific U3es.
3. Llljeholmens were not convinced of the need for a new degradible capacitor impregnant, but have not yet been advisee of Dr. Hannerz's view.
4. Nokia (Finland) were much more interested in the idea of a degradable impregnant.
The Finnish authorities, although less sophisticated than in Sweden, could take a tough line on the use of PCB's and Nokia are anxious to do all they can to counter the threat to their capacitor business. They are changing from water washing of their capacitors to solvent cleaning to reduce effluent contamination.
MEDICAL:
Norton Nelson, Ph.D., New York University informed the Medical Department late in the month that the Advisory Committee of the President's Office of Science and Technology, which he serves a3 chairman, has preempted the Pesticide Advisory Committee of EPA in evaluating the PCB problem. Nelson's committee is the one which resulted in our discussion with Professor Serafim of MIT and a representative of the Massachusetts Audubon Society last February.
Dr. Nelson indicated that he would ask representatives of Monsanto to present their PCB story to the Committee in the early fall (perhaps September). The Committee is looking at arsenic, cadmium and PCB's as to where the government should put priorities in preventing environmental contamination. Nelson's Informal comments indicate that his committee would need production data and use by various categories.
MOWS 0993 72
-4-
Congressman Ryan
N.Y. ) Introduced HRS57C which was
referred to the Committee on Interstate and Foreign Commerce.
The bill would "prohibit the Introduction or delivery for
Introduction into commerce of the chemical compound known
as polychlorinated biphenyl". The Secretary of HEW would
be authorised to exempt PCB for uso as dielectric fluid In
capacitors, as the coolant in transformers or as a fire-
resistant Ingredient In heat transfer media.
The rest of the bill deals with the type of record keeping and reporting which would be required In compliance with regulations promulgated by the Secretary; inspection of the manufacturing and warehousing and use establishments; and
penalties for violation of the proposed act.
Sam Pickard believes that since Congressman Ryan is not a
member of the Interstate Foreign Ctmmerce Committee, the latter will not be too Inclined to hold hearings on the bill.
PUBLIC RELATIONS;
Chemical & Engineering News editorialized on May 3 on the
Hlvislon's 7C'B environmental program In an article headed
"A White H?t for Industry." On May 19, Congressman William F. Ryan (N<w York) Introduced a bill In Congress to "Prohibit the introduction or delivery for Introduction Into commerce of the chemical compound known as polychlorinated biphenyl." The bill exempts the use of PCB In electrical equipment and heat-transfer systems. Although the bill does not mention Monsanto, a lengthy speech by Ryan on the floor of Congress revived old charges against PCB and Monsanto made at a news conference last year. Only limited news coverage has resulted.
RESEARCH;
.
Aroclor 1242 and Aroclor 1016 - G.C. Results - Ruabon
Receipt of the Unilever paper has allowed re-examlnatlon of
some of the chromatograms obtained earlier since these have also been obtained using similar conditions. Results obtained are given below and data of interest is attached.
Comparison of Aroclor 1242 with Aroclor 1016
Tables I and II list the components which may be present In 1242 and 1016. Comparison of the figures suggests that If the fractionation Is carried out to remove penta chloro and higher compounds only, then distillation could be carried out until the Aplezon L S.C.O.T. or capillary column chromatogram shows removal of peaks from 31 (Unilever chromatogram) on wards, at present. 1016 shows no significant component after peak 21. This may Indicate a wider range for the cut point
MONS 099373
-5-
ln the distillation but may al3o po;:slbly mean that a good packed column might be suitable for control. It also shows that peak 31 (using Apiezon L) la responsible for all the
'penta compounds in the range of peaks 1-37 inclusive.
The penta compounds present in peak number 31 have tentative structures: -
24 - 214'61, 25 - 2'36*
The next observed penta components are in peak 38 and these have the structures:-
24 - 2'3'5' 25 - 2'4'5', 35 - 2'4'6' and 35 - 2'3'61 together with a hoxa 26 - 2'3'4'6'
Examination of the Ministry of Agriculture Pigeon Fat Residues
1) All the- dlchloro compounds and riany of the trichloro compounds have disappeared.
2) The relative concentrations of the high boiling components of 1242 appear little changed.
3) If the pigeon had been fed Aroclor 1016 on the present evidence there would be little trace of any PCB remaining in the residue.
4) There are indications that the residue chromatogram is showing components which may not be PCB's.
5) The peaks in early part of the chromatogram, which do not
appear to be removed, probably originate from the following structures
(No. is equivalent to that Peak in the Unilever Chromatogram) Suggested Structure
18 Major component 21 " " '
12 Minor component 17 " " 20 " 11
8 ""
3-2'31 and/or 4 - 2'4' 2-2'3'51 and/or 25 - 2'5'
4-2'6' 3-2'4 * 2-3'4' 2-4'
Peaks 18, 20, and 21 are present in Aroclor 1016 as minor components only. Peak 12 is of the same retention time as that which shows as a major residual component in Aroclor 1242 subjected to biodegradation.
MUNS 099374
-6The results for this residue conflrn the suggestion that Aroclor 1016 feeding trials by the H of A (Tolworth) would be very enlightening. More detailed analysis of the chromato grams can te made If required but this will be time consumin'; and should be discussed. It must be emphasized that the above Interpretations have been made using the retention data from Unilever directly. This means that Identifications based upon retention time of known compounds, N.M.R. Identifications and retention indices have all been given the same weighting.
MONS 099375
-7-
Arcelor 1016
.1
. Biphenyl ,
', _
2
.. . 2
..
1
3 - 2-2'
2
4
. -.25 .
. ' .
2
5.
'
24
'V
2
6
. .
2- y
2
7
2 - 2*6'
.3
8
2-4'
2
9 10 .
. 2 - 2'5* 2 - 2'4'
3 3
12 -
2 - 2'3', 3 - 2'C' 4 - 2'C'
.3 3
13
l1* 15 '
4 - 4> 2 _ 2'4'6', 25 - 2'6'
2 - 3'5', 3 - 2'5'
'2 4 3
16
4 - 2'5'
3
17
'
3 - 2*4'
3
18
3 - 2'3', 4 - 2'4'
3
19
.3 - 2'3'i 4 - 2 41
3
20
2 - 3'4'
'3
21
, 2 - 2'3'5,i 25 - 2'5'
4
Whcrc components ore given twice retention data is not sufficient to differentiate between the two peak positions.
HONS 099376
-8-
Components Present in 12k2 but removed hy djsti 1)M.)on from 10^6
'Peaks 1-21 considered to be present as in*12,.2
'
'ik (c Unilever Ciirom)
Component
.
C? '
-22
23 24 25 26 " ' 27
29*
30
___ 1L
. 32 33 34 35 36
`
37 38 39 40 41
42*
<3 44 .
45
CO
*
2 - 214151 24 - 2'5'
. ' .'
4
2 - 2'4'5'
: , ' .
3 - 2'3'6>
' :
24 - 2'4', 23 - 2'5', 3 - 2'4'6', 26 - 3'5'. 4 - 2'4'C',
4 2'3'6'
.... -2J
.'
*. :
4 4 4 k /,
2 - 2'3'4', 23 - 2'3' ? .If penta, may be 26 - 2,3'GI or 26 - 2'V6*
4 Poscibii.
3 - 3'4' 4 - 3'4', 25 - 3'3', 24 - 2'4'6' , 23 - 2'3,6'
3. 4
23 - 3'5'i 4 - 2'4'3'
:.
4
23 - 3'5\ 4 - 2'4'5'
.4
25 - 3'4'
2 - 3'4'5', 3 - 2'3'4'
4 - 2* 3'4'
' '
' -4
^-
4
4
23 - 3'4' ' '
"
,24-2'3'5', 25-2'4'5', 26 - 2'3'4'6\ 35-2,3'6* 35-2'4'6'
4 54
24 - 2'k'V
''
'
23 - 2'4'5', 25 - 2'3,4`
'
' 25 - 2'3'4'
'
-24-2'3'4', 34 2'3'6'
. 24 - 2'3'5'6 , 25 - 2'3'4,6', 235 - 2'4'6I
24 - 2'3'4*6 , 236 - 2'4'5'
.
26 - 2'3'V5 , 34 - 3'4'., 234 - 2'4'6'
5 5 5 5 6 6 4L
* Peak 29 structures postulated by UAL .
MOMS 099377
-9-
Eleotrlcal Fluids - R&D Europe
A request from Nokia (Finland) for assistance in removing Aroclor from the water used to wa3h finished capacitors has resulted in Borne work on filtration of watcr/detergent/ Aroclor emulBlons through porous polyethylene developed by the Plastics Division of Nokia, hesults so far show that the level of Aroclor can be reduced readily from about 20 ppm to around 2 ppm. There is evidence from changes observed In isomer distribution that the lower chlorine Isomers are preferentially absorbed by this filter.
Biodegradation - Ruabon
Collaboration with the Ministry of Agriculture laboratory at Tolworth has yielded some interesting results on feeding of PCB products to pigeons and quail. Capillary column GLC analysis or residues after feeding A1242 and A1016 show that there is very rapid degradation of most of the isomers preseit in 1242 and practically all of 1016. The results on 1016 are preliminary, but look very encouraging.
Bio-Test Tissue Analysis - St. Louis
A review of the status of the Aroclor toxicity studies and associated tissue analyses was held 5-11-71 with representa tives from Industrial Bio-Test Laboratories and Monsanto's Medical Department, Specialty Product group, and the Applied Sciences Section. Minutes of the meeting were published and a plan for the analysis of the tissues generated in these studies developed.
Freezer space for the storage of tissues in St. Louis has been obtained and Industrial Bio-Test Laboratories has been re quested to transfer all tissues from the 2 year chicken and rat studies to St. Louis.
PCB analysis of all tissues from the 3 month and 12 month sacrifices of the 2 year study with rats have been completed. Upon completion of the analysis of the tissues from the final 24 month sacrifice, the PCB residue levels will be corre lated with toxicity results and a review held.
MONS 099378
-10-
Cusfcomor and Plant Support Analysis - St. Louis
No. .of Samples
25
Sample Source Central Soya
Sample Description
Products associated with commercial chicken pro duction
. Status o: Ann ] ys i.;
8/25 Completed Holding
8
Wcstinghouse
Treated Plant Effluents
Complete!
Aqua technics
1 Woodson-Tenent Chicken Feed Laboratories
Completel
2
NCR (Dayton)
24 Hour Storm Sewer
Schedule 1 for
Composite Reclaimed' Oil
Completion 6/4/71
2
J. F. Queeny
Plant Effluent Composite Scheduled for
(April and Hay)
Completion 6/4/71
1
Ohio Dept, of
No. 42379
Agriculture,
Div. of Foods,
Dairies & Drugs
In Transit
3-4 Inter-County Finished Chicken Feed Farmers Coop Assn., Inc.
Woodridge, N.Y.
1
Rozansky Feed
Chicken Feed R110
In Transit
Scheduled for Completion G/9/71
BiodeKradation Testlrn? - St. Louis
Aroclor 1016 and 1142 Distillation Residue
Semi-continuous activated sludge (SCAS) testing of Aroclor 1016 and its distillation residue at a feed rate of 5 mg per 7 day cycle are
continuing. Analysis of the recent data is still in progress. The initial data points were somewhat erratic, as expected.
Trichlorodiphenyl Ether and Tolvlxylyl Sulfone
Two new SCAS units are being started on trichlorodiphenyl ether and
tolylxylyl sulfone to determine the primary disappearance rates of
these materials. At the same.time, development of the analytical
methods that will be used to monitor these materials has been
started.
.
MONS 099379
- 11
Aroclor 5432, Aroclor 5442, Aroclor 5460, Arobrom 54 65, and Hi\-n-
bromobiphonyl
.
'
Development work on the analytical methods for monitoring these matarials continues. Sampling of these units will be started as soon as the analytical methods have been demonstrated. The Aroclor 5460
SCAS unit is showing possible toxic elfects from the test compound a:: witnessed by a decreasing sludge volume and an observable decrease in LAS degradation. Feeding of this unit has been stopped to determine if it will recover.
A review of the progress to date toward developing biodegradation testing methods was held 5/11/71.
Polychlorinated Terphenyls (PCTs)
Attempts to measure PCTs by EC/GC have not been successful. T.ie 300C upper temperature limit of the EC detector did not allow the column temperature to be held high enough to completely elute the PCTs. Fractions of each of the materials were eluted but the relative re sponses indicated that only small percentages of the higher boiling materials were eluted. This approach has been dropped and an ittempt will be made to monitor total organic halogen microcoulomctric.illy.
Aroclor Removal from Waste Water by Adsorption-Flocculation
With the exception of the last two test runs, results show that effluent with an average 61 ppb Aroclor was produced from Influent water with average Aroclor level of 288 ppb by varying
the clay concentration and flow. The result of tests carried out at clay concentrations of 240 and 480 ppb Aroclor and a 2.5 gpm flow show effluent quality less than 50 ppb. (See Tables I and II.) However, there is still considerable fluctua tion in the Aroclor level of the effluent. There Is reason to believe that some residual Aroclor is being carried out on the solids In the overflow since essentially the same effluent
quality is realized regardless of test conditions. This possibility is being checked out.
At clay concentrations of 480 ppm, the economics of using
bentonite clay as an adsorbent becomes questionable. Therefore,
in an effort to realize the desired effluent quality (20 ppm
solids and 10 ppb Aroclor) with a clarification type process,
powdered carbon will be evaluated. Cheaper sources of clay are
also being evaluated. The extent of these efforts are reported
in the work plan issued 5/11/71.
HONS 099380
- 12table 1
AROCLOR REMOVAL BY ADSORPTION-FLOCCULATION
Test Conditions:
'.
* Flow to clarifier - 2.5 gpm
Clay concentration in feed - 240 ppm
Polymer conccntrati-on in feed - 1.5 ppm
Volume
Avg. Influent Concentration Avq. Effluent Concen'ratio-.
Through put (Gal.') SS* 1221 1242 1254 1260 SS* 1221 ' 1 242 1 2 5*. 1 260
3,600 7,200
. 42 75 --
490 590
'
17 64
.5 -15
--
10,800
80 37 --
--
'
46
3 --
--
11,000
33 23
..
8 NDA --
--
*SS -- Suspended solids concentration in ppm's
MUNS 0993a1
' \
`
-13 TABLE II
AROCLOR REMOVAL FROM WASTE WATER BY ADSORPTION-CLARIFICATION
Test Condi tlor.s: Flow to clarifier - 2.5 gpm ' Clay cone, in feed - 480 ppm Polymer cone, in feed - 1.5 ppm
~"
Volume Through out (Gal.)
2,250
5,850
9,450
13,050
16,650
20,250
Avq. Influent Cone.
1221 1242 1254 1260
180 68 -- --
470 63 -- --
163 114 --
--
960 760 --
--
. 94
60 -- --
68 11
.
Avq. Effluent Core.
1221 1242 1254 1260
24 NDA --
. 57
3
43 5 --
57 4 --
--- -..
26 NDA --
--
14 1 .
MOMS 099302
-14-
MANUPACTUniWQ: W. Q. Krummrich Plant
A. Arcelor Department
A major Joss of about 500 gallons occurred during the reworking of wet material that had
been returned from a customer. Material boiled out of tank when heating. Rework procedures are being reviewed and enlargement of the department sump arc actions being taken to prevent another incident. Exclusive of the major loss, the average daily loss from the department was l#/day with a range of 0.03 to 1.8#/day.
B.. Tot a 1 P) nnt - Plant exit losses averaged 21#/day with a range (f 11 to 61#/day. The slug flow loss from the Aroclor Department did not appear of the same magnitude at the plant exit sewer streams. Also, the treatment plant influent stream is about 3-4 times greater than the plant exit. Samples from other Sauget Village industries reveal ins 1gnificant amounts of Aroclor.
C. Trent men.t--pi ant. Effluent - Average daily loss of 27ff/day with range of 8# to 75#/day.
11. Proj ect S talus
.
Two Aroclor units in the.plant remain to be changed to nonPCB type fluid. Dept. 239 Unit scheduled for
mechanical tie-in week of 6/15 to permit fluid change. Dopt. 24S unit to change fluid week of 6/1.
The following are miscellaneous approved projects required to contain losses in the event they occur.
Estimate No.
2095 '
"Aroclor Scrap Rework" EDC 7/1/71 To permit proper rework of returned material to Dept. 246 .
2422
"Paving and Curbing" HDC 8/1/71 To antain losses in tank car and storage area in Dept. 246.
MGNS 0993*3
-15-
2482
"Contaminant Collection at Kip Track" EDC 9/1/71
To permit recovery of T/C washings and
drainings.
_
2675
"Air Pollution Control" EDC 10/1/71
Nitrogen blanket on mix tanks to eliminate atmospheric pollution at Dept. 246.
2811
"Pave Under Thcrminol Unit" EDC 8/1/71 Contain Material in Dept. 246.
111. Program St at us
Very little PCB being found in off-gas system by sampling or trapping. Confirms calculations. No additional equipment required in off-gas system, but present traps should remain an integral part of the system.
Anniston Plant
I. Current, Level: Aroclor losses during May '71 averaged 0.60*/uay {71 pp>.)
II. Projects 6 Evaluation: Only minor work remains on Aroclor Waste TSD projects:
1. No. 2 HC1 neutralization pit will be slightly improved
during annual clean-out in July.. Acid sewering is expected to increase due to full storage. This
makes capability for switch operation of 2 pits much
more important.
,
2. The 36" storm sewer repairs have accomplished the goal of minimizing Aroclor infiltration into storm water.
3. A premise for collection and disposal of spent HC1 carbon will be issued by 6/15. The elimination of this material from the sewer system is the final step currently anticipated in the Aroclor program.
IH. Spills
There were no Aroclor spills during the month of May '71.
MUMS 099384
-16-
Newport Plant
From Octobe:* 1970 to April 1971 inclusive, SI samples of K'cwport wori;s effluent have boon tested for PCD content. The monthly average concentrations of PCB in the works effluent are ns shown below:
Average PCli Content
Uquiv. Pounds Per Day
October November December January February March Apri 1
1S1 263 127 263 247 252 213
ppb
1.51 2.63 1.27 2.63 2.47 2.52 2.13
Changeover cf Santotherm F.R. Heft Transfer Systems
The heat transfer system on the Luwas in the 4-NDPA Plant at present contains Santotherm FR-2. It has been decided not to change this over to Santotherm 66 (HB-40) because of the potential fire hazard which wculd be involved and precautions are being taken to minimize and contain any spills or leakages which may occur from this system.
The only other Aroclor heat transfer system in use at Newport is on the Saitolubc 900 Plant. Changeover of this system to Santaherm 66 is under evaluation, but no change has yet been made .
Disposal of PCB Wastes
The setting up of a system for disposal of liquid and solid PCB wastes (both from Newport works and cuiomcr plants) by
incineration is being negotiated with Purle Brothers Waste Disposal.
W. B. PAPAGEORGE