Document 9K3RK6ExwmQV5MDGnwN7XNq7
REVISED
8/8/84
SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN TENNECO POLYMERS, INC. PASADENA PLANT
Prepared By: J. W. Kachtick, P. E. T. T. Moore
August 8, 1984
TEN0 716
,<'< '/* ; I'm
i> f* '
no! 11
SPILL PREVENTION CONTROL & COUNTERMEASURE PLAN
PART I (J KN Eli A I, INFORMATION
1. Name of facility.
Tenneco Polymers, Inc. - Pasadena Plant
2. Type of facility.
Chemicals Manufacturing
3. Location of facility. 4403 LaPorte Road
Pasadena, Texas 77501
4. Name and address of owner or operator:
j^ame ________ Tenneco Polymers, Inc.
Address___
P. 0. Box 849
Pasadena, Texas 77501
5. Designated person accountable for oil spill prevention at facility: Name and title c- Hendricks, Production Manager
6. Facility experienced a reportable oil spill event during the twelve months prior to Jan. 10, 1974
(effective date of 40 CFR, Part 112), (If YES, complete Attachment #1.)
.
MANAGEMENT APPROVAL
This SpCiTJPlarCAvill be implemented as herein described.
Signature_
Name Title
_JL_BlJ0-glr_3-
Vice President - Chemicals
CERTIFICATION
I hereby certify that I have examined the facility, and being familiar with the provisions of 40 CFR, Part 112, attest that this SPCC Plan has been prepared in accordance with good engineering practices.
James W. Kachtick
Printed Name of Registered Professional Engineer
j?/<5
Sig'fl&ture of Registered Professional Engineer Registration No. 47027 . State
(Part I) P*fe 1 of 3
TEN0 717