Document B1RZkXvdaxjQmndJ1xEG0KoL

tw I -- V*. I MANAGER ENGINEERING FIELD KA. h. J. NELSON r,,..-., `'ELi'EMSER 13, 1974 nw '-17 GEE SAFETY WOOD RIVER REFINERY .uiject ASBESTOS SAMPLING SUMMARY To monitor the effectiveness of the asbestos handling procedures instituted in 1972, samples of work activities were taken during May and July, 1974. The initial set of samples taken on May 30 involved demolition work at the old Distilling 2 area south of the Distilling 1. The work assigned involved removal of asbestos bearing materials from pumps and piping in the area immediately north of the old Distilling 2 control room. This was grade level work and the refinery practice for handling asbestos bearing materials was used. Two Insulators were assigned, Mr. Meiners and Mr. Pence. In reviewing their activities, it will be noted that sample nos. WRR-5 and WRR-6 exceed the maximum fiber count of 10 fibers per milliter of air by 2.72 and 3.3 fibers. In addition, the time weighted averages of 4.2 and 4.9 are higher than we would anticipate but do not exceed the allowable standard of 5 fibers per milliter of air. From observation of field activities, it was anticipated that more dusts were being generated than necessary. More water was used in wetting down and better handling procedures were used on the next day, May 31. Test results reflect this improved handling. A second set of samples was taken on July 25 and 26 reviewing job procedures to assure adherence to refinery practice. Work performed was similar to the May test and in the same area. It should be noted that greater emphasis on normal refinery practice brought all sample results below maximum fiber counts of 10 fibers and the current time weighted average standard of 5 fibers and the future time weighted average standard of 2 fibers (effective July; 1976). These tests again reaffirm that control of this activity is necessary to meet requirements. The following steps are necessary for control: 1. Have pressured water hose,on the job site at all times while removing asbestos. 2. Wet down asbestos before dropping it'(by hand line) to ground, keeping ground wet in area of drop. 3. Wet down asbestos after it is on the ground and before bagging. In the light of these results, we suggest that the training program completed in 1972 by Mr. Jim Thompson, Craft Supervisor, Field Craft Group, be repeated in the immediate future and that all employees (including foremen) exposed to asbestos bearing materials (Insulators) participate in this training. We would be happy to offer any assistance in course composition, material, and/or presentation that you deem necessary in executing this program. We would request that attendance at these meetings be documented and a copy of this training attendance be forwarded to the Safety Department. LAM 019520 ABS-000331 MANAGER ENGINEERING FIELD MR. C. J. LELSCN In addition to the above Insulator testing, we received a request from the Tinners to evaluate the exposure to cutting asbestos gasket bearing materials in the Tin Shop. Included in these results is one test for Mr. A. Fritzche, Tinner 1. We have determined by this evaluation that no exposure exists in this activity. These results have been conveyed to Mr. Fritzche and the ether Tinners at the time the test results were available. If we can be of further assistance in this area, please let us know. BLB/mah Attachments cc-Messrs. P. E. Slack J. D. Terry H. G. Rollins Safety Department File LAM 019521 ABS-000332 RE: CONVERSATION ROLL INS / El !S HOUSES'/PENCE SHOWER TIME ''.} Received a call from Mr. Emshousen approximately 1:30 p.m. on Thursday, September 5, 1974, requesting a conversation on the subject of shower time. " I met Mr. Emshousen and Mr. Pence at the Lube Zone Shop and invited them to join me in my car. Mr. Emshousen referred to Mr. Willens, Illinois Department of Labor Industrial Hygienist, visit of March 21, 1972. Bonnie sited the conversation between Willens/Rollins/Emshousen alleging 80Z shower time for the Insulators (asbestos workers). I reviewed with Mr. Emshousen and Mr. Pence that Mr. Willens visit was to relate to the exposure of our Insulators to asbestos bearing materials. The conversation referred to by Mr. Emshousen covered our practice at that time of giving approximately 80% of the crew shower time for work with asbestos bearing materials. We, however, did not cover the subject of non-asbestos bearing materials. Bonnie eluded to a conversation during '72 negotiations with Mr. Kastner and the contract in which asbestos workers should be given shower time 1002 of the time regardless of the material that they were working with. He reiterated recent experience where Engineering Field had tightened up on shower time and they were down 302. When asked what the present level of shower time was, he indicated it was 702. The percentages quoted indicate the number of the crew who are receiving shower time each day. After numerous words, it was agreed that Mr. Rollins would review with Mr. Nelson. Mr. Nelson would have a conversation with Mr. Emshousen covering the results of recent asbestos testing, the role of shower time for this activity, and plans for an Insulator training program covering asbestos procedures. Included in the training program should be clarification on when asbestos procedures should be utilized, i.e. recovering asbestos bearing insulation when the procedures justify this expenditure in craft time. HGR/mah 9/12/74 cc-Messrs. E J. Nelson P. E. Slack J. D. Terry H. G. Rollins Safety Department File LAM 019522 ABS-000333 SUMMARY ASBESTOS MONITORING RESULTS OLD DISTILLING if2 . 5/30/74 5/31/74 4.925 1.14 V 4.23 2.50 \ 7/25/74 0.33 0.45 7/26/74 3.66- 1.8 GASKET CUTTING TABLE TIN SHOP 5/16/74 0.072 lam 019523 ASBESTOS SAMI LLP MAY ?G, 157/- PENCE - INSULaTO- , EMPLOYEE NO. IEEl TIME 0800-0820 SAMPLE NO. out of area. LEVEL 0 EL.` PS ED 7 THE x FLOW*** 20 x 0 0820-0900 0900-10:00 10:00-11:00 11:00-12:00 WRR-1 WRR-3 WRR-5 WRR-7 2.72 7.65 \ 12.72 0.47 40 x 2 60 x 2 V 60 x 2 60 x 2 CONCEN'TRAT FI BEUS 0 217.6 918.0 1526.4 56.0 12:30-13:30 13:30-15:00 15:00-16:05 16:05-16:30 WRR-9 WRR-11 WRR-13 out of area 5.62 1.38 3.26 60 x 2 90 x 2 65 x 2 674.4 248.4 423.8 0 4064.6 TWA = 4064.6 =4.23 fibers 8x60x2 *Fiber^> 5^6^/tnl air **Instrument calibrated at 2 liters per minute flov rate. LAM 019524 ABS-000335 TIME 0800-0820 0820-0900 0900-1000 1000-1100 1100-1200 1200-1230 1230-1330 1330-1500 1500-1605 1605-1630 ASBESTOS SAMPLES MAY 30. 197') MEINERS - INSULATOR ;/l EMPLOYEE NO. 8315 SAMPLE NO. LEVEL ELAPSED TIME x FLOW*** out of area WRR-2 5.77 WRR-4 4.68 v WRR-6 13.30 0 40 X n 60 X 2 60 X 2 WRR-8 out of area WRR-10 WRR-12 WRR-14 out of area 9.82 1.50 0.50 5.08 60 X 2 0 60 X 2 90 X 2 65 X 2 CONCENTRATION FIBERS 461.6 561.6 1596.0 % 1178.4 180.0 90.0 660,4 4728.0 TWA = 4728 = 4.925 8x60x2 *Fiber^ 5/^ /ml air **Instrument calibrated at 2 liters per minute flow rate. LAM 019525 ABS-000336 TIME 0800-0900 0900-1000 1000-1100 1100-1200 1200-1230 1230-1330 1330-1430 1430-1530 1530-1605 SAMPLE NO. ASBESTOS SAiLPLES MAY'31, 1974 PENCE - INSULATOR Si EMPLOYEE NO. 1S86 7 ELAPSED LEVEL TIME x FLOW** WRR-15 WRR-17 WRR-19 WRR-21 out of area WRR-23 WRR-25 WRR-27 WRR-29 0.15 0.30 1.99 3.18 3.92 0.14 9.87 0.78 60 x 2 60 x 2 \60 x 2 60 x 2 60 x 2 60 x 2 60 x 2 35 x 2 CONCENTRATION FIEERS * IS 36 238. S 381.6 % 470.4 . 16.8 1184.4 54.6 2400.6 TWA = 2400.6 = 2.50 8x60x2 *Fiber^> 5^/ral air **Instrument calibrated ac 2 liters per minute flow rate. LAM 019526 ABS-000337 TIME 0800-0900 0900-1000 1000-1100 1100-1200 1200-1230 1230-1330 1330-1430 1430-1530 1530-1605 ASBESTOS SAMPLESMAT 31, 1974 MEINEP.S - INSULATOR fll EMPLOYEE NO. 8315 SAMPLE NO. LEVEL ELAPSED TIME x FLOW** WRR-16 0.73 60 x 2 WRR-18 0.45 60 x 2 WRR-20 1.71 '60 x 2 WRR-22 0.76 60 x 2 out of area WRR-24 2.23 60 x 2 WRR-26 0.20 60 x 2 WRR-28 2.71 60 x 2 WRR-30 0.37 35 x 2 CONCENTRAT ION FIBERS 93.6 54.0 205.2 91.2 273.6 24.0 325.2 25.9 1092.7 TWA = 1092.7 = 1.14 960 *Fiber^> 5^/ml air **Inscrument calibrated at 2 liters per minute flou race. LAM 019527 ABS-000338 TIME 0800-1000 1000-1200 1200-1230 1230-1400 1400-1610 1610-1630 SAMPLE NO. ASBESTOS SAMPLES JUwY 25, 1974 W. 5YDALL - INSULATOR EMPLOYEE NO. 7702 i LEVEL ELAPSED TIME x n.rnv** WRR-31 WRR-34 out of area WRR-35 WRR-37 out of area 0.27 0.41 \\ 0.62 0.62 120 X 2 120 x 2 \ 90 >: 2. 130 x 2 CONCENT RAT ION FIBERS 64.S 98.4 111.6 * 161.2 436 TWA = 436 = 0.45 960 *Fiber^> 5^/ml air **Instrument calibrated at 2 liters per minute flow'rate. LAM 019528 ABS-000339 TIME 0800-1000 1000-1200 1200-1230 1230-1400 1400-1610 1610-1630 ASBESTOS SAL/LP JULY 2:s C7 ' A. EMSHOUSEN - INSULATOR EMPLOYEE N'O. 2016 SAMPLE NO. LEVEL ELAPSED TIME x FLOW** WRR-32 WRR-33 out of area WRR-36 WRR-38 out of area 0.26 0.32 \ 0.73 0.19 120 x 2 120 x 2 90 x 2 130 x 2 ' CONCENTRATION FIBERS 62.4 76.8 131.4 49.4 320 TWA = 320 960 = 0.33 *Fiber ^ 5/^/ral air **Instrument calibrated at 2 liters per minute flow rate. LAM 019529 ABS-000340 TIME 0800-1000 1000-1200 1200-1230 1230-1410 1410-1610 1610-1630 ASBESTOS SAMPLES JULY 26,1974 W. SYDALL - INSULATOR EMPLOYEE MO. 7702 SAMPLE NO. LEVEL ELAPSED TIME x FLOW** WRR-39 0.50 120 x 2 WRR-41 1.74 120 x 2 out of area \ WRR-44 \ 2.13 100 X'2 WRR-45 3.23 120 x 2 out of area CONCENTRATTON FIBERS * 120.0 417.6 426.0 775.2 1738.8 TTTWTAA = 1n7iO38.8O =1.8 960 *Fiber^> 5 /Z^/ral air **Instrument calibrated at 2 liters per minute flow rate. lam 019530 ABS-000341 ASBESTOS SAMPLES MAY 16, 1974 A. FRITZCHE - TINNER i?l EMPLOYEE NO. 1SS3 TIME SAMPLE NO. LEVEL ELAPSED TIME x '/LOW** 0300-0920 out of area 0920-0940 WRR-1 0940-0945' out of area 0945-1015 WRR-2 1015-1045 WRR-3 1045-1100 out of area 1100-1140 WRR-4 1140-1235 out of area 1235-1300 WRR-5 1300-1330 WRR-6 1330-1400 VTRR-7 1400-1430 WRR-8 1430-1500 WRR-9 1500-1530 WRR-10 1530-1630 out of area TWA - 69.4 = 0.0722 960 0.14 \ 0.20 0.16 0.15 0.10 0.09 0.09 0.08 0.07 0.09 20 x 2 30 x 2 30 x 2 40 x 2 25 x 2 30 x 2 30 x 2 30 x 2 30 x 2 30 x 2 * *Fiberp> 5 Xijm-l air CONCENTRAT TON EIDERS 5.6 12.0 ' 9.6 .12.0 5.0 5.4 5.4 4.8 4.2 5.4 69.4 **Instrument calibrated at 2 liters per minute flow rate. LAM 019531 ABS-000342 INDUSTRIAL HYGIENE REPORT OF REFRACTORY REMOVAL FROM #27 BOILER SULPHER RECOVERY UNIT APRIL 19, 1934 BACKGROUND v As part of the Shell major projects, Insulating and Materials was requested to remove asbestos containing refractory materials from the north end of #27 Boiler in theSulpher Recovery Unit (SRU). The material being removed had been used to seal the head of the boiler. A bulk sample of this material was obtained and analyzed on April 18, 1984. The analysis indicated an asbestos content of approximately 15%. Because of the asbestos content careful removal procedures were utilized. The two insulators were trained in asbestos removal techniques and are experienced in removal work. Appropriate protective equipment was provided and worn during the removal. The protective equipment was as follows. 1) disposable coveralls with hood, 2) MSA Comfo II 'with type S cartridge and, 3) gloves. Prior to starting the job both employees were observed and instructed by the MPO industrial hygienist in conducting positive and negative pressure fit test of the respirator face piece. The material removed was a hard refractory material that -1- LAM 019532 ABS-000343 required the use of chisels and hampers tc loose. Dusting was reduced by periodically wetting the refractory material with y water. Egg sized pieces were removed and immediately placed in appropriate plastic bags. This greatly reduced area contamination. The work platform was also covered with a plastic covering to catch falling debris. INDUSTRIAL HYGIENE MONITORING To evaluate exposure to the insulators performing the removal and potential exposure to the area two personal and two area samples were obtained. Sampling was conducted on April 19, 1984, during active removal and represents worst case conditions. At the beginning of the removal one employee removed a small portion of the refractory material without wetting. His exposure was 0.063 fibers/cc. This employee's exposure was significantly greater than the second (0.005 :fibers/cc) employee, who worked using wet methods during his entire exposure. Both area samples were negative. Table I contains the results of this survey. CONCLUSIONS Because of- careful work practices employee and area exposure was minimal. The work area was cleaned up well after completion of the job, and no secondary exposure is expected. - .2 - LAM 019533 ABS-000344 TABLE I AIRBORN FIBER CONCENTRATIONS SULFER RECOVERY UNIT Shell Wood River Refinery April 19, 1984 \ Sample Number Location SRU-1 West side of control area SRU-2 East side of control area SRU-3 SRU-4 N.D.=None Detected Fiber Concentration (F/CC) N.D.* N.D. 0.063 0.005 LAM 019534 ABS-000345