Document 9KG9BE5Gb6bJVzDROJrq1aqL
Asbestos Dust Control October 17. 1972
I
2 - Methods of comp 11 anee (Cont'd.)
'
C - Vacuuming of all asbestos material storage areas and work shops at least once each week. In the case of asbestos work shop areas, It Is further recommended that they be vacuumed at the end of
each work day that asbestos materia) was processed (handled, fabricated, etc.)
D - All asbestos scraps to be sealed In a plastic bag and labelled prior to disposal.
E - The consuming or storing of food should not be allowed In pipe covering shop.
3 - Warning signs and labelling Asbestos Dust caution^ signs have been ordered as per proposed Engineering Standard S4T, Figure 1. These signs are enclosed
In an acrylic cover and are from the same vendor that supplies this sign for the Construction Division. A sign should be secured to the pipe covers shop until such time as the proposed
"asbestos .room" Is completed, then the sign should be relocated
to that door.
Asbestos warning signs to be posted at each plant work aread (outside of pipe coverers shop) ih'whlch asbestos work is ' being done.
It will be necessary to attach a label (Engr. Std. S4T, Figure 2)
to all raw material or scrap bags containing asbestos products.
The appropriate labels are to be printed up.
h - Monitoring
The OSHA regulation request that there be personal and environmental monitoring at intervals no longer than six months. After receipt of the Bendlk sampler a program wilt be started whereby each plpe-coverer will Initially be sampled five times (the high and the low samples to
be thrown out) . The average of the remaining three samples
to be compared with subsequent samples taken at six month Intervals.
Form EN2731 is on order from the Engineering Department to provide the appropriate form for record keeping .
Purchasing is searching for testing labs that can make the
proper, analysis of the test filters. So far they have made contacts with two such testing labs and are getting cost
estimates for this type of work. .
2.
DUP 0903014