Document B40GGNBZaGawLLrrRGXVEEMJ

iU TO llutlonyControl Mr. W. 7t. Pappgeorge General Offices v. . i --vr;' 1< . 'iTfnWTFd :- "C . b. ' j. n. Savage G.O.-' p. B. Dodges t;. n. F. He Dona 1 d I'd.-v.'port H. l. wu.llai'T- Anri.' :.v on D. w. Jackson D. w. Corlew C. F. Buck 1ey R. M. kcCulcLrn B. Y oung W. C. Engir.an A. L. Rannuuseii As a first step, all poin fciiil uni on were Identified, the attached list. Obser inspection are Included. stent in 1 Arcelor ? 1 r These ai'e summarized in made at the time of The plant pollution group has received equipment which should enable us to quantify this amount of Aroclcr being lost to the atmosphere from all points where a flow is occurring. Sources like Thermlnol vent lines that arc only breathing will bo sampled, but data will be noi-o qualitative than quantitative. Sampling will also bn done nt various plant locations to doteraine whether or not there is a detectable amount outside u<*lng or prckiclug arenr. Sampling will begin in August. Level of sir Jo..r.r. . will be determined and a reduction program laid out by the end of the month. Obvious pi-oblcm ureas such ac the Tl.civilm i. furnace!, in Departments 239. 2^5. 2<R> and 2lyj v;ili receive; immediate attention. /gjs attachment W. A. Krull M. A. Pierle HONS 099039 WATER PCB-SD0000021949 ) 'Die following aro points of Aroclor vapor losses within Dept. ?l16. . Source Estimated Loss 1. Drowning Jot ctack 2. Fumo removal stack 0.1^/day Unknown 3- Vacuum Jets (6) H. Thermino] furnace Unknown Unknown 5. SLoraco tanks (9) ' 6. Tank car loading (2) 0.5#/day 0.25#/day 7. Trailer loading (l) 8. Finished product tanks (JJ) 0.25#/dny <. 0.]#/day 9. Blend tanks (2) 10. Surge tanks (2) v 0.l#/day . c 0.l#/day ii. #6, ti7, //0 chlorlnator sampling points ' Unknown 12. Mix tanka (3) 0.25///day 13- Intermediate storage tank 0.1^/day huns 099040 WATER PCB-SD0000021950 Thi` following arc potential sources of Aroclor atmosnhcrlc cmion lone from non-Aroclor producing departments at W.C.K. Source Remarks 1. Dept. 222 cooling system vent. Low probability due to low operating temp. 2. Dept. 222 heating vent. 3. Dept. 248 cooling system vent on surge tank. System not yet in operation. Low prob. due to lov; temp. No noticeable odoru or fumes upon inspection. 4. Dept. 248 heating system vent on surge tank. 5. Dept. 239 surge tank vent. Material leaking from vent to 55 gal. drum. Odors present In area. Heavy fumes and odors reidlly noticeable in area. 6. Dept. 245 surge tank vent. Fuming heavily from corroded vent. Material visible on concrete and chat around unit. Odors in immediate area. 7. Dept. 273 surge tank. vent. Vent is rigid pipe to newer. System not operating at time of inspection. 8. Dept. 270 surge tank vent. 9. Dept. 243 tank vents. System used for chlorlnator cooling. Vent discharge to chat. Vislole signs of material on chat beneath vent. No odors or fumec at Inspection. Vents are covered with loosely fitting caps. No noticeable fumes or odors. 10. Dept. 244 pump tank vents. Fumes and odors present during use and transfers. 11. Dept. 275 surge tank vent. Vents to collection bucket at ground. No fumes, odors, or material noticeable at unit. 12. Dept. 258 surge tank vent. Tank vents to room on third floor In operating dept. Unit used only during DDS production. 13. Dept. 255 surge tank vent. Vents to either 8" sewer pipe or to air considerable fuming due to 300C temperature. MUNS 0990*1 WATER PCB-SD0000021951