Document 9Zbm4GXOvwrLkbnLKrzdRymp

r\ In Distribution C. V* Turner July 9* 1983 REACTOR SLURRY SAMTLES Tirrlmfnf 1 regulations Unit thi VCM amissions fr ruetor batch. In ordar to coaply with thoon regulations* reactor botch la ateen icrlfH* sampled during and tly aaalyaed for VCK realduela. The of obtaining a alurry realdual aanpla for every batch van recently healsed in noetlaga with all Vinyl Operatlone personnel. The purpose of thin latter in to document the proaodoran which hare established for obtaining and handllag reactor slurry roeideal a--plea* 1. The slurry le la to be taken at the la point op of the at flwo to t iate the After the A-operater has obtained the aanpla* ha should radio the Load Operator to ceeflm ha haa the If the A-oporater haa net coaflmed obtaining the saaple within ton minutes into the dean* than the should contact the A-operator and* if necessary* atop lag the reactor until the aanpla can be collected. Collect' lag the slurry residual aanpla la the shared responsibility of both the Load and A-opermtors* and both indiwldnala oust dananatrata the Initiative to ensure the samples ere collected. 2 The A-operator in to bring the aanpla to the control i soon aa practical after it is caught and the Lead Operator la to verify the on the aanpla correct. The labeling should ba checked against the reactor status report and the blend Ha will than verify chat ho haa on the aanpla bottle by underlining the reactor status report (bar chart). The battle be wrapped with adhesive tape to pro- of the cap 3 After the labeling (reactor wanker* bland nuhber* batch > shift latter designation* data and product) has by the Land Operator* than the A-operator shoe place the sa^le bottle in the aanpla bottle basks It into the residual aanpla log book (blend nunber* reactor * and A-operator initials). ifr^L VAB.0001136487 Distribution 7/9/89 P 2 4. fill Lab Tadmieiaa picks up cba alurry raaldnal ha will varify that ha plekad up Mch with .hia Initials la tha residual la log book 5. If a soapla la brokaa or dlscofcnC to ha aiaalag, thaa It vat ha raportad f--ill Italy to tha Vinyl Shift Supervisor. Tha Shift Supervisor will Investigate cod doeuvaat tha raaaoaa for tha brokan/alssl&f soapla. Failure to eollaet and aaalyaa a slurry raaldnal aaapla for ovary raactor batch la a aarloua problav that requires thorough firllow up. If a aaapla la aiaaad dva to oparacor nag11panea, disciplinary action any ha takan. Our objective t ha to never niaa a raactor alurry raaldnal c&.'i C. V* Turnar Vinyl Oparatloua Supervisor rah p ccs 411 Vinyl Oparatlona Faraoonal / JF, JWf9 DMU UHt J8V VD(. 14ft DSC,-M VAB.0001136488 Wastewater Stripp, 6j.65 (t)(9)(t) I I y I i 1 I ? L h * i l S f * VAB.0001136489