Document 9RRGbwRXYrVa8De74qJ3dZKV
1 A Yes.
Page 2406
2 Q Okay. I would like to dothe samething.
3 Let's assume a six-day work week.
4 A Sure.
5 Q So we take the 100 daysand wedivide them
6 by six and if my math is correct, we get somewhere
7 between 16 and 17 weeks, right?
8 A Correct.
9 Q Okay. I think that both Mr. Carter and Mr.
10 Butler testified when they got to the garage at
11 Preston Street, the vehicles that they were working on
12 were pretty old.
13 Is that your recollection?
14 A Yes, sir. The immediatepostwar period.
15 Q I think it might have been Mr. Carter who
16 actually said they were falling apart.
17 A Yes.
18 Q So taking the range that we have already
19 established, which is if you have nine brake jobs a
20 day, it would take five and a half weeks to get
21 through the entire fleet, and if you have three a day,